Buying a lot or a teardown in Montecito: what to check before you sign
The price of a parcel says little about what it will cost to build on, or how long it will take. A few facts decide both, and most can be read before the purchase closes. Here is the list we work through when an owner sends us an address.
The short answer: read the parcel before you buy. Check who reviews a house there, whether it is in the Coastal Zone, the fire hazard map, creeks and drainage, the survey and easements, soils, and sewer or septic. Then ask what an existing house lets you keep. Most of it can be checked before closing.
Who reviews a house there
Montecito is unincorporated: a house there goes through County Planning and Development and the Montecito Board of Architectural Review. A Santa Barbara address may be City land, reviewed by the Single Family Design Board, or County land that only shares the mailing address. Hope Ranch adds its own association review. Read the parcel, not the address. Who permits and reviews, town by town.
Whether it is in the Coastal Zone
A parcel in the Coastal Zone needs a coastal permit for most work, and near the shoreline the decision can be appealed to the Coastal Commission. That adds months, and it can shape what you may build. How coastal review works.
Fire, creeks and drainage
Much of the foothills is mapped as a high fire hazard area, which sets how the house is built, how the fire engine reaches it and what the landscape may be. Creeks and drainage carry real weight in review here since the January 2018 debris flows. Check the fire hazard map, any creek on or beside the lot, and where water leaves the site. Building for fire.
The ground and the services
- Survey: boundaries, easements and any recorded restrictions. A shared driveway or an access easement can decide where the house sits.
- Soils: a hillside or fill lot will need a soils report (about $7,000 when one is needed), and its findings set the foundation.
- Sewer or septic: a septic system needs its own review and limits where a house and an accessory dwelling can go.
- Water and power: whether the service and meter can carry a new house, and what an upgrade costs.
What an old house lets you keep
A teardown is not always the cheaper path. An existing house may sit closer to a setback, or stand taller, than a new house would be allowed, and a full demolition can give that up. Price a remodel and a rebuild the same way before you choose. Remodel or rebuild.
Have it read before you close
Send us the address or parcel number. Within two business days, at no charge, Matt sends back a written reading: who reviews a house there, the coastal and fire questions, the site facts to confirm and an order of magnitude for what you have in mind. When a design follows, we build it as a 3D model from the full plan set and check it against every sheet before a price is fixed. Build it first.
Related: what a custom home costs here, how long a custom home takes and preconstruction, explained
Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Send us the address. We will read the parcel first.
Email purchasing@amnbuild.com with the address or parcel number. Matt reads it himself and writes back within two business days, at no charge.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated November 2026