Building in Santa Barbara.

The Riviera, the Mesa, San Roque, the Upper East. Inside the City, we know which board your address answers to before anything is drawn.

The ground

Same drawings, two different projects. A steep Riviera lot and a level Mesa lot part ways in site work, not finishes: on the hillside, access and drainage drive cost more than area does.

The RivieraThe MesaSan RoqueUpper EastLower RivieraSamarkandOak Park

Mission Canyon and parts of the foothills have Santa Barbara addresses but are County land, reviewed by the County. We check which side first.

Santa Barbara and its neighbors, from our map of the South Coast. Select a photograph to see the project. The whole coast

Authority

Three City boards. Which one is yours?

The City runs its own building and planning, separate from the County. Most houses go to the Single Family Design Board; in El Pueblo Viejo, to the Historic Landmarks Commission, where new work follows “the adobe, Spanish Colonial Revival or Mediterranean tradition.” Commercial and multi-family go to the Architectural Board of Review. Each board has its own hearing calendar. We sequence around it.

Assess your parcel

The file on Santa Barbara

Which City board, then the permit.

  1. Design review

    Single Family Design Board

    Most exterior changes to a house, judged on fit with the neighborhood in size and design. Downtown, in El Pueblo Viejo, the Historic Landmarks Commission reviews instead. City of Santa Barbara

  2. Coastal

    Coastal permit, where it applies

    Coastal Zone parcels answer to the City’s Coastal Land Use Plan, certified August 2019.

  3. Building

    City Building & Safety

    Plan check, then inspections to final.

  4. Then

    We build

    Seven phases, three exits, and a price that holds. The road map.

Worth knowing

1925June 29

The earthquake. The city rebuilt in Spanish Colonial Revival; an Architectural Board of Review formed within days. City of Santa Barbara

6–12inches a year

How fast the City’s bluffs have historically retreated. City LCP, coastal hazards

2025April

New CAL FIRE maps add fire hazard zones inside the city: parts of the Mesa near Cliff Drive, northern San Roque and La Cumbre. City of Santa Barbara

18.98inches of rain

An average year downtown, about 80% of it December through March. That is why the building year matters. NOAA 1991–2020 normals

6Title 24 climate zone

The state energy code lists Santa Barbara in Climate Zone 6. Confirm by ZIP for current work. California Energy Commission

Checked September 2026 against the sources linked. Boards, plans and maps change, and parcels differ; we confirm your parcel’s position in the assessment.

Questions

Which board, how long, what it costs.

Which design board will review my house?
Usually the Single Family Design Board. Interior-only work, generally none. What each style asks of a renovation.
How long does a City permit take?
Interior-only work without design review moves fastest. A board or a variance puts you on that board’s hearing calendar.
Can you work on a designated historic property?
Yes. A Structure of Merit or a house in a historic district goes to the Historic Landmarks Commission. Materials and details are chosen with that in view.
What does a Santa Barbara renovation cost?
Our renovations run $250,000 to $2,000,000. Hillside sites, historic review and older structures push toward the top.

Inquiries

Send the Santa Barbara address. We’ll tell you which board reviews it.

Write to purchasing@amnbuild.com. Two business days, in writing, at no cost.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.