Tile, and the waterproofing beneath it.
In a shower, the waterproofing under the tile keeps the house dry. The tile is the finish. Flat walls and a floor that slopes to the drain make it look right and work properly.
- Grout is not waterproof. The membrane under it is.
- Layout is the artistry: where the cuts fall decides whether it looks custom or cheap.
- Large tile needs a much flatter wall and floor than small tile.
- Membrane up the wallThe waterproof layer runs up the walls and over the curb. Tile is not waterproof.
- Tile on thinsetThe finish. Layout decides how it looks.
- Floor slopes to the drainTested with standing water before tile covers it.
- CurbHolds water in. A curbless shower needs more floor work.
- DrainThe low point of the floor.
In the order it happens.
- Low
- Medium
- High
Backer board or a membrane system goes up, and seams are sealed.
The floor is sloped to the drain, then waterproofed and filled with water to test it.
Layout lines go on the walls and floor, and the tiler sets a few tiles to check the pattern.
Tile is set and grouted, and stone is sealed. Caulk, not grout, goes at moving corners.
The techniques that matter.
- The membrane is lapped up the walls and over the curb, and sealed at the drain.
- The shower floor is sloped to the drain, and tested with water before tile covers it.
- Layout is balanced so that no tile is cut to a sliver at an edge or corner.
- The wall behind large-format tile is flattened first.
Where this trade earns its fee.
- Large-format tile, which shows every wall imperfection.
- Patterns that must line up through niches, corners and benches.
- Curbless showers, which need a lowered floor planned early.
Decide this before the trade starts.
These are the choices that decide whether the finished house matches the one in your head. Changing them later costs time and money.
- Tile type and size, seen in your own light with a sample.
- Layout and the focal wall, and where the grout lines land.
- Niche size and placement.
- Curb or curbless, and the drain style.
- Grout color, which changes the look as much as the tile.
- Will the shower be flood tested before tile?
- Can I see the layout before tile is set?
- What waterproofing system is used, and who warrants it?
- Site work
- Foundations
- Framing
- Roofing
- Windows and exterior
- Plumbing
- Electrical
- HVAC
- Insulation
- Drywall and plaster
- Tile
- Cabinetry
- Floors and paint
General guidance, not a specification. Your drawings, your engineer and your building inspector govern every job. See the whole process · Trade secrets home
Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Want this explained on your own house?
Email the address. Matt reads it himself and replies in writing within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated October 2026