AMN Construction
AMN Construction · Renovations · Kitchen remodels

Kitchen remodels. The cost is behind the walls.

You want a kitchen you can cook in, with people in it.

Range
$120K–$450K
Construction
10–20 weeks
Warranty
Two years, workmanship

Water, gas, power, ventilation and structure all meet in this one room.

A kitchen range under a curved hand-finished plaster hood, with a full-height veined stone slab backsplash and ledge, cream Shaker cabinets, a black steel window, and walnut panel cabinetry with brass pulls
San Roque, Santa Barbara · Full remodel
The kitchen: a concrete-finish waterfall island with oak stools, oak drawer fronts in gray-green frames, a white paneled range hood over handmade tile, and the glass wall slid open to the garden
The kitchen, with the glass wall open to the garden · The Loureyro Property, Montecito

Detail

What you shop for is under half.

Cabinetry and stone: usually under half the cost. The rest nobody photographs. A moved gas line. A bigger panel for an induction range. Make-up air for a high-CFM hood. The dining-room wall doing structural work nobody drew.

DivisionShare
Demolition and structure16%
Mechanical, electrical, plumbing22%
Cabinetry and millwork26%
Stone, tile and finishes20%
Appliances (allowance)8%
Supervision and overhead8%

The hood, solved on paper.

A professional-grade hood can depressurize a tight house, affecting the fireplace, water heater and front door. We raise it at design review, with your designer and mechanical contractor, not after the ceiling closes.

Under $120,000, call a specialist.

We don't take standalone kitchens below $120,000. A specialist will serve you better for less, and we'd rather say so than staff it thinly.

Email Matt about your kitchen See our paperwork

From our work · 5 photographs

Kitchens we have built.

Select a photograph to see it full size, with the rest of its project.

Questions

What owners ask first.

What does a kitchen remodel cost in Santa Barbara?
Ours run $120,000 to $450,000. The spread comes from whether the layout moves, whether the panel and gas service can carry the new appliances, and the cabinetry, more than the room's size.
How long will I be without a kitchen?
Ten to twenty weeks of construction, and we'll tell you which end before you commit. If it runs long, we set up a temporary kitchen: sink, refrigerator, induction plate.
Do I need a permit for a kitchen remodel?
Yes, if you move plumbing, gas or electrical, or touch structure. Same-footprint cosmetic work often doesn't. The assessment settles which.
Can you work with my kitchen designer?
Yes, and the kitchen is usually better for it. We price what they drew and tell them what won't build before plan check does. No designer yet? Matt works with a team of wonderful architects who will help you build your dream.

Built by Matt Newman. Licensed since 2001. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story

Inquiries

Send us the address. We'll tell you the truth about it.

Email it to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing

Updated November 2026