AMN Construction

Finish carpenter · Montecito, California

Finish carpentry in Montecito, built in our Carpinteria shop.

Montecito rooms are big, beautiful and often oddly shaped, so I make everything to fit. I have loved working at the Biltmore, Ennisbrook and Birnam Wood, and Nic and I are always happy to go back.

Quick version: Tom has been a finish carpenter for fifty years and works with his son Nic. Call him on 818 201 4348.

License 802739 (opens in a new tab)InsuredTwo-year written warranty5.0 on Google, 4 reviews (opens in a new tab)Six things to check before you call

Tom and his son, father and son finish carpenters
Estate houses · rooms made to order

Montecito

Montecito

Ennisbrook

Warm oak, clean lines and a pantry you will want to show off.

Oak cabinets all through this kitchen and walk-in pantry: a dark-stained island, a paneled refrigerator, floating shelves with lights underneath, and tall pantry doors that sit flush with the wall.

Idea for your house: Try making pantry doors sit flush with the wall so the whole run reads as one calm surface, then tuck lights under the shelves.

Want something like this? Call me at 818 201 4348
Ennisbrook, Montecito: The kitchen
Ennisbrook, Montecito: The island and upper cabinets
Ennisbrook, Montecito: The walk-in pantry
Montecito

Birnam Wood

Cabinets and doors all the way up to the ceiling, in a house with great bones.

A lot of woodwork in one house: tall painted shelving, white built-in drawers and cabinets, an oak vanity with inset panels, a light-oak kitchen with glass-front cabinets, a dark wood bar, floor-to-ceiling pantry doors and a laundry room fitted wall to wall, all set against herringbone floors and hand-hewn beams.

Idea for your house: Take your cabinets and pantry doors to the ceiling. You get more storage, there is no dust shelf on top, and the room feels taller.

Want something like this? Call me at 818 201 4348
Birnam Wood, Montecito: Built-in shelving
Birnam Wood, Montecito: Casework beside steel-and-glass doors
Birnam Wood, Montecito: Inset-panel oak vanity
Birnam Wood, Montecito: The kitchen
Birnam Wood, Montecito: Floor-to-ceiling pantry doors
Birnam Wood, Montecito: The laundry room
Birnam Wood, Montecito: White built-in drawers and cabinets in the hall
Birnam Wood, Montecito: Glass-front cabinets over the sink
Birnam Wood, Montecito: A walnut bar with glass-front cabinets
Montecito · 2026

An Ipe wrap for a spa

A spa that looks like it grew up in the garden.

An Ipe wrap for a stainless steel spa in a Montecito garden: vertical Ipe boards on every side and a mitered Ipe cap with a flush edge around the water. Ipe is one of the hardest, densest woods there is, which makes it a great choice around water and weather.

Idea for your house: Wood can dress up equipment too. Wrapped around a spa, a utility area or an outdoor shower, it makes the gear part of the landscape.

Want something like this? Call me at 818 201 4348
Mitered Ipe cap and vertical Ipe wrap around a stainless steel spa, with stone steps leading up to it
From the stone steps
Square Ipe-wrapped spa in a Montecito garden with the ocean beyond
Looking toward the ocean
Close view of the Ipe boards and mitered cap at the corner of the spa wrap
The mitered corner
The Ipe spa wrap with a level resting on top, set on stone pavers
Set on stone pavers

Finish carpentry in Montecito

Finish carpentry in Montecito, matched to the house.

Yes. From Italian Mediterranean and Spanish Colonial Revival estates to modern glass-and-concrete houses: cabinetry, paneling, beams, doors and trim matched to what is there.

The houses here

The old Mediterranean villas are symmetrical and formal, and carry more woodwork than most houses: paneled rooms, tall doors, crown and cased openings that must line up room to room.

Spanish Colonial Revival houses, like Casa del Herrero (1925), have plaster window returns with no casing, so the wood goes into dark stained doors, beams and cabinets. Stain hides little, so joints and grain must be right.

