The rough opening
Framers leave an opening a little larger than the window, typically half an inch to an inch each way, so the unit can be set plumb, level and square on shims.
Most leaks in a house start at a window or a door. This course shows the layers that make an opening watertight, every kind of window you will find on the South Coast, how glass and frames are made, and a hundred years from steel casements to fire-rated dual glazing.
The 3D scenes need WebGL, which this browser has turned off. Every word of the course is still here on the left.
A window installation is a sequence of overlapping layers, each one lapped so water runs out, never in.
Framers leave an opening a little larger than the window, typically half an inch to an inch each way, so the unit can be set plumb, level and square on shims.
Before the window goes in, the bottom of the opening gets a sloped pan of flashing membrane or metal, turned up at the back and the ends.
WhyEvery window leaks a little eventually. The pan catches that water and sends it back outside.
The barrier at the sides laps over the window’s side fins, the head flashing laps over the top fin, and the barrier above laps over the head flashing.
WhyWater runs down. Every upper layer must sit on top of the layer below it, like shingles on a roof.
Style, frame material and glass all change performance and price.
Steel casements, thin and crisp, are original to many 1920s Spanish Colonial Revival houses. Wood windows, painted or clad in aluminum outside, suit Craftsman and traditional houses.
WhyOriginal steel windows can often be restored and fitted with better seals instead of replaced.
Single-pane aluminum sliders were standard from the 1950s to the 1980s. Vinyl replaced them in many retrofits. Fiberglass is stiff, stable and paintable.
Today’s insulated glass is two panes with a sealed space between them and a low-emissivity coating that reflects heat. In a fire hazard zone, at least one pane is tempered.
WhyLow-E glass keeps summer heat out and winter heat in. It is why a new house can have big glass and still meet the energy code.
Almost all window glass is float glass: molten glass poured onto a bath of molten tin.
Sand, soda ash and limestone are melted, floated flat on molten tin, cooled slowly, coated, cut and assembled into sealed units.
Molten glass spreads across a bath of liquid tin and settles perfectly flat and parallel, then cools enough to roll out.
WhyBefore float glass, window glass was rolled or blown and had waves you can still see in old houses.
A microscopically thin metallic low-E coating is applied, then two panes are sealed around a spacer, often with argon gas between them.
The order of operations is the whole craft.
Pan the sill, set the window plumb and square on shims, fasten it to the maker’s schedule, then tape the side fins and flash the head.
The bottom fin is never sealed tight to the pan; water that reaches the pan has to drain out.
WhyA sealed bottom turns a sill pan into a bathtub inside the wall.
On important openings we water-test before the siding or stucco goes on: a spray rack or hose at the head, while someone watches inside.
Window technology changed more than almost anything else in a house.
Slim steel casements with small panes defined Spanish Colonial Revival houses. Single glazed, with putty, they leak air but last when painted.
Wood double-hung and casement windows, often with wavy glass, in Craftsman and Colonial houses.
Mill-finish aluminum sliders went into tracts and many remodels. They conduct heat and cold straight through.
California’s first Title 24 energy standards took effect in 1978 and began pushing toward double glazing.
In fire hazard zones, Chapter 7A required tempered glass in at least one pane, plus fire-resistant exterior doors.
Low-E dual glazing, thermally broken frames, large lift-and-slide doors, and installations tested for water before they are covered.
Every course ends on one building: a 710-square-foot ADU on Canon Drive in the Santa Barbara foothills, modelled from its permit set before pricing. Three gables, three floor levels, a steel canopy, and a list of questions the drawings left open. Here are sixteen openings and the questions they raised.
Frames are bronze anodized aluminum by Western Windows: Series 8670 windows and Series 7000 and 300 sliding doors. Because the lot is in the high fire area, every exterior window and glazed door is ordered with at least one tempered pane; the glazing notes cited an old code section and we flagged it.
The bedroom has no exterior door, so window 103-A is its emergency escape opening. The code needs a clear opening at least 20 inches wide and 5.7 square feet. The casement in the first set is about 1'-10" wide, which leaves about 19 inches clear: one inch short.
WhyWidening the casement to 2 feet fixes it without changing the rough opening. Submittal 3 now states 6.26 square feet clear, and the shop drawing has to show it.
