Kitchen cabinet installation, level and plumb.
You bought the cabinets. We install them: level, plumb, fastened to the wall framing, with fillers cut to fit your walls and the trim on. When we finish, the kitchen is ready for the countertop template.
- Floors are not level. The run starts from the floor’s high point, and every other cabinet is shimmed up to it.
- Cabinets hang from studs or blocking, not from drywall.
- Check the delivery against the order before installation starts. A missing box stops the job.
- Toe kickThe recess at the floor. Cabinets are leveled from the floor’s highest point.
- Scribed fillerA strip cut to the exact shape of the wall, so no gap shows where cabinet meets plaster.
- Cabinet crownCloses the cabinets to the ceiling, which is rarely level.
- Countertop lineMeasured only after the cabinets are fixed in place.
How a cabinet is built, frame by frame.
- Cut the partsSides, bottom, top and back are cut from one sheet of cabinet-grade plywood, so the grain and color match.
- Assemble the boxThe parts are glued and screwed into a box, then checked corner to corner so it is square.
- Face frame or edgeSolid wood is fixed to the front edges. It is what the eye reads, and where the doors will hang.
- Doors and drawersDoors and drawer fronts are made and hung with an even gap all round, the same width everywhere.
- Finish in the shopPaint or stain goes on in the shop, sanded between coats, and cures before the piece leaves.
- Level, fasten, scribeOn site the cabinet is leveled from the floor’s high point, fastened to the wall, and a filler is cut to the wall’s real shape.
Built by Tom. Fifty years of custom cabinets and finish carpentry, from Oregon and Hawaii to Malibu, Pacific Palisades and Westlake Village, and now from Goleta to Carpinteria. Meet the carpenter
What is included.
- Installing stock, semi-custom or flat-pack cabinets you bought elsewhere. Flat-pack cabinets arrive as panels and are assembled on site.
- Finding the high point of the floor and marking a level line around the room.
- Fastening wall and base cabinets to studs, or to blocking added inside the wall.
- Fillers (narrow strips that close the gap at a wall) scribed to the wall’s real shape.
- Crown, light rail (the strip that hides under-cabinet lighting) and toe kick.
- Doors and drawers adjusted, handles fitted, and the run left ready for the countertop template.
You send the cabinet order or layout drawing and photographs of the room.
We check the room against the layout: walls, floor, windows, appliance positions, and where the studs are.
Wall cabinets usually go up first, then base cabinets from the floor’s high point, shimmed, joined to each other and fastened.
Fillers, panels, crown, light rail and toe kick are cut and fitted, then doors, drawers and hardware are adjusted.
The countertop fabricator makes the template, and we return for anything that had to wait for the countertop.
Decide these first.
- Who checks the order. Count the boxes and open them when they arrive. Damage found halfway through installation costs time.
- What happens to the old kitchen. Removal, wall repair and any plumbing or electrical changes come before the cabinets.
- Flooring first or cabinets first. It depends on the floor. A floating floor usually goes in after, so it can still move.
- Crown to the ceiling or a gap above. Ceilings are not level either, so crown that touches the ceiling has to be scribed.
- Handle positions. Holes in a finished door cannot be moved, so we mark them and you approve before we drill.
- A level laid on the base cabinets reads true along the whole run, front to back and end to end.
- Cabinet faces are flush with their neighbors. You cannot feel a step with a fingertip.
- Gaps between doors are even, and doors line up top and bottom.
- Fillers follow the wall, with no gap packed with caulk.
- Drawers close without rubbing, and nothing shifts when you lean on a cabinet.
- The number of cabinets, and whether they arrive assembled or flat.
- The room. Floors and walls far out of level and plumb mean more shimming and scribing.
- Trim. Crown, light rail, end panels, appliance panels and tall pantry units add fitting time.
- Wall work, such as adding blocking or repairing what removal of the old kitchen left behind.
Prices vary with the materials and the hours a job takes. Each job is custom and unique, so we price it once we have seen the room.
Kitchen cabinet installation: what owners ask.
Will a contractor install cabinets I bought myself?
Do kitchen cabinets go in before or after the flooring?
Why do cabinets need to be level if my floor is not?
How are wall cabinets attached in a Goleta or Santa Barbara house?
Built in our small boutique shop in Carpinteria where the piece is custom, and fitted on site in:
CarpinteriaSummerlandMontecitoSanta BarbaraHope RanchGoleta
- Custom cabinetry
- Baseboards
- Door and window casing
- Window installation
- Door installation
- Custom shelving
- Hardware installation
- Crown molding
- Wainscoting and wall paneling
- Built-ins
- Custom closets
- Stair railings and treads
- Fireplace mantels and surrounds
- Ceiling beams and coffered ceilings
- Kitchen cabinet installation
- Bathroom vanities
- Custom furniture and pieces
- Trim and door repair
- Exterior trim
Have a room in mind? Send us the photographs.
Email photographs of the room and rough measurements to purchasing@amnbuild.com. Matt reads it himself. No forms.


