New · 3DWalk the shop: 11 stationsWatch each task done step by step, find the mistakes on an inspector walk, then pass the check question at every station.Enter the shop →
← Crew training glossaryAMN ConstructionEspañol
AMN Build · Santa Barbara South Coast
Cabinetry and millwork school

Learn cabinetry and millwork in the order a crew learns it.Read it, play it, then build it.

Read

The Complete Guide to Cabinetry and Millwork

Safety, materials and CARB paperwork, codes and licensing, field checks, base and wall cabinets, scribing, hinges, drawers, countertops, finishing and local rules. Every line carries a confidence tag.

Open the guide
Calculate

Cabinetry and Millwork Math in 3D

Hinge cup centers, plumb tolerance, drawer box sizes, sheet yield and fillers. Move the sliders and see the numbers.

Open the math
Read this first: what is not confirmed
S sourced P crew practice C confirm with building official ? unverified
The path

Four stages. Finish one before the next.

Each stage names what to read, what to play and what to build. Tick items as you finish them. Ticks stay in this browser only.

Math index

Search for the thing you are stuck on. Each scene shows how well its numbers are sourced.

Guide contents

Day 1 sections first. Then follow your stage.

Built for this coast

Montecito is County land. Check your address.

Montecito is unincorporated County of Santa Barbara land. The City of Santa Barbara is a different jurisdiction with its own rules. The research found City construction hours and a City permit exemption, but not County permit triggers, County hours or Montecito Board of Architectural Review thresholds for interior cabinets. Call County Building and Safety before you assume anything. Guide section 17 lists what we found and what is still unconfirmed.

Plans win

The approved plans, the adopted California codes and your inspector overrule this site.

Safety first

Read guide section 1 before you use a tool. Stone dust: water and exhaust first, respirator last.

Ask Nic

Questions or fixes: purchasing@amnbuild.com