AMN Construction

Trade School · course 10 of 28

Roofing. Red tile, and everything under it.

The red clay tile roof is the signature of Santa Barbara, but the tile is not what keeps the rain out; the layers under it are. This course takes a tile roof apart, fires a tile, compares every roof type you will see on the South Coast, and walks a hundred years from wood shingles to fire-rated Class A assemblies.

7 chapters36 3D scenes10 min readSanta Barbara South CoastChecked 19 Nov 2026

The 3D scenes need WebGL, which this browser has turned off. Every word of the course is still here on the left.

Chapter 1 of 7

Inside a clay tile roof.

From the rafters up, a tile roof is a deck, a waterproof layer, a way to hang the tile, and the tile itself.

Four layers above the rafters

Rafters carry the roof. A plywood deck spans them. Underlayment covers the deck. Battens or fasteners hold the tile, which sheds most of the water and protects the underlayment from sun.

The underlayment is the roof

Tile is a rain screen, not a waterproof skin: wind-driven rain gets under it. The underlayment below is what actually keeps the house dry, which is why it is the part that ages out first.

WhyA tile can last a century. The felt under a 1960s tile roof usually cannot.

Pans and caps

Traditional two-piece mission tile has concave pans laid in rows with convex caps over the joints between them. S-tile combines the pan and the cap in one piece.

Santa Barbara: Two-piece clay tile is what design review in El Pueblo Viejo and much of Montecito expects to see on a Spanish Colonial Revival house.

Chapter 2 of 7

Every roof you will see on the South Coast.

Roofing is chosen by style, slope, budget and, more and more, by fire rating.

Clay and concrete tile

Clay tile is fired earthenware: heavy, fireproof and colorfast. Concrete tile, common from the 1960s, is cheaper and heavier, and its color is a surface coat that weathers.

Asphalt shingle and metal

Asphalt shingles are a fiberglass mat soaked in asphalt and coated in granules, typical on ranch houses. Standing-seam metal panels run eave to ridge with raised, locked seams.

Wood shake and slate

Untreated wood shakes burn readily and are restricted in fire hazard zones. Slate lasts a century and is rare on the South Coast.

WhyIn very high fire hazard severity zones, California requires a Class A roof assembly, which untreated wood cannot meet.

Flat roofs

Decks and low-slope roofs over flat-roofed Spanish and modern houses use membranes, built-up, modified bitumen or single-ply, sloped to drains and scuppers.

Chapter 3 of 7

From clay pit to a fired tile.

Clay tile is made the way brick is: dug, ground, formed, dried, and fired.

Seven stations

Clay is dug, ground and tempered with water, extruded or pressed into shape, cut, dried slowly, fired in a kiln, then sorted.

Dry slowly, fire hot

Green tile shrinks as it dries and cracks if dried too fast. Firing in a tunnel kiln, often well above 1,000 °C, vitrifies the clay and sets the color.

WhyColor depends on the clay’s iron and on the firing. Blended tile mixes batches for the varied look of an old roof.

Handmade tile

Historic tile was formed by hand over a curved mold, so each one tapers. Handmade and hand-shaped reproduction tile is still specified on landmark houses.

Chapter 4 of 7

Roofed right: it is all in the flashing.

Roofs leak at edges and holes: walls, valleys, chimneys, skylights and vents.

Lap like shingles

Every layer laps the one below it so water always runs over a seam, never into it. Underlayment starts at the eave and works up.

Flashing

Where the roof meets a wall, a chimney or a skylight, metal flashing steps water out onto the roof. It is tucked behind the wall’s water barrier, not caulked to its face.

WhyCaulk is maintenance. Lapped metal is design.

Fasten every tile

Tile is nailed, wired or clipped to resist wind and earthquakes, and mortar or foam at ridges is done to the manufacturer’s instructions.

Chapter 5 of 7

A hundred years of South Coast roofs.

Style set the first half of the century; fire set the second.

1920s: clay tile returns

After the 1925 earthquake, rebuilding in the Spanish Colonial Revival style put handmade-looking clay tile on houses, shops and the new courthouse.

1950s: wood shingles and shakes

Ranch houses and post-war tracts often got wood shingles and shakes: cheap and handsome, and dangerous in a wildfire.

1960s: concrete tile

Concrete tile offered the tile look for less. Many have since lost their color coat and cracked under foot traffic.

1980s: the composition shingle

Fiberglass asphalt shingles took over most re-roofs on simpler houses.

2008: wildfire rules

California’s wildland-urban interface building standards (Chapter 7A) took effect in 2008, requiring fire-resistant roofs, vents, eaves and decks in fire hazard zones.

Santa Barbara: The Tea Fire (2008), Jesusita Fire (2009) and Thomas Fire (2017) all burned into South Coast neighborhoods.

Today

Class A tile and metal roofs, synthetic underlayments, ember-resistant vents, and roofs designed to carry solar panels.

Chapter 6 of 7

The same trade, on a real ADU.

Every course ends on one building: a 710-square-foot ADU on Canon Drive in the Santa Barbara foothills, modelled from its permit set before pricing. Three gables, three floor levels, a steel canopy, and a list of questions the drawings left open. Here is a clay tile roof in a high fire area.

Clay tile, Class A

The roof is Verea flat clay tile, smooth, in a slate color, on three 7:12 gables. In the high fire area it must be a Class A assembly, with a cap sheet under the tile and the eave closed so embers cannot get under the first course.

Underlayment and flashing

Before tile, underlayment goes on with valley, trough and step flashing at the two valleys and at the step in the roof at grid C. The roof jacks for vents and fans are set before tile, not cut in after.

Rain chains and downspout sleeves

Gutters drain to four rain chains on the north side. Over the patio, the canopy drains into steel columns that act as downspout sleeves. The stormwater plan, SW1, came with Submittal 3; four things on it do not agree, so the underground drainage is carried as an allowance.

Eaves and vents

Every vent must be ember-resistant or screened with 1/8-inch metal mesh, and eave undersides must be noncombustible or ignition-resistant. No eave or vent detail was in the set, so we asked for one before pricing.

Chapter 7 of 7

What it means for your roof.

Most tile roofs here are re-roofed by lifting the tile, replacing what is under it, and laying the same tile back.

Lift and relay

When an old tile roof leaks, the usual fix is to remove the tile, replace the underlayment, flashing and battens, then relay the original tile with matched replacements.

WhyOld clay tile is often worth saving, and design review likes it kept.

Gutters and flashing

Many leaks blamed on tile are at walls, chimneys and gutters. Copper gutters and flashing last on the coast where thin steel rusts. The Cannon Drive ADU has no chimney or flue: it heats and cools with a heat pump.

Flat roofs and parapets

A flat roof is never quite flat: the framing slopes at least a quarter inch per foot to scuppers or drains, with an overflow for when one clogs. Crickets, small sloped humps, send water around equipment curbs and chimneys. The membrane runs up every parapet wall and under its cap, because parapet tops are where Spanish-style flat roofs most often leak.

WhyPonding water shortens a membrane's life. Low spots are fixed in the framing, not with extra coats.

Valleys carry the most water

Where two roof slopes meet, the valley collects the water from both. A self-adhered membrane goes down the valley first, then an open metal valley, often copper on tile roofs, with a center rib that stops water from one side jumping to the other. The tile is cut back along each edge so water runs in the metal, not under the tile.

WhyLeaves and debris pile up in valleys. Keeping them clear is the cheapest roof maintenance there is.

Skylights that stay dry

A skylight sits on a curb that lifts the glass above the water running down the roof. Underlayment turns up the curb, step flashing climbs each side, the head flashing tucks under the roofing above, and the sill apron laps over the roofing below, so every piece sheds water onto the next.

WhyMost leaking skylights were flashed against the flow at the head. Factory flashing kits for the roof type are worth their cost.

Copper gutters and sheet metal

On tile roofs here, gutters are often half-round copper: hung from hangers every 24 to 30 inches, sloped to an outlet, soldered at the seams, and drained by round downspouts strapped to the wall into a drain line that carries water away from the foundation. The same sheet-metal shop makes flashing, chimney caps and scuppers.

WhyCopper next to steel or aluminum corrodes the other metal. Fasteners, straps and flashing that touch copper are copper or stainless.

Santa Barbara: Copper weathers from bright to brown to green over years; design review often prefers it to painted aluminum on historic houses.

Fire zones and solar

In a fire hazard zone, re-roofing triggers Class A and vent requirements. If solar is coming, plan the attachment flashing with the roof, not after it.

