Homes built in Santa Barbara, Montecito and CarpinteriaSix projects, finished and photographed.
Built, not rendered. Every one carried by the same principal, from the first walk of the parcel to final signature.


The Loureyro Property
Custom residence
Built from the ground up in Montecito, 2019 to 2023: a plan drawn around the family's day, a specification chosen for the coast.
See the project

Mission
Full remodel
A full remodel near the Mission in Santa Barbara, around the original vaulted ceilings and trusses: wide-plank floors, a walk-in pantry, a green quartzite vanity.
See the project

Palo Alto
Ground-up accessory dwelling, with pool
A ground-up accessory dwelling in Palo Alto, with a pool and an outdoor kitchen.
See the project

San Roque
Full remodel
A full remodel in San Roque, Santa Barbara: walnut paneling, a hand-troweled plaster hood over a marble slab backsplash, and baths in glazed tile and terracotta.
See the project

Westside
Full remodel
A full remodel on Santa Barbara's Westside: a new floor plan with an added home office, new skylights, custom cabinets and new tile baths.
See the project
Carpinteria
Junior unit, converted from the garage
A junior accessory dwelling unit converted from a garage in Carpinteria: a vaulted kitchen with butcher-block counters, a tiled bath, and a door to the garden.
See the projectMatt and team did a great job on our project. Good with communication and timelines and of course a high quality finish and product overall.
RenovationCustom residenceAccessory dwellingCommunities we serve



Palo Alto
Ground-up accessory dwelling, with pool · 2025
About 250 miles from Santa Barbara
See the project: Palo Alto


The South Coast map
Built by Matt Newman. Licensed since 2001. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Send us the address. We'll tell you the truth about it.
Email it to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated November 2026