AMN Construction

Trade 01 of 13

Site work, where the ground gets a vote.

Before anything is built, the ground is read, cleared, graded and drained. Surprises here cost more than anywhere else in the project.

In short

  • The soils report decides what the foundation has to be. Read it before you fall for a floor plan.
  • Water is the real subject: where roof and yard water goes is settled here, not later.
  • What you cannot see in the ground (rock, old fill, buried lines) is the biggest swing in cost.
Drawing: Site work and excavation12345
  1. CutSoil dug away on the uphill side. The dashed line is the original ground.
  2. Compacted padSoil laid in layers and tested, so the house sits on firm ground.
  3. FillSoil added on the downhill side, held back by a wall.
  4. Retaining wallHolds the pad edge. It needs drainage behind it.
  5. Water leaves the houseGrading sends rain away from the walls, not toward them.
A section through a sloping lot: soil cut from the uphill side, fill on the downhill side, a compacted pad, and water sent away from the house.

What you will see

In the order it happens.

  • NoiseHigh
  • MessHeavy
  • Your sayMedium
  1. Step 1

    Survey stakes, fencing and erosion control go up first. Straw rolls or fabric fences keep soil out of the street and creek.

  2. Step 2

    Heavy equipment arrives. Expect trucks, noise from early morning, and dust that is watered down.

  3. Step 3

    The building pad is cut, filled and compacted in layers. A soils engineer tests it.

  4. Step 4

    Trenches follow for drains and utilities, then the site is rough-graded and left shaped to shed water.

How it is done well

The techniques that matter.

  • A geotechnical (soils) report is done before design is final, so the foundation fits the ground.
  • Erosion and sediment control goes in before the first scoop of soil, not after the first storm.
  • Buried lines are marked before digging (call 811), and kept trees are fenced at the branch tips.
  • Compaction is tested and recorded, not assumed.

The hardest parts

Where this trade earns its fee.

  • Unknowns: rock, old fill or a buried tank turn a fixed price into an added cost.
  • Hillside lots: retaining walls, limited truck access and rainy-season limits on when you may grade.
  • Drainage that works on the drawing but not in a real storm.

Think deeply here

Decide this before the trade starts.

These are the choices that decide whether the finished house matches the one in your head. Changing them later costs time and money.

  • Where the house sits and its floor level, because that sets every cut, fill and wall.
  • Driveway slope and where cars turn around.
  • Which trees and views are non-negotiable.
  • Where water goes when it rains hard, including the neighbors’ side.

Ask any builder

  • What does the soils report say, and who confirms compaction?
  • What happens to the price if we hit rock or old fill?
  • Where does roof and yard water go in a heavy storm?

All the trades, in the order you will meet them

  1. 01Site work
  2. 02Foundations
  3. 03Framing
  4. 04Roofing
  5. 05Windows and exterior
  6. 06Plumbing
  7. 07Electrical
  8. 08HVAC
  9. 09Insulation
  10. 10Drywall and plaster
  11. 11Tile
  12. 12Cabinetry
  13. 13Floors and paint

General guidance, not a specification. Your drawings, your engineer and your building inspector govern every job. See the whole process · Trade secrets home

Inquiries

Want this explained on your own house?

Email the address. A written reading of the parcel is free, in two business days.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.