A garage becomes a home
A garage became a home, and I got to do the woodwork.
A Carpinteria garage taken down to the studs and rebuilt as a finished accessory dwelling. I installed the cabinets and did all the finish carpentry. The new plumbing was cut into the slab, then came a kitchen with white shaker cabinets, a bath and a bedroom under a vaulted ceiling. The before photos are from April 2026 and the finished rooms were photographed in August.
Idea for your house: Planning an ADU or a guest space? Start with storage. A good closet, a kitchenette and one built-in make a small space feel big.
Want something like this? Call me at 818 201 4348






