Crew training: the glossary, and a page for each trade.

The words we use on a job, in plain language. Pick a trade to open its training page, or read the glossary below.

Training pages by trade

Walk the job site · 3D

Each trade has a 3D shop or job site. Walk it station by station, watch the real work, find the mistakes, pass the checks. Progress is kept in this browser.

Glossary

Site and excavation

Grade
The level of the ground surface. Finish grade is the final surface; rough grade is before final shaping.
Over-excavation
Digging deeper than the plans call for to remove weak soil, then replacing it with compacted fill.
Compaction
Mechanically packing soil or gravel so it will not settle under a slab or footing.
Shoring
Temporary bracing that holds a trench or excavation wall from caving in.

Site and excavation training page →

Foundations and concrete

Footing
The widened concrete base under a foundation wall or post that spreads the load into the soil.
Stem wall
The short concrete wall that rises from the footing and carries the framed wall above.
Rebar
Steel reinforcing bar set inside concrete to carry tension.
Anchor bolt
A bolt cast into the concrete that ties the sill plate to the foundation.
Slump
A measure of how wet or stiff a concrete mix is, taken before it is placed.

Foundations and concrete training page →

Framing

Plate
The horizontal member at the top or bottom of a stud wall. Sill plate sits on the foundation; top plate caps the wall.
Header
A beam over a door or window opening that carries load around it.
Shear wall
A wall braced to resist sideways forces from wind and earthquakes.
Blocking
Short pieces of lumber fitted between framing members for stiffness or as a nailing surface.
On center (OC)
Spacing measured from the center of one member to the center of the next.

Framing training page →

Roofing

Underlayment
The water-resistant layer under the finished roofing material.
Flashing
Thin metal or membrane that directs water away at valleys, walls, chimneys and penetrations.
Pitch
The slope of a roof, stated as rise over a 12 inch run.
Eave
The lower edge of the roof that overhangs the wall.
Ridge
The horizontal line where two roof slopes meet at the top.

Roofing training page →

Windows, doors and weatherproofing

Rough opening
The framed hole a window or door is installed into, sized larger than the unit.
Sill pan
A waterproof tray under a window or door that catches and drains any water that gets in.
Head flashing
Flashing above an opening that sheds water over the top of the frame.
Weather-resistive barrier (WRB)
The water-shedding layer behind the exterior finish, often called house wrap.
Shim
A thin wedge used to set a unit plumb, level and square in its opening.

Windows, doors and weatherproofing training page →

Plumbing

Rough-in
Installing supply and drain lines inside walls and floors before they are closed up.
DWV
Drain, waste and vent: the system that carries wastewater out and lets air in behind it.
Trap
The curved section of drain that holds water to block sewer gas.
Stub-out
The end of a pipe left sticking out of the wall, where a fixture will connect.
Shutoff valve
A valve that stops water to a fixture or to the whole house.

Plumbing training page →

Electrical

Rough-in
Running cable and setting boxes before the walls are closed.
Circuit
A path from the panel, through the devices on it, and back.
Panel
The box that distributes power to circuits, each protected by a breaker.
GFCI
Ground-fault circuit interrupter: a device that cuts power fast when it senses current leaking, used near water.
Home run
The cable that runs from a circuit's first box back to the panel.

Electrical training page →

Heating, cooling and ventilation

Load calculation
The math that sizes heating and cooling equipment to the actual house.
Supply and return
Supply ducts deliver conditioned air to rooms; return ducts bring it back to the equipment.
Register
The grille where air enters or leaves a room.
Mini-split
A ductless heat pump with an outdoor unit connected to one or more indoor heads.
CFM
Cubic feet per minute: how much air moves past a point.

Heating, cooling and ventilation training page →

Insulation and air sealing

R-value
A measure of resistance to heat flow. Higher is better.
Air sealing
Closing gaps and cracks so air does not leak through the building envelope.
Thermal bridge
A path, often framing, where heat bypasses the insulation.
Vapor retarder
A layer that slows moisture moving through a wall or ceiling.
Blower door test
A fan test that measures how leaky a house is.

Insulation and air sealing training page →

Drywall and plaster

Taping
Embedding paper or mesh tape in joint compound over the seams between sheets.
Skim coat
A thin layer of compound or plaster over a whole surface to even it out.
Levels of finish
The industry's 0 to 5 scale of how much compound and sanding a drywall surface receives. Level 5 is the smoothest.
Corner bead
A metal or vinyl strip that protects and straightens an outside corner.
Float
To flatten and smooth wet plaster or compound with a trowel or knife.

Drywall and plaster training page →

Tile and waterproofing

Substrate
The surface the tile is set on, such as backer board or a mortar bed.
Membrane
A waterproofing layer under or behind tile, in a shower especially.
Thinset
The cement-based adhesive that bonds tile to the substrate.
Flood test
Filling a shower pan with water for a set time to prove it holds before tile goes on.
Lippage
The height difference between the edges of two neighboring tiles.

Tile and waterproofing training page →

Cabinetry and millwork

Face frame
The solid frame on the front of a cabinet box that the doors attach to.
Inset
Doors and drawers set inside the face frame, flush with it.
Reveal
The small, even gap showing between a door or drawer and its frame.
Scribe
To cut a piece to follow an uneven wall or floor so it fits tight.
Toe kick
The recessed base under a cabinet so you can stand close.

Cabinetry and millwork training page →

Floors and paint

Acclimation
Letting flooring sit in the house so it adjusts to the room's moisture before install.
Floating floor
Flooring that is joined to itself but not fastened to the subfloor.
Primer
The first coat that seals the surface and helps the paint stick.
Cutting in
Brushing a clean line at edges and corners before rolling the field.
Sheen
How glossy a finish is, from flat to high gloss.

Floors and paint training page →

Construction project management

RFI
Request for information: a written question to the designer or owner when the plans are unclear or conflict.
Submittal
Product data, shop drawings or samples sent for approval before anything is ordered or built.
Change order
A written change to the scope, price or schedule of the contract, signed before the work is done.
Critical path
The longest chain of dependent tasks. A delay on it delays the finish date.
Retainage
A percentage of each payment held back until the work is complete.
Lien waiver
A signed release of lien rights, given in exchange for payment. Conditional waivers take effect only when payment clears.

Construction project management training page →

Finish carpentry

Casing
The trim framing a door or window opening.
Reveal
The small, even offset between a jamb and its casing.
Coped joint
A joint where one molding is cut to the profile of the other so it stays tight if the wall moves.
Mitered joint
A joint where two pieces are each cut at an angle, usually 45 degrees, to meet at a corner.
Stool and apron
The window sill shelf, and the trim piece under it.
Scribe
To cut a piece to follow an uneven wall or floor so it fits tight.
Backband
A molding applied around the outer edge of casing to add depth.

Finish carpentry training page →