Eaves: where embers get in

The open curved ends of clay tile at the eave let in birds and wind-blown embers. A bird stop closes them, the eave below is boxed in noncombustible material in fire zones, and any eave vent is a listed ember-resistant type. The same applies at the ridge and at gable ends.

WhyMany houses lost in wildfires burned from embers that entered the attic through the eaves, not from the fire front.

Slate roofs

A slate roof can outlast the house when it is laid right: each slate is hung on two copper nails, set just snug so the slate hangs free, and lapped so that every nail hole is covered by two courses above. The flashing has to last as long, so it is copper. A slate breaks under a boot, so a slater walks on hooks and ladders, and replaces a broken slate with a copper hook or a strap.

WhyA slate roof that fails early almost always failed at the nails or the flashing, not the stone.

Santa Barbara: Slate is heavy. On an older Montecito house the frame is checked before a tile or shingle roof is replaced with it.

Standing seam: copper and zinc

A standing-seam roof is long metal pans joined by raised seams folded together on the roof. Clips hidden in the seams hold the pans down but let them slide, because a long pan grows and shrinks every day in the sun. No screw goes through the face. Copper weathers to brown and then green; zinc to a soft grey. Water that runs off copper corrodes zinc and galvanized steel, so the two are never mixed on one roof.

WhyMost metal roof leaks are at a screw or a seam that could not move. The clip is the detail that matters.

Dry in by dark

A roof replacement is the one time the house is open to the sky. The rule is simple: tear off only as much as the crew can cover with underlayment the same day. Before starting, check the forecast for rain and wind, keep tarps and weights on site, and assign one person at the end of each day to walk the roof and confirm every opening, vent and edge is sealed. Rain on an open roof is not a roofing problem; it is a drywall, insulation and flooring problem.

WhyOne storm on an open roof can cost more than the roof. Plan tear-off in sections and never leave a section open overnight.

Santa Barbara: Winter storms on the South Coast come in with little warning off the ocean; roofs are best replaced in the dry months.

Walking on tile

Clay tile is strong in the right places and brittle in the wrong ones. Anyone who must go onto a tile roof, a solar installer, a painter, a chimney sweep, steps only where two tiles overlap, low on the tile and over the batten or nailer, with weight spread across both feet. In work areas the crew lays boards or pads across the tiles. Cracked tiles from foot traffic often do not show until the next winter, when the leak appears under them.

WhyMost broken tiles on a finished house were broken by the trades after the roofer left. Set the rule for every trade that goes up.

Crickets behind chimneys

Water running down a roof piles up against the uphill side of a chimney, skylight or wide curb, and sits there. A cricket, or saddle, is a small peaked roof built on the uphill side that splits the flow and sends it around. The code asks for one behind any chimney more than thirty inches wide, and good roofers add one behind any wide penetration. It is framed, sheathed, waterproofed and flashed like the rest of the roof, and it is where many old chimney leaks start.

WhyIf a chimney leaks only in heavy rain, look at the uphill side first. A missing cricket is a common cause.

After the film

Use it on a real house.

On your house

Re-roofing a tile house is usually a lift-and-relay job, and the right time to add insulation, vents and solar attachments.

For our crew

The AMN crew trains on the full private set for this trade: a 3D job site you walk station by station, the lesson plan, the field guide, the math and the tools. Sign-in is not needed, but these pages are kept out of search.

Trades in this course

  • Roofing (tile) · C-39
  • Roofing (shingle and metal) · C-39
  • Sheet metal and copper · C-43

All 100 trades

Before you hire

In California, a license is needed for any job of $1,000 or more in labor and materials, any job that needs a permit, or any job where the worker hires help. Look up the contractor’s license number at cslb.ca.gov and check it is active and carries the right class:

  • Roofing (tile): CSLB class C-39
  • Sheet metal and copper: CSLB class C-43

On the job: the install checklist.

The install chapter as a list to walk before you call the work done. Ticks stay in this browser only. Prints on one page.

Roofing · Job: ________________ · Date: __________ · Checked by: ________________

Check yourself. Out loud.

The same drill our crew uses: give the answer in two sentences before you open each one. If you can only name the thing, read that chapter again.

01 The underlayment is the roofSay why it matters, then open

A tile can last a century. The felt under a 1960s tile roof usually cannot.

