Custom residences. Decided in the right order.
You want to build the right house, once.
- Range
- $1.5M–$5M
- Construction
- 10–18 months
- Warranty
- Two years, workmanship
Here entitlement, not the build, sets the schedule: grading, fire access, view corridors, coastal jurisdiction, and in several communities an architectural board with its own calendar. We flag what we can see from the parcel before design begins; your architect and the agencies confirm it.

Sequence, not speed.
The order of decisions drives the schedule. Siting, massing, grading and access go to hearing, so they are settled first. Interiors carry lead times, not approval risk, and are resolved while entitlement runs.
A finished interior specification is worth very little if a board changes the massing.
Finishes are about a fifth.
Roughly a seventh of the cost is in the ground before anything shows, considerably more on sloped or coastal parcels. Structure and envelope, typically over forty percent. Interior finishes, the part everyone photographs, usually a fifth. Know it before selections: it shows where a budget can flex.
Your architect's set, priced as drawn.
We are not design-build. Matt works with a team of wonderful architects who will help you build your dream. We price the set your architect drew, flag what won't build before plan check, and return it marked up, not rewritten. The client relationship stays with the architect who earned it.
- Sloped, constrained, and coastal-zone parcels
- Review bodies and schedule mapped before design development
- Architect and engineer coordination from the first week
- Allowance schedules you can plan against
- Fixed contract sum before construction begins
- Two-year workmanship warranty from final signature
Where the sun lands, through the year.
At Santa Barbara’s latitude the noon sun stands about 79° high at the June solstice and about 32° at the December solstice. Move the date, hour and eave, and watch where light falls in a south-facing room.
- Sun height
- Direction
- Into the room
Sun position computed with the NOAA solar equations for 34.42° N, 119.70° W, in Pacific time. A 9-ft room with its glass 2½ to 8 ft above the floor, drawn to scale.
Built by Matt Newman. Licensed since 2001. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Send us the address. We'll tell you the truth about it.
Email it to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated November 2026
