AMN Construction

Detached ADU with pool · Palo AltoPalo Alto.

Room for family, built from the ground up in Palo Alto: an accessory dwelling with a pool, custom throughout.

The back of a two-story house with vertical wood siding, a standing-seam metal hip roof and a wood trellis over a railed terrace, with stone steps down to a stone-paved pool deck and a rectangular pool
From the pool: a wood-clad upper floor, a trellis over the terrace

Next project · San Roque, Santa Barbara

San RoqueSee the project

Where it is

Palo Alto

About 250 miles north of downtown Santa Barbara. The pin marks the neighborhood, never the house.

Every project on the map

Built by Matt Newman. Licensed since 2001. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story

Inquiries

Something like this, on your parcel?

Email the address to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing