Cabinetry and millwork. Furniture that is built into the house.

A cabinet is a box, a door and a drawer, and the difference between a good one and a great one is in the joints, the material and the fit. Tom and Nic build cabinetry in our shop in Carpinteria; this course shows how, from sheet goods and joinery to finishes, and a century of South Coast kitchens.

7 chapters36 3D scenes10 min readSanta Barbara South CoastChecked 19 Nov 2026

The 3D scenes need WebGL, which this browser has turned off. Every word of the course is still here on the left.

Chapter 1 of 7

Inside a base cabinet.

Every cabinet is a box with a face, set on a base and fitted to the wall.

Box, base, face

A base cabinet is a plywood box on a leveled base, with a face frame or edge-banded front, doors, drawers and hardware. Uppers are boxes hung on the wall, screwed into studs.

The box

Quality boxes are 3/4-inch plywood or high-grade panel, glued and fastened at dadoes and rabbets, with a solid back that squares the box and gives something to screw through.

Drawers

Drawers are where cabinets wear. Dovetailed solid-wood or Baltic birch boxes on full-extension, soft-close slides outlast stapled particleboard by decades.

Chapter 2 of 7

Face frames, frameless, and doors.

Two construction systems and a handful of door styles cover most cabinetry.

Face frame or frameless

Face-frame cabinets have a solid-wood frame on the front, the American tradition. Frameless cabinets, the European 32-millimeter system, have no frame and hidden hinges, for full access and a modern look.

Door styles

Shaker has a flat panel in a square frame; slab is one flat piece; raised panel is traditional. Inset doors sit flush inside the frame and demand the most precise work.

WhyAn inset door shows any gap. It is a test of the cabinetmaker and of the house staying stable.

Sheet goods

Plywood, MDF and particleboard each have a place: plywood for boxes and strength, MDF for painted panels that stay flat, solid wood for frames and edges.

Chapter 3 of 7

From a sheet to an installed kitchen.

A custom cabinet job runs from drawings through the shop to the wall.

Seven steps

Site measure and shop drawings, cutting parts, edge banding and boring for hinges and shelves, assembly, finishing, delivery and installation.

Measure twice, after framing

We measure the real rooms after framing and drywall, because walls are never perfectly straight or plumb, and the drawings are approved before anything is cut.

Santa Barbara: Tom and Nic build pieces in our small boutique shop in Carpinteria and fit them on site from Goleta to Carpinteria.

Finish in the shop

Shop finishing in a spray booth gives a harder, smoother finish than brushing on site, and keeps fumes out of the house.

Chapter 4 of 7

Installed right: level, plumb, scribed.

Installation is where custom cabinets look custom, or don’t.

Level from the high point

A level line is set from the highest point of the floor, and bases are shimmed up to it so every countertop sits flat.

Scribe to the house

Where a cabinet meets an uneven wall or ceiling, a scribe strip is cut to its exact contour so there is no gap and no caulk line.

Fasten to framing

Cabinets are screwed through their back rails into studs, and to each other, so they hold heavy stone and full shelves for decades.

Chapter 5 of 7

A century of South Coast kitchens.

The kitchen went from a workroom to the center of the house.

1920s: built-in and painted

Kitchens had painted built-in cabinets, glass-front uppers and a pantry, all made by local carpenters.

1950s: factory cabinets

Mass-produced cabinets and birch and maple faces came with the post-war tracts.

1970s: dark wood

Dark-stained oak and pine raised-panel doors.

1990s: frameless and maple

European frameless systems and light maple spread; formaldehyde rules for composite panels came later.

Today

Inset and frameless both, painted and walnut, soft-close hardware, low-formaldehyde panels, and custom work by local shops again.

Chapter 6 of 7

The same trade, on a real ADU.

Every course ends on one building: a 710-square-foot ADU on Canon Drive in the Santa Barbara foothills, modelled from its permit set before pricing. Three gables, three floor levels, a steel canopy, and a list of questions the drawings left open. Here is a small kitchen and the built-ins, cabinet by cabinet.

Two runs, two depths

An L-shaped kitchen: the north run with the sink and dishwasher, the west run with the refrigerator space and the cooking appliance. We built a cabinet table from the plans, with a cut list and an assembly order for every box.

The bedroom built-in

Built-in 12.20 sits in the alcove north of the water-heater closet, about 23 by 28 inches. An earlier model put it on the wrong wall; the plan shows its face to the west, and we corrected it.

Primary closets

Two closets line the primary suite's west wall, with rods, shelves and doors from the same cabinet table. Owner choices, like flush, sliding or mirrored doors, change the order, not the opening.

Chapter 7 of 7

What it means for your kitchen.

Cabinets set the schedule of a kitchen remodel.

Lead time

Custom cabinets take weeks to draw, build and finish. Ordering them is often the first big commitment of a kitchen schedule.

Hinges and slides

Most cabinet doors hang on concealed cup hinges that adjust up and down, side to side and in and out, so a row of doors can be tuned to even gaps. Drawers run on full-extension, soft-close slides screwed to the cabinet sides. Inset doors on traditional cabinets may use exposed butt hinges instead.

WhyUneven door gaps after a few months are usually just hinge adjustment. A screwdriver fixes them; it is part of the follow-up visit.

Appliances that disappear

Many high-end kitchens hide the refrigerator and dishwasher behind cabinet panels, so the room reads as furniture and only the range shows as metal. Panel-ready appliances have exact sizes and hinge details, so the model numbers are fixed before the cabinets are drawn.

WhySwapping a panel-ready appliance after the cabinets are built usually means remaking the panels and sometimes the boxes.

Laying out a kitchen

A kitchen works when the sink, the cooktop and the refrigerator are close but not in each other's way, the dishwasher sits beside the sink, every appliance has counter space to land things beside it, and the aisles are about 42 inches wide, 48 where two people cook.

WhyAisles and landing space are set by the cabinet layout, long before the finishes are chosen. They are hard to fix once cabinets are ordered.

Old built-ins

Original built-ins in older houses can often be restored or copied, keeping the character of the room.

Beyond the kitchen

Vanities, closets, bookcases and window seats are cabinetry too, and often fit into a remodel that is already happening.

Closets

A built-in closet is laid out by what it holds: double hang for shirts, long hang for dresses and coats, shelves and drawers, and shoes. Panels are about 24 inches deep where clothes hang, rods and shelves are set by the owner's height, everything fastens to cleats screwed into the studs, and lighting is wired in before drywall.

WhyBlocking in the walls at framing lets heavy shelves and rods go anywhere later. It costs almost nothing when the walls are open.

Inset cabinets

In inset cabinetry the doors and drawers sit inside the face frame, flush with it, with a thin even gap all around, often about an eighth of an inch. It is the look of old built-ins and fine furniture, and the least forgiving: a frame out of square or a door that moves with the seasons shows as an uneven line. The shop builds and finishes in a controlled room, and the installer sets the boxes dead plumb so the reveals stay even.

WhyInset needs wood that has acclimated, a level floor and an installer who has done it. Budget time for adjusting every door.

Finishes sprayed in the shop

A smooth painted or clear cabinet finish is sprayed in a booth: filtered air, steady temperature, and coats of catalyzed lacquer or conversion varnish that cure hard. Doors are finished flat, edges first, so nothing sags. Color and sheen are approved on a sample board made from the same wood and finish before production, and the signed sample is the standard the job is checked against.

WhyA site-painted cabinet never matches a shop finish. Plan touch-up kits for the few marks installation makes.

Wine racking

Cellar racks are made of woods that stay stable and do not smell in a cold, damp room: redwood and mahogany are traditional. Bottles lie on their side so the cork stays wet. The rack layout counts bottles, leaves room for large formats and cases, and is fitted after the room is insulated and sealed, fastened so it never pierces the vapor barrier without sealing it.

WhyAsk how many bottles and what sizes before the room is framed. Racks decide the room's dimensions, not the other way round.

Curved cabinet ends

A rounded island end is built in the shop as its own drum: a flat plywood spine, half-round formers cut from one template, and a skin of two layers of bending plywood laminated with a rigid glue, then veneered. The formers are cut smaller than the finished radius by the thickness of the skin and veneer, measured with calipers rather than taken from the nominal size. The skin gets about 3.14 inches longer for every inch of radius, and a concave gauge at the finished radius checks it at the top, middle and bottom before veneering.

