A sandwich
From the back: a protective backsheet, a clear encapsulant, a layer of silicon cells, more encapsulant, tempered glass, and an aluminum frame around the edge.
A California house built today makes some of its own electricity, may store it, and probably charges a car. This course opens a solar panel cell by cell, follows silicon from sand to module, shows how panels, inverters, batteries and chargers connect to the panel, and walks the rules from the first rooftop systems to net billing.
The 3D scenes need WebGL, which this browser has turned off. Every word of the course is still here on the left.
A solar panel is a sandwich built to survive thirty years of sun, rain and salt air.
From the back: a protective backsheet, a clear encapsulant, a layer of silicon cells, more encapsulant, tempered glass, and an aluminum frame around the edge.
Each cell is a thin silicon wafer. Light knocks electrons loose; the cell’s layers push them one way, making direct current. Cells are wired in strings to build up voltage.
WhyShade on a few cells can drag down a whole string, which is why panel layout and optimizers matter.
Tempered glass takes hail and heat; the frame bolts to the racking and is grounded.
A home system is more than panels on the roof.
Panels make direct current; the house uses alternating current. Microinverters convert at each panel; a string inverter converts for many panels at once, sometimes with optimizers at each panel.
The electrical code requires rooftop solar to de-energize quickly when the system is shut down, so firefighters are not facing live conductors on the roof.
Lithium iron phosphate (LFP) batteries store midday solar for evening use and keep chosen circuits running in an outage. They are installed to fire and electrical rules on location and clearances.
Everything lands at the main electrical panel, which may need upgrading. A Level 2 EV charger runs on a dedicated 240-volt circuit.
Solar-grade silicon is purified to extraordinary levels before it is sliced into wafers.
Quartz is refined into ultra-pure polysilicon, melted and grown into ingots, sliced into wafers thinner than a fingernail, made into cells, laminated into modules and tested under a flash of simulated sunlight.
Each finished module is flashed with a calibrated light and its output measured; that is where the wattage on the label comes from.
The roof is the part that has to outlast the panels.
Every bolt through the roof gets a flashed mount designed for that roof type. On clay tile, tiles are replaced with flashed tile hooks or flat replacement tiles.
WhyA leaking solar attachment can rot a rafter for years before a stain shows.
Fire code pathways keep clear strips at ridges and edges so firefighters can work on the roof.
Systems are permitted and inspected by the City or County, then approved for interconnection by Southern California Edison before they are turned on.
Solar went from experiment to code requirement within one working lifetime.
The energy crises of the 1970s brought rooftop solar water heaters and the first state incentives.
Falling panel prices and state programs put photovoltaic systems on many homes.
From 1 January 2020, California’s energy code required solar on most new single-family homes.
In April 2023 new customers of the large utilities, including Southern California Edison, moved to net billing, which pays less for exported power and makes batteries more valuable.
The 2025 Energy Code adds battery-ready requirements for new homes; solar, storage and EV charging are planned with the electrical service from the start.
Every course ends on one building: a 710-square-foot ADU on Canon Drive in the Santa Barbara foothills, modelled from its permit set before pricing. Three gables, three floor levels, a steel canopy, and a list of questions the drawings left open. Here is how the energy code reaches a new ADU.
Under the Energy Code a new detached ADU counts as a newly constructed building, so it carries the solar requirement unless an exception applies. The energy report came with Submittal 3, and the system is sized from it.
Under the 2022 code, new modules added to an existing system on the same lot can meet the ADU's requirement. On this lot the west-facing slope of the primary gable is one place panels could go; the main house roof may be better.
With heat pumps for heating, cooling and hot water and an electric range, the ADU has no gas line at all. The panel and the feeder are sized for that from the start.
Solar is a roof project and an electrical project at once.
If the roof is near the end of its life, re-roof before solar goes on; removing and reinstalling panels later is expensive.
On clay or concrete tile, panels mount to tile hooks: a tile is lifted, the hook is screwed into a rafter and flashed to the deck, and the tile is notched or replaced with a flashed mount so it sits back down around the hook. Rails ride above the tile. No hole goes through a tile face.
WhyMost solar roof leaks on tile come from broken tiles or unflashed hooks. Spare matching tiles are set aside before work starts.
Solar, a battery and an EV charger all connect at the main panel, which on older houses may need an upgrade coordinated with Edison. The Cannon Drive ADU takes its power as a feeder from the main house; the feeder route and panel size are still open questions on its plans. The Cannon Drive ADU's plans carry solar, and the 2025 Energy Code adds battery readiness for new homes.
Home batteries go in a garage, on an outside wall or in a utility room, not in bedrooms or living spaces. The fire code limits how much storage goes in one spot, keeps units a set distance from doors and windows, and asks for protection where cars could hit them. A gateway and disconnect sit nearby.
WhyClearances can decide whether a battery fits at all on a narrow side yard. Check the spot before the battery is ordered.
When the grid goes down, as it does in South Coast fire weather shutoffs, a house can run on a standby generator or a battery. Either one feeds a critical-loads panel through a transfer switch or gateway that keeps the house from back-feeding the utility lines. A generator sits on a pad, clear of windows and doors because of exhaust; a battery switches over in a fraction of a second.
WhyBack-feeding through a cord plugged into a dryer outlet can electrocute a lineworker. A listed transfer switch, installed under permit, is the only safe way.
Visible panels, especially on historic houses or in design-review areas, may need placement or color choices that keep the roofline quiet.
A standing-seam metal roof is the easiest roof to put solar on without a single hole. Clamps made for the seam profile grip the raised seams with set screws; rails or the panels themselves fasten to the clamps, and everything is bonded to ground. The clamp must match the seam shape and the metal: copper and zinc roofs need compatible clamp material, and the panel layout still keeps the fire department's roof pathways clear.
WhyChoosing a seamed metal roof and solar together saves the flashing at every attachment, the place tile and shingle solar most often leaks.
Solar panels in a string share current, so a panel in shade, from a chimney, a vent stack or a tree, can pull down the output of every panel wired with it. Module-level electronics, optimizers or microinverters, limit the loss to the shaded panel. The design starts with a shade study across the whole year, accounting for trees that will grow, and panels are kept out of the shadow of chimneys and parapets entirely where possible.
WhyAn eight-foot oak today is a twenty-foot oak in ten years. Put trees in the shade study.
A solar system that passes the building inspection is not yet allowed to run. The utility has to approve the interconnection and issue permission to operate, and turning a grid-tied system on before that can break the interconnection agreement. After it is on, the monitoring is the warranty's early-warning system: a string that produces less than its neighbors, an inverter that drops offline. Someone should look at the first month of data and set alerts.
WhyOwners switch systems on early because the panels look finished. Tell them, in writing, to wait for the utility's notice.
Santa Barbara: On the South Coast interconnection is with Southern California Edison.
Car charging is a continuous load, running for hours at full current, so the electrical code sizes its circuit at 125 percent of what the charger draws: a charger set for 32 amps needs a 40-amp circuit, a 48-amp charger a 60-amp circuit. Many chargers can be set lower, and load-management devices can share capacity with the rest of the house, which can avoid a service upgrade. The load calculation decides which.
WhyInstall the circuit for the car the owner will have in five years, but set the charger to what the panel can carry today.
We plan solar, storage and charging with the roof and the electrical service, so the pieces fit the first time.
Solar and storage are new to the school. The electrical job site covers the panel, grounding and circuits every system connects to.
In California, a license is needed for any job of $1,000 or more in labor and materials, any job that needs a permit, or any job where the worker hires help. Look up the contractor’s license number at cslb.ca.gov and check it is active and carries the right class:
The install chapter as a list to walk before you call the work done. Ticks stay in this browser only. Prints on one page.
Solar, batteries and EV · Job: ________________ · Date: __________ · Checked by: ________________
The same drill our crew uses: give the answer in two sentences before you open each one. If you can only name the thing, read that chapter again.
Shade on a few cells can drag down a whole string, which is why panel layout and optimizers matter.
From chapter: Inside a panel
A leaking solar attachment can rot a rafter for years before a stain shows.
From chapter: Installed right
Clearances can decide whether a battery fits at all on a narrow side yard. Check the spot before the battery is ordered.
From chapter: Your house
Back-feeding through a cord plugged into a dryer outlet can electrocute a lineworker. A listed transfer switch, installed under permit, is the only safe way.
From chapter: Your house
An eight-foot oak today is a twenty-foot oak in ten years. Put trees in the shade study.
From chapter: Your house
Owners switch systems on early because the panels look finished. Tell them, in writing, to wait for the utility's notice.
From chapter: Your house
9 terms in plain English, with the Spanish our crew uses. All 249 words across the school are on one page.
Yes, for most new single-family homes since 1 January 2020, with exceptions. The 2025 Energy Code also adds battery-ready requirements.
Since net billing began in April 2023, exported solar earns less, so storing it for evening use is worth more, and a battery also provides backup in outages. The numbers depend on your use and your rate.
Yes, with tile-specific flashed mounts or replacement flat tiles. It takes a careful installer; broken tiles and poorly flashed hooks are common leak sources.
Sometimes. A load calculation shows whether the existing service can support a Level 2 charger; load-management devices can avoid an upgrade.
Not until the utility issues permission to operate. On the South Coast that is Southern California Edison.
Yes. Clamps made for the seam profile grip the raised seams, and the rails or panels fasten to the clamps, so nothing penetrates the roof. The clamp has to match the seam shape and the metal.
Rules change with each code cycle, and the plans, the inspector, the adopted code and the maker’s instructions overrule any course. Code references are to the 2025 California Building Standards Code (Title 24), in force since 1 January 2026; check the local amendments of the city or county. This page was checked against these on 18 November 2026: