← Crew training glossaryAMN Construction
New · 3DWalk the job site: 11 stationsWatch each task done step by step, find the mistakes on an inspector walk, then pass the check question at every station.Enter the job site →
AMN Build · Santa Barbara South CoastEspañol
Framing School4 resources · 1 path

Learn framing in the order a crew learns it.Read it, play it, then build it.

One guide, thirty-one math scenes and 119 tools in 3D, tied to a four-stage path.

Read18 sections

The Complete Guide to Framing

Safety, tools, lumber, plans and permits, floors, walls, roofs, stairs, remodels, coastal rules and the business side. Section 18 covers Montecito.

Open the guide
Calculate31 scenes

Framing Math in 3D

Move the sliders and watch studs, rafters, stairs, joists and shear walls change. Every rule shows its numbers.

Open the math
Handle119 tools

Framing Tools in 3D

Spin each tool, watch how it works, read the mistakes and safety notes, and take the quiz. Eight families, from tape to telehandler.

Open the tools
The path

Four stages. Finish one before the next.

Each stage names what to read, what to play and what to build. Tick items as you finish them. Ticks stay in this browser only.

Math index

Thirty-one rules you can move with a slider.

Search for the thing you are stuck on. All scenes are in the math page.

Guide contents

Eighteen sections in the guide.

Section 1 and 2 first. Then follow your stage.

Built for this coast

Montecito is County land. Check your address.

Much of Montecito sits outside the City of Santa Barbara. County of Santa Barbara rules and Montecito Fire apply there, with design review from the Montecito Board of Architectural Review. Guide section 18 lists what we found and what is still unconfirmed.

[S] sourced[P] crew practice[C] confirm[?] unverified
Plans win

The approved plans, the adopted 2025 California Residential Code and your inspector overrule this site.

Safety first

Read guide section 2 before you use a tool. Fall protection starts at 6 feet on residential framing.

Ask Nic

Questions or fixes: purchasing@amnbuild.com