WhyThe curve is only as true as the formers and the radius maths. Every bump shows through veneer, so the skin is faired dead smooth first.

Cutting diagrams

Before a sheet is cut, every cabinet part for the job is laid out on 4 x 8 sheets the way a table saw or track saw can actually cut them: full-length rips first, then crosscuts. Parts from different rooms are nested together, so a vanity can come out of the kitchen's offcuts, grain direction is set where it shows, and the largest offcut is noted for small parts. The diagram also gives the true sheet count for ordering.

WhyA cut list without a diagram usually orders one sheet short or two sheets long, and puts the grain the wrong way on a door.

Hardware, drilled once

Pulls and knobs are the part of the kitchen everyone touches and the part where a mistake cannot be hidden: a wrong hole in a painted door means a new door. Installers agree the layout with the owner first, centered on rails or a set distance from an edge, then make or set a drilling jig and use it for every door and drawer of that size, drilling from the face with a backer behind to prevent blowout, after a test in scrap.

WhyTwo holes in the wrong place cost a door and three weeks. Mock up one door with the owner before drilling the rest.

Hanging the uppers

Upper cabinets are hung before the bases on many jobs, so the installer can stand close to the wall. A straight ledger board is screwed level along the line of the uppers' bottoms; each cabinet rests on it while it is shimmed plumb, clamped to its neighbor and screwed through the hanging rail into studs or blocking. The ledger comes off when the run is done. A cabinet jack does the same job where there is no wall to screw a ledger to.

WhyUpper cabinets full of dishes are a serious load. Screw into framing or blocking, never only into drywall.

Under-cabinet lighting

Light under upper cabinets is planned with the cabinets, not added later. The cabinet maker builds a light rail, a small lip under the front edge, to hide the fixture; the electrician brings the wire and decides where the driver for low-voltage LED goes; and the strip is set toward the front of the cabinet so it lights the counter and the backsplash instead of glaring off a polished stone. It is decided before drywall, because the wire comes out of the wall at a precise spot.

WhyRetrofitting under-cabinet lights means surface wires or opening a finished backsplash. Plan the wire and the rail together.

Tall cabinets stay put

A tall pantry, wardrobe or bookcase filled with heavy things can tip forward, especially in an earthquake or when a child climbs it. Built-in tall units are screwed through their hanging rails into studs or blocking, and freestanding furniture-style pieces get a wall anchor. The blocking is decided before drywall, at the heights the cabinet drawings show.

WhyAsk the cabinet shop where the hanging rails are, and block for them at framing.

After the film

Use it on a real house.

On your house

Cabinetry is the heart of what we do. Tom and Nic build in our Carpinteria shop and fit every piece on site.

For our crew

The AMN crew trains on the full private set for this trade: a 3D job site you walk station by station, the lesson plan, the field guide, the math and the tools. Sign-in is not needed, but these pages are kept out of search.

Trades in this course

  • Cabinetmaking · C-6
  • Cabinet installation · C-6
  • Architectural millwork · C-6
  • Closet systems · C-6

All 100 trades

Before you hire

In California, a license is needed for any job of $1,000 or more in labor and materials, any job that needs a permit, or any job where the worker hires help. Look up the contractor’s license number at cslb.ca.gov and check it is active and carries the right class:

  • Cabinetmaking: CSLB class C-6

On the job: the install checklist.

The install chapter as a list to walk before you call the work done. Ticks stay in this browser only. Prints on one page.

Cabinetry and millwork · Job: ________________ · Date: __________ · Checked by: ________________

Check yourself. Out loud.

The same drill our crew uses: give the answer in two sentences before you open each one. If you can only name the thing, read that chapter again.

01 Door stylesSay why it matters, then open

An inset door shows any gap. It is a test of the cabinetmaker and of the house staying stable.

From chapter: Construction and doors

02 Appliances that disappearSay why it matters, then open

Swapping a panel-ready appliance after the cabinets are built usually means remaking the panels and sometimes the boxes.

