Crown molding, fitted to the ceiling you have.
Crown molding is the trim that covers the joint where the wall meets the ceiling. We cut it, cope the corners, fit it to ceilings that are rarely level, and leave it ready for paint.
- Ceilings are rarely level or flat. Good crown is fitted to hide that, not to show it.
- Size follows ceiling height. Crown that is too large crowds a low room.
- Crown goes up before final paint, and after any ceiling or wall repair.
- Crown moldingCovers the joint where wall meets ceiling. Its size should suit the ceiling height.
- Door casingThe trim around the opening. It hides the gap between the door frame and the wall.
- BaseboardFollows the floor. Inside corners are coped so they stay closed as the house moves.
How a coped corner is cut, frame by frame.
- Run the first piece inThe first length is cut square and pushed tight into the corner.
- Miter the second pieceThe second length gets a 45° cut. The cut edge shows the outline of the molding.
- Cope to the lineA coping saw follows that outline, back-cutting slightly, so only the face of the molding remains.
- Fit the jointThe coped end overlaps the face of the first piece. Wood shrinks in dry weather. A miter opens; a cope stays closed.
Built by Tom. Fifty years of custom cabinets and finish carpentry, from Oregon and Hawaii to Malibu, Pacific Palisades and Westlake Village, and now from Goleta to Carpinteria. Meet the carpenter
What is included.
- Crown molding in wood or MDF (a smooth, stable board made for paint), in the profile you choose.
- Coped inside corners: one piece cut to the outline of the other, so the joint stays closed.
- Mitered outside corners, glued and pinned so they do not open.
- Built-up crown: several simpler pieces stacked to make a larger, deeper profile.
- Backing blocks fastened to the framing, so the crown has something solid to nail to.
- Filling nail holes and caulking the top and bottom edges, ready for the painter.
You send photographs of the rooms and rough wall lengths, and we talk through size and profile.
We measure on site and check the ceiling for dips and for corners that are out of square.
Material is delivered and left in the house to adjust to its air before it is cut.
Backing goes up, then the crown is cut, coped and fastened wall by wall.
Joints and nail holes are filled and the edges caulked, and the painter follows.
Decide these first.
- Size. Taller ceilings carry larger crown. In a room with a low ceiling, a small profile or none at all often looks better.
- Profile. Curved and stepped for a traditional house, flat and angled for a modern one. It should agree with the casing and baseboard.
- One piece or built-up. A built-up crown gives a large profile from stock pieces and hides an uneven ceiling better.
- Material. MDF paints smoothly and costs less. Solid wood is the choice for stain and for rooms that see moisture.
- Which rooms. Crown that stops at a doorway needs a planned ending, so decide where it starts and stops.
- No gap along the ceiling or the wall, and no thick bead of caulk doing the work of a good fit.
- Inside corners that are coped and stay closed through a dry summer.
- Outside corners that meet in one clean line, with the profiles lined up.
- Long walls joined with an angled overlap (a scarf joint), placed where the eye does not go first.
- A line that looks straight from across the room, even where the ceiling is not.
- Total length, and the number of inside and outside corners.
- Profile and material: a single stock MDF profile costs least, a built-up crown in solid wood the most.
- The ceiling. A ceiling that waves or slopes takes more fitting, and tall rooms need staging to reach.
- Finish. Stained crown shows every joint, so it takes more time and better stock than painted.
Prices vary with the materials and the hours a job takes. Each job is custom and unique, so we price it once we have seen the room.
Ceilings and upper walls we have finished, photographed.
Beams, coffers and ceiling woodwork from photographed jobs, shown so you can see how a ceiling line is finished in context.




Crown molding: what owners ask.
What is the spring angle of crown molding?
How do you install crown molding on an uneven ceiling?
What size crown molding suits my ceiling height?
Should crown molding corners be coped or mitered?
Built in our small boutique shop in Carpinteria where the piece is custom, and fitted on site in:
Crown molding in CarpinteriaCrown molding in SummerlandCrown molding in MontecitoCrown molding in Santa BarbaraCrown molding in Hope RanchCrown molding in Goleta
- Custom cabinetry
- Baseboards
- Door and window casing
- Window installation
- Door installation
- Custom shelving
- Hardware installation
- Crown molding
- Wainscoting and wall paneling
- Built-ins
- Custom closets
- Stair railings and treads
- Fireplace mantels and surrounds
- Ceiling beams and coffered ceilings
- Kitchen cabinet installation
- Bathroom vanities
- Custom furniture and pieces
- Trim and door repair
- Exterior trim
California license802739
- Class B General Building, public at the state
- General liability insured; certificates on request
- Two-year written workmanship warranty
- Built and fitted by Tom and Nic themselves
Have a room in mind? Send us the photographs.
Email photographs of the room and rough measurements to purchasing@amnbuild.com. Matt reads it himself, or use the three-step form.
Already worked with Tom or Matt? Tell others how it went, on Google.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated October 2026