The Complete Guide
Safety, the water path, openings, barrier, sill pans, flashing order, sealants, doors, egress, energy, fire hardening, testing and the Montecito rules. Every point is tagged.
Open the guideSafety, the water path, openings, barrier, sill pans, flashing order, sealants, doors, egress, energy, fire hardening, testing and the Montecito rules. Every point is tagged.
Open the guideRough openings, sill-pan slope, flashing laps, tape take-off, sealant yield, egress, glazing area and test numbers, with sliders.
Open the mathSpin each tool or part, read the mistakes and safety notes, and take the quiz. Prices were not found, so every buy note says verify.
Open the toolsEach stage names what to read, what to play and what to build. Tick items as you finish them. Ticks stay in this browser only.
Search for the thing you are stuck on. Each link opens that scene.
Sections 1 and 2 first. Then follow your stage.
The number is how many tools sit in the family. Each link opens the first tool in it.
Montecito is unincorporated County of Santa Barbara, so City of Santa Barbara window rules do not apply there [B]. County permit rules for windows and doors, the County's building code edition and adoption date, coastal and hillside rules and any construction-hours rule were not found. County BAR review applies in the Montecito Community Plan area, and the County's quiet hours for amplified sound are 10 p.m. to 7 a.m. Sunday to Thursday nights and midnight to 7 a.m. on Friday and Saturday nights (construction not mentioned). Call the County counter. Montecito Fire adopted the 2025 California Fire Code and WUI Code on Nov 17, 2025 [S7]. The guide's local rules table lists each item as confirmed or unconfirmed.
Crew practice, not a sourced number. The window maker controls. [P][V]
Roseville and Elk Grove 2025 forms show U 0.27 and SHGC 0.23, San Bernardino County quotes 0.30. None is Santa Barbara. Use the NFRC label and the CF1R. [V]
4, 6 and 9 in are common sizes, not code rules. Follow the WRB and unit makers. [S8][S11]
The approved plans, the adopted California codes, the unit maker's instructions and your inspector overrule this site.
Read guide section 1 before you use a tool. Set ladders at one quarter of the working length.
Questions or fixes: purchasing@amnbuild.com