Build the house once on screen. Then build it once for real.

Before anyone digs, we build your whole house as a 3D model from the full plan set: every footing, stud, pipe, wire and light. We check it against every sheet, and every problem it finds goes back to your architect as a question, with a date it is needed by. It gets settled on paper, where it costs an email, not on site, where it costs a crew.

Build it first

The short answer: we build your house as a 3D model from the full plan set and check it against every sheet before anyone digs. Conflicts, failed clearances and missing details become dated questions for your architect, so they are settled on paper instead of on site.

Send your plans to Matt

3D model of the Canon Drive ADU: three gables in spruce and slate-gray flat clay tile, a steel canopy over the south patio
The Canon Drive ADU, built from its full 35-sheet set. Turn it and watch it go up in 14 steps.
  • 35sheets read, every one
  • 7/16 inmodel to dimension plan
  • 49questions raised before a price
  • 6would have blocked a firm price

Why houses go over

Most budget and schedule trouble on a custom house is not bad luck. It starts as a gap in the drawings. Two sheets disagree. A window is drawn where the engineer needs a solid wall. A toilet is drawn two inches too close to a wall. Nobody notices until a framer, a plumber or an inspector is standing there.

When that happens on site, the crew stops or guesses. Then comes the rework, the change order, a trade that comes back for a second visit, and the trades waiting behind it. That is the "inefficient trade flow" owners feel but rarely see on paper.

The research on this is broad, not residential-specific, but it all points the same way:

On a $3 million house, 5 percent is $150,000. That is an illustration, not a forecast for your house. Our point is simpler: most of these errors are already in the drawings before work starts, so that is where we look for them.

What we build before we build

We take the full permit set: every architectural, structural and energy sheet, and the survey. From it we build the house in 3D, piece by piece, in the order the crew will build it. The model is then checked against the sheets ten ways:

  • the grid against the dimension plan;
  • every opening against the door and window schedule;
  • every light, outlet and alarm against the power plan;
  • beams, footings and hold-downs against the structural sheets;
  • floor levels against the sections;
  • clearances against the building and plumbing codes;
  • a sweep of every option the owner might choose, for collisions.

When two sheets disagree, or the drawing leaves something open, it becomes a question. It is never a quiet guess.

What it found on a real house

The Canon Drive ADU in the Santa Barbara foothills is 710 square feet: three gables, three floor levels and a steel canopy. Its full set is 35 sheets. We read all 35 and built the model from them.

  • Fit: the model's grid sits within 7/16 inch of the dimension plan. All 11 outside openings match the drawn walls to about an inch. All 37 lights and all 3 alarms sit where the power plan puts them.
  • Questions: 49 raised before a price. The sheets answer 10. Of the 39 still open, 6 block a firm price, 12 are carried as allowances and 21 are questions to confirm.
  • A shear wall through a window: the engineer's 14'-9" shear wall on grid 04 runs through the new hall window. That is found before framing, not by an inspector.
  • A door that does not fit: the schedule calls for a 9'-7" door in an opening drawn 9'-4 1/2".
  • Sheets that disagree: 15-mil vapor retarder on one sheet and 6-mil on another. Three, four or six canopy columns, depending on which sheet you read.
  • Clearances: a powder room toilet with 2'-3" clear in front, so a compact or wall-hung bowl. A stair to a door with no landing at the top.

Each of these would have been found eventually. The question is whether it is found by a framer with a nail gun or by a question on a Tuesday afternoon. You can turn the same model yourself on our ADU page and watch it go up in its 14 build steps.

What you have before ground breaks

  • The checked model. You can turn it, cut it open and walk it step by step, on any phone or computer.
  • The open-questions list. Each question is sorted into "blocks a firm price", "priced as an allowance" or "confirm". Each names who answers it and the date it is needed by.
  • A bid form for every trade. Quantities come from the model, with the work in order, the steps the trade works in and how many separate visits to price. On the ADU, the plumber has five.
  • The build sequence. Every step shows which trades are on site and what must be finished before the next one starts, so trades are not stacked on top of each other.
  • Owner decisions with deadlines. Each choice, from tile to the toilet, says "decide before step N" and why.
  • An inspection schedule. It says what must be ready and whether work stops.
  • A rainy-season check. Grading that would land between November 1 and April 15 is flagged and priced for erosion control.

