Floors and paint, the last things you touch.
The last trades touch everything you will touch every day. Floors need layout and acclimation. Paint needs good light and patience.
- Wood floors start from a planned line so the cuts at the walls look balanced.
- Floors are usually sanded and finished late, then protected, so later trades do not scuff them.
- Paint changes color through the day. Test it on your own walls.
- Layout lineBoards are laid from the center so the cuts at both walls match.
- Expansion gapA small space at the walls, hidden by baseboard, lets wood move with the seasons.
- Staggered jointsEnd joints never line up in adjacent rows.
- TransitionWhere one floor meets another at a doorway. Decide how it looks.
In the order it happens.
- Low
- Medium
- High
Flooring sits in the house to adjust to its air, and the subfloor is checked and flattened.
Boards or planks are laid from the layout line, and wood is sanded and finished. Stay off it until the finish is dry.
Surfaces are masked, then walls get primer and two finish coats.
A final walk-through lists any touch-ups before sign-off.
The techniques that matter.
- Wood is acclimated and slab or subfloor moisture is measured first.
- The subfloor is flattened, and a gap is left at the walls so boards can move.
- Layout balances cuts at both walls and avoids narrow slivers at doors.
- Walls are primed, then get two coats, with sheen chosen by room.
Where this trade earns its fee.
- Matching sheen and color across large walls.
- Wide-plank wood, which moves with the seasons.
- Transitions between different floors at doorways.
Decide this before the trade starts.
These are the choices that decide whether the finished house matches the one in your head. Changing them later costs time and money.
- Floor species, width and finish, seen in the room’s light.
- Where floors change material, and how the transition looks.
- Paint colors tested in place, at different times of day.
- Sheen for each room, and baseboard and trim profiles.
- Where do the floor transitions fall?
- Can we paint a sample on the wall and see it all day?
- How are finished floors protected after install?
- Site work
- Foundations
- Framing
- Roofing
- Windows and exterior
- Plumbing
- Electrical
- HVAC
- Insulation
- Drywall and plaster
- Tile
- Cabinetry
- Floors and paint
General guidance, not a specification. Your drawings, your engineer and your building inspector govern every job. See the whole process · Trade secrets home
Want this explained on your own house?
Email the address. A written reading of the parcel is free, in two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.