The 2025 Energy Code and a new house: heat pumps, gas, and what to decide early
A new house permitted in California since January 1, 2026 is designed to the 2025 Energy Code. Owners ask whether gas is still allowed. The short version: the code is built around heat pumps, and anything else has to earn its place in the energy model.
The short answer: a new house whose permit was applied for on or after January 1, 2026 is designed to the 2025 Energy Code, which assumes heat pumps for both space and water heating. Gas is not banned by the state code, but the design must still meet the energy budget another way, and local rules can go further. Settle it at design, not plan check.
Which houses it covers
The 2025 Energy Code applies to building permit applications submitted on or after January 1, 2026: new houses, and additions and alterations to existing ones. A house whose permit was applied for earlier stays on the 2022 code.
The heat pump baseline
For a new single-family house, the prescriptive path now assumes heat pumps for both space heating and water heating. It is a baseline, not a ban: the energy model compares your design with that baseline, and the house has to do at least as well.
Can a new house still have gas?
Under the state code, a gas furnace, water heater or range is not prohibited outright. To use one, the design has to meet the energy budget another way, through the envelope, windows or other systems, on the performance path. Local rules can go further, so we check the town's current requirements before design. Fewer new ones are coming: a 2025 state law, AB 130, bars most new state and local residential building standards from October 1, 2025 to June 1, 2031, with exceptions such as wildfire home hardening and emergencies, while local rules already in effect by September 30, 2025 still apply (Building Standards Commission bulletin (opens in a new tab)).
Solar, and what else the model decides
New houses in California have had to include solar since the 2019 code, sized by the energy model. The same model shapes window sizes and glass, wall and roof insulation and duct design, so it belongs at design development, not at plan check. One number to know early: on the prescriptive path the 2025 code caps window U-factor at 0.30 in Climate Zones 6 to 10 (the Energy Commission lists Montecito, Santa Barbara, Carpinteria, Summerland and Goleta in Zone 6), and outside Fire Hazard Severity Zones every house has a mandatory area-weighted cap of 0.40 (CEC summary (opens in a new tab)). Large steel-framed or custom wood windows can miss those numbers, and the model then has to make up the difference elsewhere.
Decide it before the drawings are done
A late switch from gas to heat pumps moves equipment, electrical service and sometimes the panel size. We put the energy compliance in the 3D model with everything else and check it against every sheet before a price is fixed. Build it first.
Related: building for fire, preconstruction and are your plans ready to bid?
Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Send us the drawings. We check the energy model with the rest.
Email purchasing@amnbuild.com. Matt reads them himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated November 2026