Preconstruction for a custom home: what it is, and what you should hold at the end of it
Preconstruction is the stretch between design and the first shovel, when a builder turns drawings into a price, a schedule and a plan. Done well, it is where most of a project's money is saved. Done as a quick bid, it is where most of the change orders are born.
The short answer: preconstruction turns drawings into a checked price, a schedule and a plan before construction. Bring the builder in during design development, and do not accept a fixed price until you hold the eight items listed below.
What it is
In preconstruction, the builder reads the drawings for buildability and prices them with the trades. It plans the sequence and the schedule, and works out with the owner and the architect what is still undecided. On the South Coast it also runs alongside design review and plan check. How long each phase takes. A Montecito house may be in front of the Board of Architectural Review while the builder is pricing the design.
Architect first or builder first?
The architect first, always, because someone has to design the house. Bring the builder in while the design can still change cheaply: during design development, before the permit set is drawn. A builder who sees the drawings early can flag a detail that will cost a fortune to build, while it is still a pencil line. Design-build, design-bid-build or the builder in early.
What you should hold at the end
- A list of everything unclear in the drawings, each item with the sheet, who answers it and whether it changes the price.
- A price built from trade bids on the permitted set, not from a cost per square foot.
- An allowance schedule, each line with what it buys and a date to decide by.
- A schedule on real months, with design review, plan check and the rainy season marked.
- A sequence of work, showing which trades are on site at each step.
- A list of owner decisions, each tied to the step that needs it.
- An inspection plan: what must be ready, and whether work stops.
- The contract, with the change-order clause in plain words.
We add one more: the house itself, built as a 3D model from the full set and checked against every sheet. See what that looks like.
Value engineering, honestly
Value engineering should mean finding a cheaper way to get the same result, while the drawing can still change. Late in the job, it usually means cutting quality to rescue a budget. If the builder proposes it, ask what changes in how the house looks, lasts and performs, and get the answer in writing.
Red flags
- A fixed price offered before the structural sheets exist.
- Allowances with no description or decision date.
- No written questions about your drawings at all. Every set has some.
- A schedule with no permit or review time in it.
Related: hiring a general contractor in Santa Barbara, how to avoid change orders and what a custom home costs here.
Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Send us your plans. We will tell you what is in them.
Email the set to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.