Home additions · Santa Barbara, Montecito & the South CoastHome additions. The old house decides first.
You want more room without losing the house you chose.
- Range
- $250K–$2M
- Construction
- 3–10 months
- Warranty
- Two years, workmanship
A bedroom, a bath, a second story. Every addition is a renovation of the house it joins.

An addition is mostly the house you have.
The new rooms are the easy part. The work is where they meet the old ones: a new footing beside an old foundation, new framing tied into old, a roof that has to shed water across the seam, and a house whose electrical service, plumbing and heating were sized for fewer rooms. That is why we price additions as renovations, from $250,000 to $2,000,000 for the whole project, and why the existing house moves the number more than the new square footage.
So before the price is fixed we open the walls where the drawings make assumptions: a few thousand dollars and two weeks in preconstruction, the cheapest money in the project. The usual findings are the same as in any older house here: electrical service too small for a modern load, drainage undersized or failing, structure altered without a permit. All findable in advance.
Up, or out.
A second story puts new weight on walls and a foundation that were not built for it. The engineer decides what they need, and it is often more than owners expect. It also usually means moving out for part of the job.
A ground-floor addition runs into setbacks, lot coverage and, near the coast, the Coastal Zone. It is often easier to live through, with phased work and agreed hours.
Which one a parcel allows, and what each will take, is the first thing the written reading of your address answers.
Under the same roof, or a separate unit?
If the new rooms are for a parent, a grown child or a tenant, an accessory dwelling may serve better, and ours run $250,000 to $550,000. We will tell you which fits the parcel and the family before design starts.
An addition changes the outside. So the boards see it.
Every addition needs a building permit. Because it changes the outside of the house, most also go to design review. Here is who looks at one in each town.
| Town | Who reviews an addition |
|---|---|
| Santa Barbara | City permits. The Single Family Design Board reviews single-family projects for size and design; in El Pueblo Viejo, the Historic Landmarks Commission. |
| Montecito | County permits. The Montecito Board of Architectural Review, in three steps: conceptual, preliminary, final. Montecito Fire’s site plan rules for access and water. |
| Hope Ranch | County permits, plus the Hope Ranch Park Homes Association’s written approval of any exterior change. Height: 25 feet in the Coastal Zone and Laguna Blanca Heights, 30 feet elsewhere. |
| Summerland | County permits and the County Board of Architectural Review, which reviews new or altered buildings. Most of Summerland is in the Coastal Zone. |
| Carpinteria | City permits, the Architectural Review Board, and a Coastal Development Permit, since the whole city is in the Coastal Zone. Near the shoreline, appealable to the Coastal Commission. |
| Goleta | The City of Goleta. We confirm what applies with the City for each address. |
Sources for every line: who permits your house, town by town, checked November 2026. Boards and rules change; we confirm them for your parcel.
San Roque: a bedroom, a bath and a new roof.
In San Roque, in the City of Santa Barbara, the owners asked for a kitchen and living room remodel and a new bedroom and bathroom addition, then a new roof and other work they added along the way. Eight months of construction, finished in 2026.
“I was involved only as much as I wanted to be on the things I wanted to do and left the rest to Matt and team.”
Sara Nickel, Google review, October 2026. Read it in full on the project page.
They moved back in two weeks after the finish date Matt gave them at contract signing; the delay came from the countertop vendor, at one of the last steps. See the project.
What owners ask first.
What does a home addition cost in Santa Barbara?
How long does an addition take to build?
Can we live in the house during an addition?
Does an addition need a permit?
Can my house take a second story?
Do you design the addition?
Built by Matt Newman. Licensed since 2001. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Send us the address. We'll tell you the truth about it.
Email it to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.