Modern houses, like Neutra's 1947 design here, want near-invisible carpentry: flat doors with even gaps, flush baseboard, no casing. With no molding to hide a gap, plain work is the least forgiving.

Who reviews what

Montecito is unincorporated: the County issues permits and the Montecito Board of Architectural Review judges exterior design, in any style. The south end is in the Coastal Zone. Exterior changes may need review; interior work generally does not. We check before ordering.

Building a house in Montecito: who reviews it, and in what order

What comes up in Montecito

  1. Custom cabinetryRooms in estate houses are often large or unusually proportioned, so cabinetry is usually made to the room and not picked from a catalog.
  2. Ceiling beams and coffered ceilingsSpanish Colonial Revival houses usually have exposed, dark stained beams, and new or repaired ones have to match the old in size and color.
  3. Wainscoting and wall panelingFormal Mediterranean houses often have paneled rooms, and new paneling has to line up with doors, windows and outlets.
  4. Fireplace mantels and surroundsLarger houses often have more than one fireplace, and a mantel has to suit the room and keep the clearances the inspector checks.
  5. Crown moldingFormal rooms with high ceilings usually call for crown molding, often built up from several pieces to reach the right scale.

Finish carpentry in Montecito: what owners ask

Do you do finish carpentry in Montecito?
Yes: cabinetry, paneling, beams, mantels, doors, windows, baseboard, casing and crown, built in our Carpinteria shop, from your designer's drawings or matched to the house.
Can you match the existing woodwork in an older Montecito house?
Usually. We measure the profile, match the species, and build it in our shop if no stock molding is close. New stain rarely matches old wood at first, so we judge samples in the room.
Does the Montecito Board of Architectural Review look at interior work?
Generally not. It reviews exterior design, so cabinets, paneling and interior doors usually skip it; windows and exterior doors may not. We confirm before ordering.

California license802739

  • Class B General Building, public at the state
  • General liability insured; certificates on request
  • Two-year written workmanship warranty
  • Built and fitted by Tom and Nic themselves
Six things to check before you call

Want the names before you call? The Montecito Standard shows every part of a door, a paneled wall and a stair as a model you can turn.

How a cabinet meets a wall

No wall is flat. Watch a scribe.

  1. Set it against the wall. The cabinet side is straight. The wall is not. The gap shows where.
  2. Scribe. A compass rides the wall and draws its exact shape onto the wood.
  3. Cut to the line. The waste comes off with a plane or a jigsaw, a little at a time.
  4. Close it. The cabinet slides home and the joint disappears. No filler strip, no caulk.

How it works

Four easy steps. Step one is a phone call.

  1. You call meTell me what you are dreaming up: a kitchen, a library, a staircase, one awkward corner. Rough ideas are welcome.
  2. We see the roomNic and I come measure, take a good look at how your house really sits, and talk through wood and finish with you.
  3. It is built in the shopWe build it in Carpinteria, where we can cut the joints clean and let the finish cure out of the dust.
  4. We fit it to your houseWe scribe it in so every gap closes and every door latches without a push.
Licensed

California Class B General Building contractor. Verify CSLB 802739 on the state's own site.

Insured, with a warranty

Licensed and insured, with a two-year workmanship warranty in writing.

Backed by a general contractor

I build the work, and Matt Newman, the principal of AMN Construction, stands behind it, just as he does for the houses. For a whole house, a renovation or an addition, call Tom on 818 201 4348.

Great experience. Hired their finish carpentry crew for cabinet installs, shelving, etc. Excellent work, knew their stuff, plan on using them for more projects on my home build.

★★★★★Brad Hodges · Google review, October 2025 · Read all four on Google (opens in a new tab)

Let's build something beautiful

Got a room in mind? Give me a call.

Call me and let's talk it over. Tell me about the room, and I will tell you honestly how I would build it. Nic and I would love to hear what you have in mind.

Already worked with Tom or Matt? Tell others how it went, on Google.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing