← Crew training glossaryAMN Construction
New · 3DWalk the job site: 11 stationsWatch each task done step by step, find the mistakes on an inspector walk, then pass the check question at every station.Enter the job site →
AMN Build · Santa Barbara South CoastEspañol
Tile and Waterproofing School3 resources · 4 stages

Learn tile and waterproofing in the order a crew learns it.Read it, play it, then build it.

One guide, math scenes and tools in 3D, tied to a four-stage path.

Read16 sections

The Complete Guide to Tile and Waterproofing

Silica safety, substrates, shower pan code, building and flood testing a pan, setting, cutting, grout, movement joints, failures and local rules. Every claim carries a confidence chip.

Open the guide
Calculate14 scenes

Tile Math in 3D

Move the sliders and watch pan slope, dam height, tile counts, coverage and joints change. Every rule shows its numbers.

Open the math
Handle58 tools

Tile Tools in 3D

Spin each tool, read the mistakes and safety notes, and take the quiz. Eight families, from tape to flood-test plug.

Open the tools
The path

Four stages. Finish one before the next.

Each stage names what to read, what to play and what to build. Tick items as you finish them. Ticks stay in this browser only.

Math index

Rules you can move with a slider.

Search for the thing you are stuck on. All scenes are in the math page.

Guide contents

Sections in the guide.

Section 1 first. Then follow your stage.

Flood test time: two numbers

The code mirror gives a minimum of 2 in of water for 15 minutes. Schluter says 24 hours is typical for its system. Use the longest of the code, the maker and the inspector. The official code text could not be opened. [?]

Still to verify

County code edition, membrane code requirement, tile-only permit trigger. A Class B may not take tile as a single-trade subcontract (CSLB). The guide lists them all under Open questions.

Built for this coast

Montecito is County land. Check your address.

Much of Montecito sits outside the City of Santa Barbara. County rules and Montecito Fire apply there, and interior tile work is exempt from Montecito design review. City hours of 7 a.m. to 8 p.m. are a City rule; County hours were not found. Guide section 15 lists what we found and what is still unconfirmed.

[S] sourced[P] crew practice[C] confirm with building official[?] unverified
Plans win

The approved plans, the adopted California codes, the membrane maker and your inspector overrule this site.

Safety first

Read guide section 1 before you cut anything. Tile dust is respirable silica: wet cut, HEPA vacuum, sealed P100 respirator.

Ask Nic

Questions or fixes: purchasing@amnbuild.com