Electrical, how you really live in each room.
Wiring is cheap to move before drywall and expensive after. Think through every room as you actually use it.
- Plan for what you will add later: an EV charger, induction cooking, a heat pump, solar or a battery.
- Switch and outlet locations are best marked on the framed walls, with you present.
- Electricians also return at the end to fit switches, outlets and lights.
- PanelWhere power is split into circuits. Leave spare room for what you add later.
- LightsTheir own circuit, usually dimmable.
- OutletsGeneral circuits. Mark every location on the framed walls.
- Kitchen circuitsBig appliances get dedicated circuits.
- EV chargerPlan the circuit now, even if the charger comes later.
- GroundingTies the system to the earth for safety.
In the order it happens.
- Medium
- Light
- High
Boxes are mounted on studs at consistent heights, and wire is pulled through the framing.
The panel is set and circuits are labeled.
The inspector reviews the wiring before insulation and drywall cover it.
At the end, switches, outlets and lights go in and everything is tested.
The techniques that matter.
- The panel is sized for future loads, with spare room, not just for today’s.
- Large appliances get their own circuits.
- Lighting is layered: general, task and accent, with dimmers where they help.
- Conduit is left in place for future needs such as solar, EV charging and low-voltage data.
Where this trade earns its fee.
- Bringing more power into an older house.
- Fitting recessed lights into insulated ceilings and tight spaces.
- Waiting on the utility for new service or a solar hookup, which can take months.
Decide this before the trade starts.
These are the choices that decide whether the finished house matches the one in your head. Changing them later costs time and money.
- A lighting plan with fixture types, not just locations.
- Switch and outlet placement, including islands, floors and outdoor areas.
- Future needs: an EV charger, solar, a battery and a generator inlet.
- Low-voltage wiring for data, audio, security and shades.
- How much spare capacity is in the panel?
- Will we walk the framed rooms and mark switches and outlets together?
- Where do the conduits for solar and EV charging run?
- Site work
- Foundations
- Framing
- Roofing
- Windows and exterior
- Plumbing
- Electrical
- HVAC
- Insulation
- Drywall and plaster
- Tile
- Cabinetry
- Floors and paint
General guidance, not a specification. Your drawings, your engineer and your building inspector govern every job. See the whole process · Trade secrets home
Want this explained on your own house?
Email the address. A written reading of the parcel is free, in two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.