Home renovation · Mission area, Santa BarbaraMission.
The owners wanted calm and light, and room to host. The house's best feature, its vaulted ceilings and trusses, stayed.
A full remodel near the Old Mission: nine months of construction, finished in 2026. The owners wanted it calm and light, with room to host.
The vaulted, white-painted board ceilings and exposed trusses were the best thing in the house, and they stayed. Around them, everything changed, down to black-framed sliding doors to the garden.





The hardest part: keeping the character of the house, the ceilings and trusses above all, while everything around them changed.
What it is made of
| Element | Specified |
|---|---|
| Ceilings | The original vaulted board ceilings and trusses, kept |
| Vanity | Green quartzite |
| Floors | Wide-plank wood |
| Pantry | Butcher-block counter; sage-green cabinets |

Mission area, Santa Barbara
A short drive from downtown Santa Barbara. The pin marks the neighborhood, never the house.

Built by Matt Newman. Licensed since 2001. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Something like this, on your parcel?
Email the address to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing



