Keep It In-House · Plumbing AcademyEspañol
Learn it · see it · handle it

Know the work before you touch the pipe.
Four weeks, three tools, one local rulebook.

A plumbing course built for builders in Montecito: do the math, learn the tools in 3D, then check yourself.

Start here

Three ways in. Use them in this order.

1 · GuideRead
18

sections: the full CPC-based guide with a 30-day plan, job checklists and a self-test. Keep it open as the reference.

Open the guide
2 · Math in 3DWork it
13

animated scenes: slope, offsets, fittings, sizing and the other numbers you use daily. Tick each one when you can do it cold.

Open the math
3 · Tools in 3DSee it
141

tools with a 3D model that shows how each one works, a Milwaukee match where one exists, and a Montecito note on ten of them. Mark what you own.

Open the tools

The three links open in a new tab. Each page keeps its own progress in that browser only, so use the same browser each time.

The plan

Four weeks, one skill at a time.

See the work

Read guide sections 1–5. Do math scenes 1–4. Open the Day 1 kit in the tools page and look at every tool.

Guide 1–5Math 1–4Day 1 kit

Cut and join

Learn cutters, saws, reamers, torch, press, crimp and expansion tools by watching each one run. Then do math scenes 5–8.

Math 5–8Join kit

Drain, vent, test

Slope, no-hub couplings, augers, camera, locator and test plugs. Math scenes 9–11.

Math 9–11Drain kitTest kit

Permit and prove it

Montecito permit path, inspections, then the self-test below and math scenes 12–13.

Math 12–13Self-test
Montecito

Who you call. Phone numbers are from our earlier research.

Permits and inspections
(805) 568-2000
County of Santa Barbara. Montecito is unincorporated, so the County, not the City, issues the permit.
Water
(805) 969-2271
Montecito Water District
Sewer
(805) 969-4200
Montecito Sanitary District
Fire
(805) 969-7762
Montecito Fire Protection District. Sprinkler questions start here.

The County adopted the 2025 California Plumbing Code on 11-18-2025, and we read it on a third-party code host. Still unconfirmed: fee schedule, owner-builder rules, remodel sprinkler thresholds, current ADU plumbing rules and the inspection scheduling cutoffs. Call before you plan around any of them.

Mistakes that look right

Six things most beginners get backwards.

Soldering

The flame goes on the fitting. The copper melts the solder, not the flame. Touch the solder to the joint opposite the flame.

Pipe wrench

It grips only when pulled in the direction the hook faces. Leave a little slack so the jaw can float and bite.

Tubing cutter

A quarter turn per lap, not more. Over-tightening crushes the tube and spirals the cut.

Hacksaw

Teeth point away from the handle. It cuts on the push; ease off on the pull.

No-hub bands

Torque to 60 in-lb with a torque driver, not an impact driver. Larger sizes and makers differ, so read the coupling's own sheet.

ProPEX

Cold expansion works only on PEX-A, because it remembers its shape. Put the ring on first, then expand.

Self-test

Nine questions. Wrong answers teach more.

Question 1 of 8Score 0
Next step

Finish the week, then pick one job. Walk it through the kit first.

Use the job kits on the tools page to gather what you need before you start. Questions or corrections: purchasing@amnbuild.com. — Nic

Illustration and training only. This is not a code opinion and does not replace the County's adopted plumbing code, the manufacturer's instructions or your inspector. Tool models are drawn in code, not photographs. Contact numbers and local rules were gathered from public sources and should be confirmed before you rely on them.