Every opening gets a sloped sill pan and is lapped into the weather barrier so water that gets behind the cladding runs out, not in. The marine climate also calls for a 3/16-inch drainage gap behind the cladding.
Door 100-2 is 9'-7" wide: one panel pivots on an offset axis at the west end and two panels slide. The pivot swings into the living room, so the dining table has to clear it.
Window work is where design review, the energy code and the fire code meet.
Original steel and wood windows can often be restored. Replacement is either a full frame, opened to the studs and flashed properly, or an insert into the old frame.
WhyAn insert is quicker and cheaper; full-frame replacement is the only way to fix a leaking opening.
Every bedroom needs an emergency escape opening: a window or door that opens to at least 5.7 square feet of clear space, at least 20 inches wide and 24 inches high, with the sill no more than 44 inches above the floor. Replacement windows in old bedrooms are sized to keep or improve that opening.
WhyA smaller replacement window, or bars that do not open from inside, can turn a bedroom into a trap in a fire. Check the clear opening, not the window size.
Original steel casements can usually be saved. The sash comes out, is stripped to bare steel, rust at the bottom rail is cut out or filled, and it is primed, reglazed with new putty or glazing tape, fitted with weatherstripping and painted. Hinges and operators are freed or replaced. Thin new insulated glass can sometimes fit the old frames.
WhyRestored originals keep the thin profile that replacement windows rarely match, and design review on historic houses often asks to keep them.
On the South Coast, design review often cares about the pattern of the glass, the depth of the frame and the color. True divided lites or simulated divided lites with bars on both faces read like the originals; grilles sealed between the glass look flat from the street. Bring photos of the originals.
In a fire hazard zone, exterior doors must be noncombustible, fire-rated, or solid-core wood of a minimum thickness, and glass must be tempered.
Wide openings to a terrace are often multi-slide doors: several glass panels that slide and stack, sometimes into a pocket inside the wall. The opening needs a long header or steel beam sized by the engineer, and the sill track is set flush in a pan that drains to outside so indoor and outdoor floors can meet at one level.
WhyA flush threshold invites water. The drained pan, a slight slope outside and a covered overhang are what keep it dry.
Doors leak at the bottom. A pan with end dams and a back leg goes under every exterior door, the threshold is set in sealant along the back so water that gets in can drain out the front, and the outside surface steps down and slopes away.
WhyPatio doors facing the weather on the coast are the most common source of rotted subfloor we open up.
Ordinary annealed glass breaks into sharp shards. The code calls for safety glass where people can fall or push into it: in doors, beside doors, near tubs and showers, near stairs and low to the floor. Tempered glass crumbles into small cubes; laminated glass has a plastic layer that holds the pieces. Most new windows are insulated units, two panes and a spacer with a low-E coating.
WhyEvery tempered pane carries a small etched mark in a corner. If a replacement pane in a door has none, it is not safety glass.
A sectional door rolls up on tracks, balanced by a torsion spring above the opening. The opener lifts it, photo eyes near the floor stop and reverse it, and in California a new opener must have a battery backup so the door works in a power outage.
WhyThe spring holds the whole weight of the door. Adjusting or replacing it is a job for a garage door technician, not the homeowner.
Santa Barbara: Carriage-style wood doors that swing or look like they swing are common on Spanish Colonial Revival garages, and design review often asks for them.
A big front door that turns on a pivot rather than hinges can be very wide and heavy. The bottom pivot sits in the floor, so its pocket is blocked out before the slab is poured or the subfloor is laid, and its top pivot needs solid framing above. Because the door swings past the sill, water management at the threshold has to be designed: a sill pan, a slope away and a drained threshold.
WhyA pivot door is decided at foundation time, not at trim. The pocket is the expensive thing to add later.
Wide lift-and-slide and folding doors have no room for an ordinary screen. Retractable screens roll into a housing above the opening, by hand or by motor, and run in side tracks that hold them flat in the wind. The housing is recessed into the header so it disappears, which means the framer and the window supplier have to agree on its size before the header is built.
WhyA screen pocket added after the header is built usually ends up as a box hanging below it.
The large fixed panes and sliding panels on high-end houses can weigh hundreds of pounds each. They are set with vacuum lifters on a crane, a glazing robot or a mini-crane, never by hand, and the access route is planned with the schedule. Each unit rests on rubber setting blocks near its quarter points so its weight bears evenly and the glass never touches metal, and the frame below it drains to the outside.
