AMN Construction
AMN Construction · Trade School · Tile and waterproofing

Trade School · course 21 of 28

Tile and waterproofing. Tile is not waterproof. The layer behind it is.

Grout and tile let water through; a shower stays dry because of a membrane you never see. This course builds a shower wall layer by layer, lays out every tile you will meet on the South Coast, fires a tile, and walks a century from mortar-bed baths and California art tile to large-format porcelain.

7 chapters35 3D scenes10 min readSanta Barbara South CoastChecked 19 Nov 2026

The 3D scenes need WebGL, which this browser has turned off. Every word of the course is still here on the left.

Chapter 1 of 7

Inside a tiled shower wall.

From the studs out, a modern shower wall is a board, a waterproof membrane, mortar, tile and grout.

Five layers

Studs with blocking for grab bars and niches, a backer board, a waterproof membrane, thin-set mortar, and tile with grout in the joints.

The membrane does the work

Liquid-applied or sheet membranes are continuous behind the tile, lapped at seams and corners and sealed at every pipe. Water that gets through the grout runs down the membrane to the drain.

WhyGrout is porous. A shower without a working membrane leaks into the wall every day it is used, slowly.

Mortar coverage

Tile is set in thin-set with a notched trowel, and back-buttered when large, so the mortar covers essentially the whole back of the tile in wet areas.

Chapter 2 of 7

Every tile you will meet here.

Tile is chosen for looks, but its body decides where it can go.

Porcelain and ceramic

Porcelain is dense and absorbs almost no water, good on floors and outdoors. Glazed ceramic is softer underneath its glaze, fine on walls.

Saltillo and zellige

Saltillo is handmade Mexican terracotta, porous and sealed, warm underfoot. Zellige is hand-cut Moroccan glazed tile, deliberately uneven.

Santa Barbara: Saltillo floors and colorful Spanish and Moorish-style tile are part of the Spanish Colonial Revival look on the South Coast.

Stone and large format

Marble and limestone are beautiful and soft; they etch with acid and need sealing. Large porcelain panels give near-seamless walls but need flat substrates and special handling.

Chapter 3 of 7

From clay powder to a fired, glazed tile.

Modern porcelain is pressed from powder under enormous force and fired fast.

Seven stations

Clays and minerals are ground, spray-dried into powder, pressed, glazed and printed, fired in a roller kiln, sorted by shade and size, and boxed.

Shade and caliber

Every box is marked with a shade lot and a size (caliber). Buying all the tile for a room from one lot, with overage, avoids mismatches.

Chapter 4 of 7

Set right: slope, flat, movement.

Shower floors and big tiles are where tile work goes wrong.

Slope to the drain

Shower floors slope to the drain, typically 1/4 inch per foot, under the membrane or with a pre-sloped system. A linear drain allows a single-plane floor and large tile.

Flood test

Before any tile goes down, the shower pan is plugged and flooded for a day or as the inspector requires, and the level is checked.

WhyFinding a leak at this stage costs an afternoon. Finding it after tile costs the bathroom.

Leave room to move

Tile and substrates expand and shrink. Movement joints, filled with flexible sealant, go at changes of plane and around the perimeter.

Chapter 5 of 7

From art tile to porcelain panels.

California has a tile history of its own, and the South Coast has plenty of it.

1920s: California art tile

Potteries such as Malibu Potteries (1926 to 1932) and Catalina made vivid Spanish and Moorish-style tile for stair risers, fountains and baths in Spanish Colonial Revival houses.

1940s: the mud bed

Tile was set on a thick, reinforced mortar bed, durable and heavy, often with a lead or copper shower pan underneath.

1970s: color and adhesive

Colored ceramic tile set with organic mastic on drywall went into many remodels; much of it has since failed in showers.

2000s: membranes

Bonded waterproof membranes over backer board became the norm, tested to ANSI standards.

Today

Large-format porcelain, linear drains, curbless showers and bonded membranes with matched mortars.

Chapter 6 of 7

The same trade, on a real ADU.

Every course ends on one building: a 710-square-foot ADU on Canon Drive in the Santa Barbara foothills, modelled from its permit set before pricing. Three gables, three floor levels, a steel canopy, and a list of questions the drawings left open. Here is the tile scope in two small baths.

Shower walls 6 feet up

The shower in bath 105 is tiled at least 6 feet above the drain, over a shower pan and backer board. The glass door as drawn swings into the shower; inspectors commonly want it to swing out with 22 inches clear, so we asked.

Floors in both baths

Tile floors in the bath and the powder room. The interior finish schedule was missing from the set, so the model shows a neutral porcelain for visualization only.

An unlabelled square

The floor plan shows a small square with a circle on the bath wall north of the toilet, with no keynote. It could be a floor drain, a fan or an access panel. One question saves a wrong hole in a tiled wall.

Chapter 7 of 7

What it means for your bath and kitchen.

Old tile is often the best thing in an older bath. Old waterproofing usually is not.

Save the art tile

Original 1920s and 1930s decorative tile is often irreplaceable. We protect it, or number each piece and remove it from behind, then reset it in order when a bath is rebuilt. Trim pieces like the bullnose cap are the hardest to match.

Check for hidden leaks

Loose tile, cracked grout, stains below a shower and a soft subfloor point to a failed pan. Opening one wall tells us what the rest is like.

Tiling a wall

Wall tile in a wet area goes over cement board or a foam board with taped seams and a membrane over it. The tile starts from a level line one row up, not from the tub or floor, which are rarely level, and the bottom row is cut last to fit. Where tile meets a tub, the joint gets flexible sealant, not grout.

WhyA wall started from an out-of-level tub carries the error to the ceiling. The level line costs five minutes.

Picking the grout

Narrow joints take unsanded grout, wider joints sanded grout. Epoxy grout costs more and takes skill to install but resists stains and needs no sealing, which suits kitchen floors and showers. Where tile meets a different plane, a wall to a floor or a tub, the joint gets flexible sealant instead of grout so it can move.

WhyGrout cracked in a straight line at an inside corner is a movement joint that was grouted. It should be sealant.

Laying out the tile

Before the first tile is set, center lines are snapped and the room is dry-laid so the cuts at opposite walls come out equal and no row ends in a thin sliver. Grout joints line up with the main sightline, usually the doorway. On large tile, leveling clips keep edges flush so there is no lip to catch light or toes.

WhyThe layout decides how the floor looks more than the tile does. It takes an hour and saves a floor.

Curbless showers, niches and benches

A curbless shower has no step: the floor framing under it is lowered so the mortar bed and membrane can slope to a linear drain at the threshold while the bath floor stays level. Niches are framed between studs with a sloped sill, benches are waterproofed and sloped like the floor, and the glass is tempered.

WhyCurbless showers are the easiest to age in, and the hardest to add late. The framing has to be planned before the plumber and the tile setter arrive.

Outdoor tile

Patios and stair risers outdoors need frost-free, low-absorption tile, slope for drainage, and movement joints.

Setting Saltillo and terracotta

Handmade clay tile like Saltillo is soft and thirsty. It is set in a full mortar bed with wide joints, sealed before grouting so the grout cannot stain it, grouted with sanded grout, then sealed again in two or more coats. Pieces vary, so boxes are blended as they are laid.

WhyGrout on unsealed Saltillo leaves a haze that will not come off. The pre-seal step is the one most often skipped.

Decks and balconies over rooms

A balcony over a living space is a roof you walk on. The deck slopes to a scupper or drain, a traffic-rated membrane laps up the wall behind the stucco and over the edge, tile or pavers go on top, and every railing post that pierces it is sealed.

WhyBalcony leaks rot framing out of sight. California now requires periodic inspection of balconies on many apartment and condo buildings for that reason.

Steam showers

A steam shower is a sealed room full of hot vapor that will find any gap. Every surface, the ceiling too, gets a vapor-retarding membrane rated for steam, with every seam and penetration sealed. The ceiling is sloped so condensation runs to the walls rather than dripping on the bather, benches slope to drain, and the glass runs to the ceiling with a sealed door. The steam head goes low on the wall, away from the bench and feet, and the generator is sized by the room's volume and its wall material and placed where it can be serviced.

WhyAn ordinary shower membrane is not a steam membrane. Check that the system is listed for steam rooms.

Flat enough for big tile

Tile with any side of 15 inches or more needs a flatter floor: the American standard allows no more than 1/8 inch of variation in 10 feet, and 1/16 inch in 24 inches, about half what smaller tile tolerates. Flatness is checked with a long straightedge before setting, and fixed with patch or self-leveling underlayment. Leveling clips keep the edges flush while the mortar cures, but they cannot fix a floor that was not flat.