From chapter: Inside a tile roof

02 Dry slowly, fire hotSay why it matters, then open

Color depends on the clay’s iron and on the firing. Blended tile mixes batches for the varied look of an old roof.

From chapter: How tile is made

03 Flat roofs and parapetsSay why it matters, then open

Ponding water shortens a membrane's life. Low spots are fixed in the framing, not with extra coats.

From chapter: Your house

04 Skylights that stay drySay why it matters, then open

Most leaking skylights were flashed against the flow at the head. Factory flashing kits for the roof type are worth their cost.

From chapter: Your house

05 Slate roofsSay why it matters, then open

A slate roof that fails early almost always failed at the nails or the flashing, not the stone.

From chapter: Your house

06 Dry in by darkSay why it matters, then open

One storm on an open roof can cost more than the roof. Plan tear-off in sections and never leave a section open overnight.

From chapter: Your house

Words in this course.

13 terms in plain English, with the Spanish our crew uses. All 249 words across the school are on one page.

Cricket Contrapendiente
A small peaked hump on a roof that sends water around a chimney.
Eave Alero
The low edge of a roof that hangs over the wall.
Flashing Tapajuntas
Thin metal or membrane that steers water away from a joint, such as around a window.
Gable Hastial
The triangle of wall under the two slopes of a roof.
Headlap Traslape superior
How far a slate or tile covers the course two rows below it.
Parapet Pretil
A low wall that sticks up above the edge of a roof.
Rafter Cabio
A sloped beam that holds up the roof.
Ridge Cumbrera
The top line of a roof.
Scupper Gárgola de desagüe
A hole in a parapet that lets water drain off a flat roof.
Section Sección
A drawing of a building or part as if sliced through.
Spanish Colonial Revival Spanish Colonial Revival
The white-plaster, red-tile style that defines Santa Barbara, built mostly 1915 to 1930.
Standing seam Junta alzada
A metal roof whose pans join in raised, folded seams.
Valley Lima hoya
A sloped inside corner of a roof, where water collects.

Questions people ask.

How long does a clay tile roof last in Santa Barbara?

The clay tile itself can last a century or more. The underlayment beneath it typically needs replacing much sooner, so most old tile roofs are lifted, re-underlaid and relaid with the original tile.

Do I need a Class A roof in Montecito?

Much of Montecito and the South Coast foothills is in a fire hazard severity zone, where California requires Class A roof assemblies and ember-resistant construction. Clay tile and most metal roofs can meet it.

What is the difference between clay and concrete roof tile?

Clay tile is fired clay; its color goes all the way through and it does not fade. Concrete tile is cement and sand with a colored surface that can weather away. Both are heavy.

Why does my tile roof leak if the tiles are fine?

Because the tile is not the waterproof layer. The underlayment and flashing under it are, and they wear out first.

How long does a slate roof last?

A slate roof can outlast the house when it is laid right: two copper nails per slate, set just snug, with enough headlap that every nail hole is covered, and copper flashing that lasts as long as the stone. Early failures are almost always nails or flashing, not slate.

Can copper and zinc be used on the same roof?

No. Water that runs off copper corrodes zinc and galvanized steel, so the two are never mixed where one drains onto the other.

Sources and checks

Rules change with each code cycle, and the plans, the inspector, the adopted code and the maker’s instructions overrule any course. Code references are to the 2025 California Building Standards Code (Title 24), in force since 1 January 2026; check the local amendments of the city or county. This page was checked against these on 18 November 2026:

  • California Residential Code R905 (requirements for roof coverings; clay and concrete tile R905.3), R903 (flashing), R337 (wildfire-urban interface)
  • California Building Code Chapter 7A (materials and construction methods for exterior wildfire exposure; effective 2008)
  • Tile Roofing Industry Alliance installation manual
  • SAH Archipedia and Santa Barbara County Courthouse history (post-1925 Spanish Colonial Revival rebuilding)
  • CAL FIRE incident records: Tea Fire (2008), Jesusita Fire (2009), Thomas Fire (2017)
  • AMN crew field guide: Roofing
  • International and California Residential Code R903.2.2, crickets behind chimneys wider than 30 inches

Ask about your house

Matt Newman · 805 886 0988 · purchasing@amnbuild.com