Wainscoting and wall paneling, laid out to fit.
Wainscoting is wood paneling on the lower part of a wall, and wall paneling covers more of it. We lay out, build and install both, so every panel lands evenly around the outlets, windows and doors in the room.
- Layout comes first. Panels are spaced to suit the wall before a single board is cut.
- Height is a proportion of the wall, not a fixed number. Half the wall usually looks wrong.
- Walls are not flat. Paneling is shimmed and scribed so it sits straight and tight.
- WainscotingPaneling on the lower wall. Panels are laid out to land evenly between doors and windows.
- Chair railCaps the paneling. Its height is a proportion of the wall, not a fixed number.
- BaseboardFollows the floor. Inside corners are coped so they stay closed as the house moves.
How a coped corner is cut, frame by frame.
- Run the first piece inThe first length is cut square and pushed tight into the corner.
- Miter the second pieceThe second length gets a 45° cut. The cut edge shows the outline of the molding.
- Cope to the lineA coping saw follows that outline, back-cutting slightly, so only the face of the molding remains.
- Fit the jointThe coped end overlaps the face of the first piece. Wood shrinks in dry weather. A miter opens; a cope stays closed.
Built by Tom. Fifty years of custom cabinets and finish carpentry, from Oregon and Hawaii to Malibu, Pacific Palisades and Westlake Village, and now from Goleta to Carpinteria. Meet the carpenter
What is included.
- Board and batten: flat boards with narrow vertical strips over the joints.
- Beadboard, shiplap and tongue-and-groove: boards that lock or overlap edge to edge.
- Raised panel and flat panel wainscoting, built as frames with panels set inside.
- Picture-frame molding: thin molding applied to the wall in rectangles, then painted with it.
- Chair rail and cap molding along the top edge, and baseboard along the bottom.
- Outlet and switch boxes brought forward to sit flush with the new surface, with the electrician.
You send photographs of the walls and rough measurements, and we talk through style and height.
We measure on site and mark the layout on the wall, working around outlets, windows and doors.
Panels and frames are cut, and the more involved pieces are built in our small boutique shop in Carpinteria.
Material adjusts to the air of the house, then is installed, shimmed flat and scribed to floor and corners.
Nail holes are filled and joints caulked, and the painter follows.
Decide these first.
- Style. Board and batten and shiplap read casual. Raised panels read formal. It should suit the age of the house.
- Height. About a third of the wall or about two thirds both sit well. We can tape a line on your wall so you can judge.
- Panel width. Equal panels on each wall look planned, which means the width shifts a little from wall to wall.
- Material. MDF paints smoothly and stays flat. Solid wood or plywood suits stain and rooms that see moisture, such as baths.
- What happens at windows and doors. The paneling meets the casing, so the two are chosen together.
- Panels of equal width across a wall, with no thin sliver left over at a corner.
- Outlets and switches that sit inside a panel or a board, not half across a batten.
- A top rail that is level and meets window and door casing cleanly.
- Joints that are tight and flush to the touch, with no ridges showing through the paint.
- Paneling that sits flat to the wall, with no hollow sound or movement when pressed.
- Wall area, and how many windows, doors, outlets and corners interrupt it.
- Style: applied molding and board and batten cost least, framed raised panels the most.
- Material and finish: painted MDF costs less than stained solid wood.
- The walls. Wavy plaster or out-of-plumb corners take more shimming and scribing.
Prices vary with the materials and the hours a job takes. Each job is custom and unique, so we price it once we have seen the room.
The same work, inside whole houses.

Paneled walls from photographed jobs, photographed.
Wood-paneled walls, a cedar-lined closet and built-ins from photographed jobs.




Wainscoting and wall paneling: what owners ask.
How high should wainscoting be?
What is the difference between wainscoting and board and batten?
Is shiplap or tongue-and-groove better for walls?
Can wainscoting be installed in a bathroom in Santa Barbara?
Built in our small boutique shop in Carpinteria where the piece is custom, and fitted on site in:
Wainscoting and paneling in CarpinteriaWainscoting and paneling in SummerlandWainscoting and paneling in MontecitoWainscoting and paneling in Santa BarbaraWainscoting and paneling in Hope RanchWainscoting and paneling in Goleta
- Custom cabinetry
- Baseboards
- Door and window casing
- Window installation
- Door installation
- Custom shelving
- Hardware installation
- Crown molding
- Wainscoting and wall paneling
- Built-ins
- Custom closets
- Stair railings and treads
- Fireplace mantels and surrounds
- Ceiling beams and coffered ceilings
- Kitchen cabinet installation
- Bathroom vanities
- Custom furniture and pieces
- Trim and door repair
- Exterior trim
California license802739
- Class B General Building, public at the state
- General liability insured; certificates on request
- Two-year written workmanship warranty
- Built and fitted by Tom and Nic themselves
Have a room in mind? Send us the photographs.
Email photographs of the room and rough measurements to purchasing@amnbuild.com. Matt reads it himself, or use the three-step form.
Already worked with Tom or Matt? Tell others how it went, on Google.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated October 2026