WhyLippage on large-format tile is almost always a substrate that was never measured.

Thin porcelain slabs

Porcelain now comes in sheets as large as a stone slab and only about a quarter inch thick. They make a shower or a kitchen wall with almost no grout lines. They are fragile until set: carried flat on a frame with suction cups, cut with special tools, back-buttered and set in mortar chosen for that panel, over a wall that is flat and, in a shower, waterproofed first.

WhyA cracked panel is a lost panel and often a lost week. Ask whether the setter has done them before.

Flat tile, from flat floors

Large tiles are rarely perfectly flat; most have a slight bow in the middle. Set them at a half offset, and the high middle of one sits beside the low end of the next, so every joint shows a lip. The industry standard asks that tiles longer than eighteen inches be offset no more than a third, unless the maker says otherwise, and the floor itself has to meet a flatness tolerance before setting. Leveling clips help hold edges flush while the mortar cures, but they do not fix a wavy floor.

WhyRaking light down a hall shows every lip. Check the substrate with a straightedge and agree on the offset before the first tile.

Movement joints

Tile and the slab under it move at different rates with heat and moisture, and a floor locked tight at every edge has nowhere to go. The tile industry's detail for movement joints, EJ171, calls for soft joints filled with sealant at the perimeter and wherever tile meets another plane, and through the field about every 20 to 25 feet indoors, closer, about every 8 to 12 feet, where tile is in sun or outdoors. They also go over any joint or crack in the slab below. Without them, tiles tent up and pop.

WhyA floor that tents is usually a floor without perimeter joints. Grout to the wall looks finished and fails later.

Tile over a wood floor

A wood subfloor swells, shrinks and deflects, and tile bonded straight to it cracks. Tile over wood starts with a floor stiff enough for the tile chosen, then a second layer of plywood or an uncoupling membrane: a plastic sheet with a pattern of cavities, bonded to the subfloor with thinset, that lets the tile and the wood move a little independently. Its maker's instructions set the subfloor thickness, joist spacing and mortar to use.

WhyA cracked tile floor over wood is usually a stiffness or uncoupling problem, not a tile problem. Fix the floor first.

Grout haze

Grout left on the face of tile dries into a dull film called haze. It comes off easily in the first hour with a well-wrung damp sponge, rinsed often and used diagonally across the joints so it does not dig them out, and then a dry buff. Once cured it needs a haze remover chosen for both the grout and the tile, because acid cleaners that suit porcelain will etch marble, limestone and cement tile.

WhyClean as you go. An hour of sponging saves a day of chemical cleaning and protects stone from the wrong product.

After the film

Use it on a real house.

On your house

In a bath remodel the tile is the part you see and the membrane is the part that matters. We flood-test before we tile.

For our crew

The AMN crew trains on the full private set for this trade: a 3D job site you walk station by station, the lesson plan, the field guide, the math and the tools. Sign-in is not needed, but these pages are kept out of search.

Trades in this course

  • Deck and balcony waterproofing
  • Tile setting · C-54
  • Shower waterproofing · C-54

All 100 trades

Before you hire

In California, a license is needed for any job of $1,000 or more in labor and materials, any job that needs a permit, or any job where the worker hires help. Look up the contractor’s license number at cslb.ca.gov and check it is active and carries the right class:

  • Tile setting: CSLB class C-54

On the job: the install checklist.

The install chapter as a list to walk before you call the work done. Ticks stay in this browser only. Prints on one page.

Tile and waterproofing · Job: ________________ · Date: __________ · Checked by: ________________

Check yourself. Out loud.

The same drill our crew uses: give the answer in two sentences before you open each one. If you can only name the thing, read that chapter again.

01 The membrane does the workSay why it matters, then open

Grout is porous. A shower without a working membrane leaks into the wall every day it is used, slowly.

From chapter: Inside a shower wall

02 Tiling a wallSay why it matters, then open

A wall started from an out-of-level tub carries the error to the ceiling. The level line costs five minutes.

From chapter: Your house

03 Curbless showers, niches and benchesSay why it matters, then open

Curbless showers are the easiest to age in, and the hardest to add late. The framing has to be planned before the plumber and the tile setter arrive.

From chapter: Your house

04 Decks and balconies over roomsSay why it matters, then open

Balcony leaks rot framing out of sight. California now requires periodic inspection of balconies on many apartment and condo buildings for that reason.

From chapter: Your house

05 Thin porcelain slabsSay why it matters, then open

A cracked panel is a lost panel and often a lost week. Ask whether the setter has done them before.

From chapter: Your house

06 Movement jointsSay why it matters, then open

A floor that tents is usually a floor without perimeter joints. Grout to the wall looks finished and fails later.

From chapter: Your house

Words in this course.

13 terms in plain English, with the Spanish our crew uses. All 249 words across the school are on one page.

Back-butter Doble encolado
To trowel mortar onto the back of a tile as well as the floor.
Bullnose Canto boleado
A fully rounded edge on stone or tile.
Ceramic glaze Esmalte cerámico
The glassy coat fired onto a tile face; it gives color and keeps water out.
Grout Lechada
The filler in the joints between tiles.
Lippage Desnivel entre piezas
One tile edge sitting higher than the next.
Scupper Gárgola de desagüe
A hole in a parapet that lets water drain off a flat roof.
Sightline Línea de vista
What you can see from a given spot. Also the visible width of a window frame.
Spanish Colonial Revival Spanish Colonial Revival
The white-plaster, red-tile style that defines Santa Barbara, built mostly 1915 to 1930.
Stud Montante
One of the upright framing pieces inside a wall.
Thinset Adhesivo de capa delgada
The cement glue that tile is set in.
Threshold Umbral
The strip under a door. Also the moment of passing from one space into another.
Uncoupling membrane Membrana de desacople
A sheet under tile that lets it move independently of the floor below.
Zellige Zellige
Handmade glazed Moroccan tile. No two are alike.

Questions people ask.

Is tile waterproof?

No. Most tile and all cement grout let water through. A shower stays dry because of the waterproof membrane behind the tile and under the floor.

What is the best tile for a shower floor?

Porcelain or another low-absorption tile, small enough or flat enough to follow the slope to the drain, with a slip-resistant finish.

Can old Spanish tile be saved during a bathroom remodel?

Often, yes. Decorative tile from the 1920s and 1930s can be protected in place or carefully removed and reset. It is worth asking about before demolition.

How long does a tiled shower last?

A well-built shower with a bonded membrane, proper slope and movement joints should last decades. Failures usually come from the waterproofing, not the tile.

How often does a tile floor need movement joints?

The tile industry's EJ171 detail calls for soft joints at every perimeter and change of plane, and through the field about every 20 to 25 feet indoors, or 8 to 12 feet in sun or outdoors.

What is different about waterproofing a steam shower?

Everything is sealed against vapor, not only water. Every surface including the ceiling gets a membrane rated for steam, the ceiling slopes so drops run off, the glass goes to the ceiling with a sealed door, and the steam head sits low, away from the bench.

How flat does a floor have to be for large-format tile?

For tile with any side 15 inches or longer the American standard allows no more than 1/8 inch of variation in 10 feet and 1/16 inch in 24 inches. It is checked with a straightedge and corrected with patch or self-leveler before setting.

Sources and checks

Rules change with each code cycle, and the plans, the inspector, the adopted code and the maker’s instructions overrule any course. Code references are to the 2025 California Building Standards Code (Title 24), in force since 1 January 2026; check the local amendments of the city or county. This page was checked against these on 18 November 2026:

  • TCNA Handbook for Ceramic, Glass, and Stone Tile Installation
  • ANSI A108 and A118 (installation and materials), ANSI A118.10 (load-bearing bonded waterproof membranes)
  • California Plumbing Code (shower pan slope and testing)
  • California Residential Code R702.4 (ceramic tile and backers in wet areas)
  • Adamson House / Malibu Potteries history (1926 to 1932)
  • AMN crew field guide: Tile and waterproofing
  • TCNA Handbook, method EJ171 (movement joints); ANSI A108.02 (tile installation, offset for large tiles)
  • ANSI A108.02: substrate flatness for tile with any edge 15 in or longer (1/8 in in 10 ft, 1/16 in in 24 in)
  • TCNA Handbook: steam showers

Ask about your house

Matt Newman · 805 886 0988 · purchasing@amnbuild.com