From chapter: Your house

03 ClosetsSay why it matters, then open

Blocking in the walls at framing lets heavy shelves and rods go anywhere later. It costs almost nothing when the walls are open.

From chapter: Your house

04 Wine rackingSay why it matters, then open

Ask how many bottles and what sizes before the room is framed. Racks decide the room's dimensions, not the other way round.

From chapter: Your house

05 Cutting diagramsSay why it matters, then open

A cut list without a diagram usually orders one sheet short or two sheets long, and puts the grain the wrong way on a door.

From chapter: Your house

06 Hanging the uppersSay why it matters, then open

Upper cabinets full of dishes are a serious load. Screw into framing or blocking, never only into drywall.

From chapter: Your house

Words in this course.

17 terms in plain English, with the Spanish our crew uses. All 249 words across the school are on one page.

Bending plywood Triplay flexible
Plywood made to bend around a curve.
Conversion varnish Barniz de conversión
A very hard sprayed clear coat, common on high-end kitchen cabinets.
Face frame Marco frontal
The wood frame on the front of a cabinet box.
Former Costilla, molde
A shaped rib that a curved panel is built over.
Frameless cabinet Gabinete sin marco
A cabinet with no front frame; the doors cover the box edges. The European style.
Grain Veta
The lines and direction of the fibers in wood.
Inset Frente enrasado
A door or drawer front set inside the face frame, flush with it.
Inset door Puerta embutida
A cabinet door that sits flush inside its frame, with a thin even gap all round.
Lacquer Laca
A sprayed clear coat for wood. Catalyzed kinds have a hardener added and are tougher.
MDF MDF
A smooth sheet made of fine wood fiber and glue. It takes paint well.
Raised panel Tablero realzado
A panel with a sloped edge around a flat middle.
Reveal Reveal
A small, deliberate step or gap between two surfaces. Also the depth of wall you see at a window.
Scribe Trazo a compás
To trace the shape of an uneven wall onto a piece of wood and cut it to fit.
Sheen Brillo
How shiny a finish is.
Shop drawings Planos de taller
The maker’s own detailed drawings of what they will build, checked before work starts.
Stud Montante
One of the upright framing pieces inside a wall.
Veneer Chapa de madera
A very thin slice of fine wood glued over a plainer panel.

Questions people ask.

What is the difference between face-frame and frameless cabinets?

Face-frame cabinets have a solid-wood frame on the front of the box; frameless cabinets have none and use hidden hinges, giving more access and a cleaner look.

Are custom cabinets worth it?

In older South Coast houses with uneven walls and odd spaces, custom cabinets are built and scribed to fit, use better materials, and can match the house’s original work.

How long do custom cabinets take?

Usually several weeks from approved drawings through building and finishing, depending on the job and the shop’s schedule.

Does AMN build custom cabinets in Santa Barbara?

Yes. Tom and Nic build cabinetry and built-ins in our shop in Carpinteria and install them from Goleta to Carpinteria. Call Tom at 818 201 4348.

What are inset cabinets?

Cabinets whose doors and drawers sit inside the face frame, flush with it, with a thin even gap all around. It is the look of old built-ins and the least forgiving to build: the frame must be square and the boxes set dead plumb.

How is a curved cabinet or island end built?

As a drum in the shop: a flat plywood spine, half-round formers cut from one template, and a skin of two layers of bending plywood glued up, then veneered. The formers are cut smaller than the finished radius by the measured thickness of the skin.

Sources and checks

Rules change with each code cycle, and the plans, the inspector, the adopted code and the maker’s instructions overrule any course. Code references are to the 2025 California Building Standards Code (Title 24), in force since 1 January 2026; check the local amendments of the city or county. This page was checked against these on 18 November 2026:

  • Architectural Woodwork Institute, Architectural Woodwork Standards (grades: Economy, Custom, Premium)
  • CARB Airborne Toxic Control Measure for composite wood products and TSCA Title VI (formaldehyde emission limits)
  • KCMA/ANSI A161.1 (performance of kitchen cabinets)
  • AMN crew field guide: Cabinetry and millwork