Check yourselfHow much should a patio slab fall to drain, and over what distance does code care?
About 1/4 in per foot (roughly 2 percent). The model code asks for 2 percent on impervious surfaces within 10 ft of the foundation. Check the code edition your city has adopted.
3
Form and reinforce
You can build forms that hold, place steel at the right height and cover, and pass inspection.
Check yourselfWhere do control joints go on a 4 in slab?
Spaced 2 to 3 times the slab thickness in inches, read as feet: 8 to 12 ft for 4 in. Cut them a quarter of the slab depth, usually 4 to 12 hours after finishing with a conventional saw.
6
Cure and protect
You can keep the slab wet and warm enough to reach strength, and you know when you can load it.
Check yourselfWhat goes between a slab and the sill plate, and what must the plate be made of?
A sill sealer (foam gasket). Wood touching concrete must be pressure-treated or a naturally durable species (model code R317.1). Anchors and spacing come from your adopted code and the plans.
Safety, every step
Cutting, grinding and mixing make silica dust. Cut wet or with a shroud and vacuum, wear a respirator, and keep eyewash close. Guide section 2 and the PPE group in Tools cover it. Cal/OSHA rules apply on the job.
Santa Barbara coast
Salt air, shaking ground and expansive clay change cover, steel and footings. Guide section 15 covers the local code. Ask your building department and engineer before you rely on any number here.
Learn it once. Run it right every job.
Questions or corrections
purchasing@amnbuild.com
Send what you saw on site. Nic reads every one.
The 3D models are drawn from research, not photographs. Milwaukee matches in Tools come from retailer and press pages and some are marked unverified. Local rules cover Santa Barbara, Carpinteria and county practice and several items are marked unverified. Figures are for learning. The plans, the engineer and your building department govern. As of October 2026.
Sources are listed in each part: PCA, ACI, ASTM, OSHA and Cal/OSHA, manufacturer manuals and the city and county codes. Step ticks and quiz answers are saved only in your browser.