The Complete Guide to Site and Excavation
Day-one safety, plans, 811, trench protection, soils and slopes, grading, compaction, stormwater and the local rules for Montecito and Santa Barbara. Every claim carries a confidence chip.
Open the guideOne guide, math scenes and tools in 3D, tied to a four-stage path.
Day-one safety, plans, 811, trench protection, soils and slopes, grading, compaction, stormwater and the local rules for Montecito and Santa Barbara. Every claim carries a confidence chip.
Open the guideTrench volume, haul loads, slopes, pipe fall, compaction targets, the 811 dig window and cut and fill balance. Move the sliders and see the numbers change.
Open the mathSpin each tool, read the mistakes and safety notes and take the quiz. Eight families, from shovels to shoring and nuclear density gauges.
Open the toolsEach stage names what to read, what to play and what to do. Tick items as you finish them. Ticks stay in this browser only.
Search for the thing you are stuck on. Each link opens that scene.
Sections 1 to 4 first. Then follow your stage.
Montecito is unincorporated County of Santa Barbara. County Planning and Development issues the permits and Montecito Fire sets access and defensible-space rules. The City of Santa Barbara is a separate jurisdiction with its own office. The County Grading Code (Ch. 14) triggers and the 2025 County building code adoption are now in the guide (mirror text, confirm with P&D). County-published work hours, Coastal Zone, debris-flow and board of architectural review rules were not found: the guide lists them as unconfirmed.
City of Santa Barbara work hours (7 am to 8 pm) do not apply in Montecito; County hours are a secondary summary only. Sloping or benching deeper than 20 ft needs a registered engineer (Cal/OSHA Appendix B). The 96-hour post-rain inspection is Risk Level 2 and 3 only. The state stormwater permit applies above 1 acre.
No one enters a trench until the competent person has inspected it that day. Call 811 before you dig. Stop and call your lead if the shovel hits metal.
Questions or fixes: purchasing@amnbuild.com