Pick a tool. The 3D scene plays the job step by step, the close-up turns it around, and the card gives the steps, the Milwaukee version where one exists, and the Montecito and Santa Barbara rules that apply.
Scenes are simplified drawings, not to scale. Numbers and rules are tagged with their source on each card; anything marked (practice) is field habit and anything marked (unverified) should be checked with your supplier, engineer or inspector. Wear the safety gear listed on every card. Built 27 Oct 2026 for the Keep It In-House series.