A typical bid, and a house built first

A typical bid compared with a house built first
WhatA typical bidBuilt first
What the price is based onThe floor plan and an allowance for the restEvery sheet, read and checked against a 3D model
Conflicts between drawingsFound on site, by a tradeFound on paper, sent to the architect as questions
Trade quantitiesEach trade estimates its ownMeasured from the model, step by step
Owner decisionsAsked when the crew needs themListed in build order, each with a deadline
Trade sequenceSet week to weekPlanned before ground breaks, with each trade's visits
What you can seeDrawings and maybe a renderingThe whole house, cut open, at every step

What happens after you send your plans

  1. We read every sheet. Architectural, structural, energy, survey and civil. Nothing is skipped because it looks routine.
  2. We build the house in 3D, step by step in the order the crew will build it, from the dimensions on your drawings.
  3. We check the model against the sheets and the codes, and sweep every option you might choose.
  4. Your architect gets the questions, each with the sheet, the code section, who answers it and the date it is needed by.
  5. The trades price the model's quantities, step by step, with the visits they will make, so bids can be compared line for line.
  6. The price is fixed at Phase 05, against drawings that have been checked, with dated decisions for everything still to choose.

Where it fits in how we work

The model is built during design and preconstruction (phases 02 to 05 of our seven phases). It is what lets us give one fixed contract sum at Phase 05, once the trades have priced the permitted set. We will not fix a price against drawings no one can build from. The model is how we find out whether the drawings can be built from.

For your architect, nothing changes in who designs the house. Every finding goes back as a question, with the sheet and the code section, never as a redesign. How we work with architects.

What it is not

  • It is not a rendering. A rendering shows what a house looks like. This shows how it goes together, and where it does not.
  • It is not design. Your architect and engineer design and size the house. We build their drawing, check it and ask.
  • It is no better than the sheets. Where a drawing gives no dimension, the model says so, and that becomes a question.
  • It is not a guarantee of no changes. Owners change their minds, and walls hide things. What it removes is the avoidable kind: the problem that was already on paper.

Words on this page

Permit set
The full drawings the City or County approves. What the trades price.
Shear wall
A wall built and nailed to resist wind and earthquakes. Windows cannot be cut into it unless the engineer details it.
Hold-down
A steel connector that ties the end of a shear wall to the foundation.
Vapor retarder
A plastic sheet under the slab that keeps ground moisture out of the house.
Rough-in
Pipes, wires and ducts run inside the walls before they are closed.
Allowance
A sum carried in the price for something not yet chosen, with what it buys and a date to decide.
Change order
A written change to the price or the work, approved before the work is done.

Check us before you call

Questions owners ask

Do my plans have to be finished?

A permit set is best, because that is what the trades price. We can start from a design-development set and mark everything that is still assumed, so you can see what the next round of drawings needs to settle.

Can I see an example?

Yes. The Canon Drive ADU is on our ADU page, and every course in our free Trade School ends on the same model.

Is it only for new houses?

No. For a remodel we model the existing house from measurements and the as-built drawings we can find. We open walls on purpose during preconstruction, so what is behind them is priced, not discovered.

Who answers the questions it raises?

Whoever owns the drawing: the architect, the engineer, the energy consultant or you. The list names each one.

Sources: FMI and PlanGrid, Construction Disconnected (2018); Hwang, Thomas, Haas and Caldas, "Measuring the Impact of Rework on Construction Cost Performance", Journal of Construction Engineering and Management 135(3), 2009; Get It Right Initiative, Strategy for Change. The figures are from industry-wide studies, mostly of commercial building, and are given for scale, not as a forecast for any house. The Canon Drive figures are from our own model of that project.

Related: the Canon Drive ADU, in 3D, our seven phases, allowances and change orders, in writing and how to avoid change orders.

Ask Matt about your project More writing

The model, live

Walk the problems yourself.

Seven stops on the real model. Each one is something the drawings left open, settled on paper.

The 3D tour needs WebGL, which this browser has turned off. Every stop is described on the left.

What the model found

The full set, built in 3D

All 35 sheets of the Canon Drive ADU, built piece by piece in the 14 steps the crew will follow. Use the arrows to walk the problems the model found.

A shear wall through a window

The engineer marks a 14'-9" shear wall on the hall's south wall. Submittal 3 adds window 104-A in the same stretch. A shear wall cannot have a window cut through it unless the engineer details it, so it goes back as a question before framing.

A door wider than its opening

The schedule calls for the living room slider at 9'-7". The opening on the floor plan measures 9'-4 1/2". One of them is wrong, and the header is cut to whichever wins.

Two sheets, two vapor retarders

Under the slabs, the structural sheets call for a 15-mil vapor retarder and the architectural sheets for 6-mil. Cheap to settle now, expensive under poured concrete.

A toilet with 2'-3" in front

The powder room leaves 2'-3" clear in front of a standard bowl. The red patch is the clear space the plumbing code asks for. A compact or wall-hung bowl fixes it, if it is chosen before rough-in.

A stair with no landing

The stair to door 106-3 rises straight to the threshold. A door at the top of a stair needs a landing, so the steps and the patio move.

How many columns?

Depending on the sheet, the steel canopy stands on three, four or six columns. The steel is ordered once, so the count is settled first.

Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story

Inquiries

Send us your plans. We will tell you what is in them.

Email the set, or a link to it, to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing

Updated November 2026