WhyAsk the supplier for unit weights before the site plan is fixed. A pane that cannot be reached by a lifter cannot be installed.
A window's air, water and structural ratings were earned in a test lab, installed a specific way. Its warranty depends on the same. So the installer works from the manufacturer's printed instructions: the rough opening size, where shims go, which fasteners, how far apart and how far from the corners, what sealant and in what order. Shims go at the fastener points on the jambs, never jammed at the head, and the unit is checked for plumb, level, square and smooth operation before anything is foamed or trimmed.
WhyA window installed off the instructions can lose its rating and its warranty. Keep the sheet on site and follow it.
Every window sold in California carries an NFRC label with its ratings. The U-factor is how fast heat passes through the whole unit: lower is better. The solar heat gain coefficient is how much of the sun's heat it lets in: lower for west glass that bakes in the afternoon, higher where winter sun is welcome. Insulated glass, a low-e coating and a warm-edge spacer keep the inside pane warmer, which is also why good windows fog less: condensation forms on the coldest surface in the room.
WhyThe energy code holds the window to the numbers in the energy report. Check the label against it at delivery, before the units go in.
Most doors that stick, rattle or leak air need adjustment, not replacement. A door that drags at the top of the latch side has usually sagged on its hinges: tightening the screws, or driving one long screw through the top hinge into the framing, pulls it back. The strike is moved so the latch catches without slamming, and the weatherstripping and door sweep are adjusted until no daylight shows around the closed door.
WhyLook for daylight from inside with the door closed. Wherever light shows, air and wind-driven rain get in.
We install windows the slow way: pan, set, flash, test. It is the cheapest insurance against a rotted wall.
The AMN crew trains on the full private set for this trade: a 3D job site you walk station by station, the lesson plan, the field guide, the math and the tools. Sign-in is not needed, but these pages are kept out of search.
In California, a license is needed for any job of $1,000 or more in labor and materials, any job that needs a permit, or any job where the worker hires help. Look up the contractor’s license number at cslb.ca.gov and check it is active and carries the right class:
The install chapter as a list to walk before you call the work done. Ticks stay in this browser only. Prints on one page.
Windows, doors and weatherproofing · Job: ________________ · Date: __________ · Checked by: ________________
The same drill our crew uses: give the answer in two sentences before you open each one. If you can only name the thing, read that chapter again.
Every window leaks a little eventually. The pan catches that water and sends it back outside.
From chapter: An opening, layer by layer
Low-E glass keeps summer heat out and winter heat in. It is why a new house can have big glass and still meet the energy code.
From chapter: Windows and doors
Widening the casement to 2 feet fixes it without changing the rough opening. Submittal 3 now states 6.26 square feet clear, and the shop drawing has to show it.
From chapter: A real ADU
A flush threshold invites water. The drained pan, a slight slope outside and a covered overhang are what keep it dry.
From chapter: Your house
The spring holds the whole weight of the door. Adjusting or replacing it is a job for a garage door technician, not the homeowner.
From chapter: Your house
Ask the supplier for unit weights before the site plan is fixed. A pane that cannot be reached by a lifter cannot be installed.
From chapter: Your house
18 terms in plain English, with the Spanish our crew uses. All 249 words across the school are on one page.
Often restore. Original steel casements on Spanish Colonial Revival houses can be stripped, repaired, reglazed and weatherstripped. Replacement makes sense when frames are badly rusted or the energy goals require it.
A sloped tray of flashing at the bottom of a window or door opening that catches any water that gets past the window and directs it back outside.
In wildland-urban interface areas, windows need insulated glass with at least one tempered pane, or a fire-rated assembly. Exterior doors have their own requirements.
Sometimes. In historic districts, for landmarks and for visible changes in Montecito, window changes may go to design review. We check the parcel first.
The floor pivot. Its pocket is blocked out before the slab is poured or the subfloor is laid, the top pivot needs solid framing above, and the threshold needs a sill pan and a drained sill because the door swings past it.
Rules change with each code cycle, and the plans, the inspector, the adopted code and the maker’s instructions overrule any course. Code references are to the 2025 California Building Standards Code (Title 24), in force since 1 January 2026; check the local amendments of the city or county. This page was checked against these on 18 November 2026: