AMN Construction

Finish carpenter · Goleta, California

Finish carpentry in Goleta, built in our Carpinteria shop.

Goleta is mostly 1960s and 1970s houses on level lots, where new baseboard, interior doors, windows and kitchen cabinets change a house fast.

Quick version: Tom has been a finish carpenter for fifty years and works with his son Nic. Call him on 818 201 4348.

License 802739 (opens in a new tab)InsuredTwo-year written warranty5.0 on Google, 4 reviews (opens in a new tab)Six things to check before you call

Tom and his son, father and son finish carpenters
1960s and 70s houses · fresh trim and doors

Goleta

Finish carpentry in Goleta

Finish carpentry in Goleta, for 1960s and 70s houses.

Yes. Most Goleta houses are 1960s–70s on level lots, and the usual work is replacing original baseboard, doors, windows, kitchen cabinets and vanities.

The houses here

Houses of that era came with low plain baseboard, narrow casing and hollow-core doors, and much of it is still there. Taller baseboard, solid doors and casing with an even reveal make the rooms feel finished.

Many sit on slabs with single-pane glass. Slabs are rarely flat, so baseboard is scribed or gets a shoe molding. New windows change the opening inside too, so interior trim around them is redone at the same time.

Kitchens and baths of that era are due. The slab limits plumbing moves, so the gain comes from better cabinets: plywood boxes, full-extension drawers, soft-close hinges. A garage turned living space needs doors, trim and cabinets too.

Who reviews what

Inside city limits, Goleta has its own Design Review Board and permits; in the Coastal Zone the City approves in concept and the Coastal Commission issues the permit. Isla Vista and much of the eastern valley are County land. Interior work generally needs no review; we check before ordering.

Building in Goleta: who reviews a house, and in what order

What comes up in Goleta

  1. BaseboardsOriginal baseboard in houses of this era is usually low and plain, and it is often damaged by decades of flooring changes.
  2. Door installationLight hollow-core doors are usual in 1960s and 1970s houses, and solid replacements change how every room sounds and feels.
  3. Window installationSingle-pane glass is common in 1970s Goleta houses, so window replacement comes up often.
  4. Kitchen cabinet installationOriginal kitchens are usually worn out, and on a slab the new cabinets often go back on the same layout.
  5. Bathroom vanitiesBaths of this era are usually small, so a vanity made or chosen to the exact width uses the wall fully.

Finish carpentry in Goleta: what owners ask

Is my Goleta address in the City or the County?
It depends on the parcel, not the mailing address: Isla Vista and much of the eastern valley have Goleta addresses but are County land. We check before ordering.
Can you replace hollow-core doors with solid ones in a 1970s house?
Yes. If the frames are straight and sound, we hang solid doors in them and check the hinges for the extra weight. If not, a prehung door is usually better.
Can you install baseboard on a concrete slab floor?
Yes. Baseboard nails to the wall, not the floor; we scribe it to the slab or add shoe molding, and install it after any new flooring.

California license802739

  • Class B General Building, public at the state
  • General liability insured; certificates on request
  • Two-year written workmanship warranty
  • Built and fitted by Tom and Nic themselves
Six things to check before you call

Want the names before you call? The Montecito Standard shows every part of a door, a paneled wall and a stair as a model you can turn.

How a cabinet meets a wall

No wall is flat. Watch a scribe.

  1. Set it against the wall. The cabinet side is straight. The wall is not. The gap shows where.
  2. Scribe. A compass rides the wall and draws its exact shape onto the wood.
  3. Cut to the line. The waste comes off with a plane or a jigsaw, a little at a time.
  4. Close it. The cabinet slides home and the joint disappears. No filler strip, no caulk.

How it works

Four easy steps. Step one is a phone call.

  1. You call meTell me what you are dreaming up: a kitchen, a library, a staircase, one awkward corner. Rough ideas are welcome.
  2. We see the roomNic and I come measure, take a good look at how your house really sits, and talk through wood and finish with you.
  3. It is built in the shopWe build it in Carpinteria, where we can cut the joints clean and let the finish cure out of the dust.
  4. We fit it to your houseWe scribe it in so every gap closes and every door latches without a push.
Licensed

California Class B General Building contractor. Verify CSLB 802739 on the state's own site.

Insured, with a warranty

Licensed and insured, with a two-year workmanship warranty in writing.

Backed by a general contractor

I build the work, and Matt Newman, the principal of AMN Construction, stands behind it, just as he does for the houses. For a whole house, a renovation or an addition, call Tom on 818 201 4348.

Great experience. Hired their finish carpentry crew for cabinet installs, shelving, etc. Excellent work, knew their stuff, plan on using them for more projects on my home build.

★★★★★Brad Hodges · Google review, October 2025 · Read all four on Google (opens in a new tab)

Let's build something beautiful

Got a room in mind? Give me a call.

Call me and let's talk it over. Tell me about the room, and I will tell you honestly how I would build it. Nic and I would love to hear what you have in mind.

Already worked with Tom or Matt? Tell others how it went, on Google.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing