The numbers from every station on every job site: slopes, clearances, spacings, temperatures, counts. Search it, filter by trade, print it for the truck.

Numbers marked “check” or “verify” come from one maker’s sheet or a code viewer, not the adopted code book. Confirm on your plans and with your inspector.

Site and excavation

Call 811, read the marks See it on the job site

2 working days
minimum notice; the call day does not count (Mon call, Wed dig)
14 days
most calendar days ahead you may call
28 days
ticket life; marks good while visible and the ticket is valid
24 in
tolerance zone on each side of a mark: hand dig or vacuum inside it
White
your proposed excavation; yellow gas, red electric, orange comms, blue water, green sewer (APWA code)

Shoot grade, set stakes See it on the job site

HI = BM + rod
height of instrument; every elevation is HI minus the rod reading
Bigger reading = lower ground
reading above the target means fill, below means cut
0.45 ft = 5 3/8 in
convert tenths to inches before you tell the operator
Every morning
check the laser on the benchmark, and after any bump

Erosion control before grading See it on the job site

6 in × 6 in
silt fence trench (CA BMP Handbook SE-1)
6 ft max
silt fence post spacing (SE-1)
Ends uphill
so water cannot run around the fence (SE-1)
≤ 4 ft
fiber roll stake spacing; trench 1/4–1/3 of the roll (CASQA SE-5)
10 ft / 20 ft
max row spacing on 2:1 or steeper / on 4:1 (SE-5)
72 h · 24 h · 96 h
pre-storm, during storm, after 0.5 in rain (Risk Level 2–3)

Dig the trench, place the spoil See it on the job site

2 ft
minimum setback for spoil, tools and equipment from the edge (Cal/OSHA 1541(j)(2))
L × W × D ÷ 27
bank cubic yards: 60 × 2 × 4 ft = 17.8 cu yd
× 1.25
loose volume in the truck (swell is a practice value, check)
10 ft
boom-type lifting equipment clearance from lines up to 50 kV (Cal/OSHA 2946; ask your lead)
Spotter
required warning when the operator cannot see the edge (1541(f))

Read the soil, set the slope See it on the job site

A 3/4:1 · B 1:1 · C 1.5:1
steepest slope by soil type: about 53°, 45° and 34° (guide section 5)
1.5:1
use this when the soil is not classified
> 0.5 and < 1.5 tsf
Type B unconfined compressive strength; Type A is 1.5 tsf or more, Type C 0.5 or less (Cal/OSHA 1541.1 App. A)
Run = ratio × depth
6 ft deep: A 4.5 ft, B 6 ft, C 9 ft
Cracks, slumping, bulging, pebbles
warning signs: stop, back everyone out, cut back flatter

Protect the trench: 5 ft rule See it on the job site

5 ft
protective system required (shield, shoring or sloping); under 5 ft only if the competent person finds no sign of cave-in
4 ft
ladder, stair or ramp; 25 ft max travel to it
1.5:1 (34°)
default slope for unclassified soil; Type A 3/4:1, B 1:1, C 1.5:1
19.5 %
oxygen below this is deficient; flammables must stay under 20 % LEL
2 ft
max dig below the shield, only if rated for full depth (1541.1(g)(2))
Permit
Cal/OSHA excavation permit for 5 ft or deeper that a person enters

Pipe, bedding and backfill See it on the job site

L × grade %
fall: 28 ft × 2 % = 0.56 ft; 80 ft × 1 % = 0.8 ft
5 ft · 4 ft
protection and ladder triggers; this trench is under both
No rocks
clean bedding, nothing sharp against the pipe
Inspect first
get the inspection before any backfill
Clean backfill
no organics, debris, cobbles or boulders (CBC 1804.3 for foundation backfill)

Compact in lifts, test each lift See it on the job site

95 % × 125 = 118.75 pcf
dry density the test must reach for a 95 % spec on 125 pcf max
ASTM D1557
the lab test that sets max dry density
ASTM D6938
nuclear gauge field test; licensed operator only
5 in Class II at 95 %
Montecito Fire access road base
Moisture
too wet pumps, too dry will not pack

Final grade and drainage See it on the job site

5 % for 10 ft
ground away from the foundation: 6 in drop (CBC 1804.4 via guide)
2 %
swales and paved areas within 10 ft of the building
Fabric + clean rock
keeps fines out of a perforated drain
Steady fall
to a free outlet; no low spots, no discharge toward neighbors

Inspector walk: ready to enter? See it on the job site

2 ft
spoil, tools and machines back from the edge (1541(j)(2))
Inside the shield
work only inside the box; no one in the open end
4 ft · 25 ft
ladder, stair or ramp at 4 ft deep; 25 ft max travel (1541(c)(2))
No standing water
no entry where water is collecting unless it is controlled (1541(h)(1))

Foundations and concrete

811, batter boards and string lines See it on the job site

2 working days
811 notice in California; the day you call does not count. The ticket lasts 28 days (guide §5)
about 5 ft
batter boards set back outside the corners; boards 4 to 5 ft long (guide §8, Quikrete)
20 x 16 ft
ADU footprint used here, from the plan
18 in
string height above grade here, so depth checks are easy math

Square it: 3-4-5 and diagonals See it on the job site

6-8-10
same triangle as 3-4-5, more accurate (guide §8)
25' 7 3/8"
both diagonals of a 20 x 16 ft rectangle: √(20² + 16²) = 25.61 ft
equal diagonals
proves square only after the sides are the right length

Dig the footings to depth See it on the job site

12 in min
exterior footings at least 12 in below undisturbed ground (CRC R403.1.4); plans and soils report can require more
12 x 24 in
footing size in one SoCal city handout (guide §8); your plans govern
2 ft
minimum setback for spoil and materials from the trench edge (OSHA, guide §2)
5 ft
trench depth that needs a protective system unless solid rock (OSHA 1926.652). Cal/OSHA permit at 5 ft if workers enter (8 CCR 341)

Compact the subgrade, place base rock See it on the job site

95%
typical structural fill target, of modified Proctor (guide §5); your soils report sets the real number
4 in
clean 1/2 in or larger aggregate under a house slab (CALGreen 4.505.2.1)
minutes vs 4-6 h
nuclear gauge vs sand cone test time (guide §5)

Set and brace the edge forms See it on the job site

2 to 4 ft
stake spacing, closer at corners (guide §8, practice)
below the top
stakes stop under the form top so the screed is not blocked
150 psf per ft
full liquid pressure of normal concrete; why forms get braced (guide §8, ACI 347 summary)
2x8 = 7 1/4 in
actual depth of the edge board used here; a 2x4 is only 3 1/2 in

Vapor retarder and rebar on chairs See it on the job site

3 in
cover where concrete is cast against earth (ACI 318-19 Table 20.5.1.3.1; CRC R403.1.3.5.3)
40 d b
common field lap: #4 ≈ 20 in, #5 ≈ 25 in. The engineer's schedule governs
#4 @ 18 in E.W.
slab steel in one SoCal handout (guide §9); your plans govern
6 in lap, taped
vapor retarder seams (NRMCA CIP 29 via guide §5)
3 to 4 ft
common chair spacing each way (practice)

Anchor bolts, hold-downs, inspection See it on the job site

1/2 in, 6 ft, 7 in, 12 in
anchor bolt minimum size, max spacing, min embed, max from plate ends (CRC R403.1.6, guide §13)
2 3/4 in
bolt center from the edge for a 2x6 sill
before the pour
hold-downs and bolts set with templates; not stabbed in wet (guide §13)
hold point
footing and slab steel, sleeves and embeds signed off before concrete (guide §9; CRC R109.1.1)

Take off the yards and order See it on the job site

27 cu ft
in one cubic yard (3 x 3 x 3 ft); a yard weighs about 4,050 lb (guide §6, PCA)
5 to 10%
waste to add, the high end for trench footings (guide §6); NRMCA says 4 to 10%
L x W x (in ÷ 12) ÷ 27
slab yards; inches to feet first
about 10 yd
what a standard drum truck carries (guide §6, practice); a small last load can carry a short-load fee: ask the plant

The pour: ticket, slump, place, screed, float See it on the job site

90 min
batch to end of discharge, or 300 drum turns (ASTM C94 via guide §7)
4 in
slump ordered here; 3 to 5 in for most work (NRMCA)
1 gal / yd ≈ 1 in
slump added by water, and lost strength with it. Use a plasticizer instead (guide §7)
5 to 15 s
vibrator time per insertion (ACI 309 via guide §10)
8 to 12 yd
what one loaded truck carries; it weighs about 80,000 lb (NRMCA)

Finish, joint, cure, strip See it on the job site

1/8 to 1/4 in
thumb or boot print that says the slab is ready to finish (NRMCA CIP 14)
11 x 11 ft
joint panels here: a 4 in slab gets joints 8 to 12 ft apart, never over 15 ft (PCA CIP 6)
1 in deep
saw cut for a 4 in slab (1/4 of depth)
7 days
typical curing period or until 70% of strength (ACI 301/308.1 default via guide §12)
about 24 h
strip side forms in moderate temperatures (guide §12, check against the engineer)

Inspector walk: the pool house slab See it on the job site

8 to 12 ft
joint spacing for a 4 in slab, never over 15 ft (PCA CIP 6, guide §8)
1/4 of the depth
saw-cut joint depth, never less than 1 in (PCA CIP 6)
≤ 12 in · ≤ 6 ft
anchor bolt from each plate end, and bolt to bolt (CRC R403.1.6, guide §13)
spade the edges
consolidate along forms so edges come out clean (PCA CIP 14, guide §10)

Framing

Ladder and fall protection See it on the job site

6 ft
fall protection trigger for residential framing: top plates, joists, rafters, trusses (Cal/OSHA T8 1716.2)
7-1/2 ft
general trigger (T8 1670). On framing, use the stricter 6 ft
4 : 1
foot out one quarter of the working length, about 76° (GISO 3276)
36 in
side rails above the upper landing
5,000 lb
anchor strength per worker, or a designed system with a safety factor of 2
6 ft · 1,800 lb
max free fall · max arresting force with a harness (T8 1670; 29 CFR 1926.502(d)(16))

Square and bolt the mudsill See it on the job site

1/2 in · 7 in
minimum bolt diameter · embedment in concrete
6 ft
max spacing (4 ft over two stories)
≤ 12 in · ≥ 4 in
first bolt from each plate end: within 12 in, and not closer than 4 in (city checklist; 7 diameters is 3-1/2 in)
2 per piece
at least two bolts in every piece of plate
middle third
of the plate width (one code-reader page: check)
28′ 10-1/8″
diagonal of a 16 x 24 ft rectangle

Crown, mark and cut See it on the job site

1 tooth ≈ 1/4 in
blade depth below the stock: "no more than one blade tooth" (Makita circular saw manual)
1/8 in
typical kerf of a carbide framing blade (check yours): the blade rides the waste side
2-1/2 in
depth of cut at 90° for a 7-1/4 in cordless saw (guide §3, retailer listing)
6 in
clamp any piece that would put your hand within 6 in of a miter saw blade (DeWalt manual); Bosch marks the whole table a no-hands zone
39-1/2 in
each header ply: 36-1/2 in rough opening + two 1-1/2 in jacks
3/4 in
error after 12 chained cuts each 1/16 in long, worst case (guide §7)

Joists, hangers and subfloor See it on the job site

16 in o.c.
joist layout; the 8 ft sheet end lands on a joist center
1-1/2 in · 3 in
minimum joist bearing on wood or metal · on concrete
≤ 1/8 in
tested gap from joist end to the beam; a 1 in gap is a repair
every hole
with the catalog nail; never mix screws and nails in one connector
1/8 in
gap at panel edges and ends; a 10d box nail is the gauge (APA)
8d · 6 / 12 in
subfloor nailing, edges / field (APA nailed-only; check panel maker)

Lay out the plates See it on the job site

15-1/4 in
first line: the near face, so the center lands at 16
48 · 96 · 144 in
sheet edges on stud centers at 16 and 24 in o.c. (19.2 does not land on 48)
1-1/2 in
stud thickness the X sits in
36-1/2 in
rough opening for a 36 in window with 1/2 in all around (the maker's sheet wins)
ceil(144 / 16) + 1 = 10
layout positions in a 12 ft straight run

Build the wall on the deck See it on the job site

97-1/8 in
92-5/8 in stud + three 1-1/2 in plates
2-16d common
stud to plate, end nail (or 3-16d box / 3-10d box): CRC Table R602.3(1) (check)
81 in
jack for an 82-1/2 in rough-opening height
39-1/2 in
header length: 36-1/2 in RO + two jacks
>70%
of nail-gun injuries in one NIOSH study came from toenailing or through-nailing
14′ 4-7/8″
both diagonals of this 12 ft x 95-5/8 in wall (computed)

Raise, brace, plumb and line See it on the job site

1-9/16 in
string off the wall: 1-1/2 in block + 1/16 in
1/8 in in 12 ft
straightness target with straight stock
3/8 in in 32 in
one plumb guideline (NAHB via WoodWorks, unverified); go tighter under tile
~8 ft
brace spacing, center first
24 in
top-plate splice offset, CRC reproduction (check)
15 ft
walls this tall need temporary restraints before hand-raising (T8 1716.2)

Sheathe the wall on the deck See it on the job site

7/16 in OSB
minimum wall sheathing, or 15/32 in plywood (check plan)
1/8 in
gap at edges and ends (APA)
6 in · 12 in
8d common at panel edges · field (CRC table, check)
3/8 in
minimum nail distance from a panel edge
260 → 640 plf
15/32 in panel, 8d at 6 → 2 in edge spacing: shows the pattern only; never design from it
12 diameters
minimum nail penetration into framing

Common rafters at the ridge See it on the job site

1.118 · 13.42 in
6:12 slope factor · inches of rafter per foot of run
173-11/16 in
24 ft span, 12 in level tail, 3/4 in ridge deduction (guide worked example)
≤ 1/4 depth
birdsmouth notch: 1-13/16 in max on a 2x8
≥ 1-1/2 in
seat bearing on the plate
6 ft
ridge rise above the plate: 12 ft run at 6:12
lower third
rafter ties; collar ties go in the upper third

Lay out and cut a stair stringer See it on the job site

7-3/4 in
maximum riser
10 in
minimum tread, nosing not counted
3/8 in
max riser or tread variation in a flight
14 · 7-23/32 in
risers for a 108 in rise
13 × 10 = 130 in
total run; stringer about 14′ 1″ before nosing and landing
80 in
headroom from the nosing line

Inspector walk: rough frame See it on the job site

4 – 12 in
anchor bolt from each plate end (city checklist; check)
25% · 40%
max notch in an exterior or bearing stud · in a nonbearing stud (R602.6 reproduction; check)
40% · 5/8 in
max bored hole in a bearing stud · min edge distance
1-3/8 in
deepest notch in a 2x6 bearing stud (25% of 5-1/2 in)
50% · 16 ga
top plate cut past half: 1-1/2 in strap, eight 10d each side, 6 in past (unless fully sheathed)
every header
bears on a jack; count per the header table (check)

Roofing

Fall protection and the ladder See it on the job site

6 ft
fall distance that triggers protection on slopes up to 7:12 (Cal/OSHA 1731)
any height
slopes steeper than 7:12 (Cal/OSHA 1731)
5,000 lb
anchor strength per worker, or a system with a safety factor of 2 (OSHA 1926.502)
3 ft
ladder rails above the landing edge (OSHA 1926.1053)
3.5 ft
foot setback for a 14 ft eave by the 4 to 1 rule; OSHA states one quarter of the working length, about 3.6 ft
18 ft
ladder needed: √(14² + 3.5²) + 3 = 17.4 ft, round up

Read the pitch, count the squares See it on the job site

1 square
100 sq ft of roof
1.118
pitch factor at 6:12; 1.054 at 4:12, 1.414 at 12:12
50 %
6:12 as a percent slope
2:12
lowest slope for asphalt shingles; 2:12 up to under 4:12 needs two layers of underlayment (CRC R905, verify)
3 per square
common bundle count; the wrapper rules

Tear off and check the deck See it on the job site

down to the deck
roof replacement removes existing layers (CRC 2025 R908.3, secondary viewer)
2+ layers
no recover over two or more roof coverings, or over wet or deteriorated roofs (R908.4)
24 in
rafter spacing drawn here; read the plans
4 × 8 ft
sheathing sheet: pull whole sheets or cut back to framing
nailing
sheathing nail size and spacing: follow the plans and CRC (check, not in the guide)

Drip edge and underlayment, in order See it on the job site

under / over
underlayment over the drip edge at eaves, under it at rakes (CRC 2025 R905.2.8.5)
2 in
drip edge laps, and how far it runs back onto the deck (R905.2.8.5)
1/4 in
drip edge extends below the sheathing (R905.2.8.5)
12 in o.c.
maximum drip edge nail spacing (R905.2.8.5)
2 in
underlayment lap at 4:12 and steeper; two layers 2:12 up to under 4:12 (Table R905.1.1(2))
0.019 in
minimum drip edge thickness in the guide (old IRC source, verify)
1 in caps
plastic-cap nails hold synthetic underlayment (guide §7); cap size and pattern per the maker (check)

Starter, exposure and the nailing pattern See it on the job site

4 nails
minimum per strip shingle; high wind or the maker may require more (CRC R905.2.6)
3/4 in
nail penetration into the deck, or through it if thinner (R905.2.5)
11–12 ga, 3/8 in head
galvanized roofing nails (maker sheet; guide says 12 ga)
5 5/8 in
exposure for one common laminated shingle (check wrapper)
6 1/2 in
course offset for that shingle; 4 to 8 in allowed by that maker (check)
3/8 in
starter overhang past rake and eave for that shingle (check)

Step flashing and counterflashing See it on the job site

4 × 4 in
minimum base (step) flashing leg size at a sidewall (CRC R905.2.8.3)
7 5/8 in
step length for a 5 5/8 in exposure: exposure + 2 in (ARMA)
1 per course
a step for every shingle course along the wall
roof leg only
nail the step to the deck, never to the wall (ARMA)

Flash a plumbing vent See it on the job site

top under, bottom over
vent boot flange: top under the upper shingles, bottom over the lower shingles (guide §8)
2 nails
upper flange corners, covered by the next course (common practice; follow the boot maker, check)
seal
nail heads and flange corners per the maker (guide §8)
3 in pipe
drawn here: 3 1/2 in OD; boots come sized to the pipe

The valley, fire-zone version See it on the job site

36 in
self-adhered (ASTM D1970) valley lining width (CRC R905.2.8.2)
24 in
minimum open metal valley lining width (R905.2.8.2)
26 ga (0.019 in)
valley metal in a WUI area, over 72 lb cap sheet 36 in wide (CWUIC 504.2.2, secondary)
6 in
no nails within 6 in of the centerline in ARMA's closed-cut detail; follow the maker for open valleys (check)

Ridge vent and cap See it on the job site

1 in
slot each side of the ridge on a truss roof (one maker's sheet, check)
6 in
stop the slot short of each end wall or hip (same sheet)
5 in
cap exposure, 4 nails per cap in normal wind (one maker's sheet)
1/150
attic net free vent area; 1/300 only when both code conditions are met (CRC R806, secondary)
ember
attic vents must resist embers and flame per the California WUI Code (R806; Montecito detail unconfirmed)

Class A, the 10 % rule, final walk See it on the job site

Class A
required for new and replacement roofs in Montecito (MFPD Standard 1)
> 10 %
of total roof area replaced or added means whole-roof Class A (MFPD Standard 1)
banned
wood shake and wood shingle, even in a rated assembly (MFPD)
FPC → County
MFPD reviews, the County inspects
0–5 ft
defensible space Zone 0; Zone 1 5–30 ft; Zone 2 30–100 ft (MFPD)
50 %
state rule: over half replaced in a year needs at least Class C (R902.1.2); Montecito is stricter

Inspector walk: the finished wing See it on the job site

top under, bottom over
vent flashing laps (guide §8)
0 exposed
nails left in the exposed face of any course (guide §16 quality checks)
eaves + rakes
drip edge everywhere, 2 in laps, 12 in o.c. (R905.2.8.5)
6 in
keep nails back from a valley centerline (ARMA closed-cut detail; maker for open valleys, check)

Windows, doors and weatherproofing

Ladder and PPE See it on the job site

1 : 4
base out one quarter of the working length [S9]
about 2 ft 7 in
base for this 10 ft eave (working length about 10 ft 3 in)
3 ft
rails above the landing [S9]
10 to 14 in
rung spacing; pull and tag a damaged ladder [S9]
7 1/2 ft
Cal/OSHA T8 1670: fall protection where a fall could be more than this [S22]

Measure the rough opening See it on the job site

37 x 61 in
RO for a 36 x 60 in unit at about 1/2 in a side; maker governs [P][V]
smallest
of 3 widths and 3 heights is the one you use [P]
1/8 in
diagonal tolerance: crew practice, maker controls [P][V]
1/16 in
read the tape to this; 37 3/8 in = 37.375 in

Wrap laps and the modified-I cut See it on the job site

upper over lower
every lap, every course [S8]
45°
head corner cuts [S11][P]
6 in
horizontal lap shown; use the WRB maker's number (check)
tape
only tapes the WRB maker approves [S8][P]

Sill pan with back dam See it on the job site

6 in
minimum up each rough jamb [S8]
2 in
minimum onto the wall face [S8]
9 in / 6 in
pan tape for 2x6 / 2x4 walls: common sizes, not code [S8][S11]
slope
outward; the number is the maker's, not found in sources [V]
fasten
only at side dams and flanges, never through the drain area [S12]

Set, shim and fasten the window See it on the job site

1/2 in
about this much room each side for shims; maker governs [P][V]
top + sides
seal the fin at the head and jambs, never the sill [S8]
two 3/8 in beads
at the head, in one maker's instructions [S11]
1 1/2 in
foam sheathing commonly allowed under fins; thicker may need clips [S8]
sash test
after fastening, every time [P]

Flashing order: jambs, then head See it on the job site

sill → jambs → head
the order, so every layer laps over the one below [S8]
1 in
head tape past the jamb tapes, at least [S8]
1 in
jamb tape top stays at least this far below the top of the head tape [S8]
6 in
tape shown here; 4, 6 and 9 in are common sizes, follow the makers [S8][S11]

Foam, backer rod and sealant See it on the job site

about 30%
low-expansion foam fill; 40 to 120 F; tack-free about 10 min (data sheet on a third-party host) [S14]
3/4 in rod
for a 3/8 to 1/2 in joint, one maker's table
≈ 1/2 width
sealant depth: a 1/2 in joint gets about 1/4 in of sealant (maker data sheet)
2 layers
of WRB under stucco over wood sheathing, IRC R703.7.3 (secondary copy; check CRC 2025)
compatible
many silicones bond poorly to asphalt barriers and damp wood [S12]

Exterior door with sill pan See it on the job site

pan + back dam
door sills slope out like window sills [S12]
hinges + strike
where the shims go [P]
about 3 in
hinge screw length, verify [P][V]
safety glazing
glass in a door is a hazardous location [S17]

Egress check: bedroom window See it on the job site

5.7 sq ft
net clear opening; 5.0 sq ft for a grade-floor opening [S2]
24 in · 20 in
minimum clear height and width [S2]
44 in
maximum sill height above the floor [S2]
sash open
measure the clear opening with the sash fully open [S2][P]
9 sq ft · 18 in · 36 in
a pane over 9 sq ft, bottom under 18 in, top over 36 in, walking surface within 36 in: safety glazing [S17]

Field water test See it on the job site

5 gal/h per sq ft
spray rate [S16]; this 3 x 5 ft unit: 75 gal/h (1.25 gal/min)
2/3
field pressure as a share of the lab rating [S13]
A: 15 min · B: 4 × (5 on, 1 off)
test procedures [S16]
0.15 / 0.45 cfm per sq ft
field air limits (fixed or casement / hung or slider) at 6.24 psf [S13][S16]

Inspector walk: before the siding See it on the job site

top down
check the layers the way water travels [P]
head over jambs
the head flashing laps the jamb flashing by at least 1 in [S8]
open bottom
the sill fin stays unsealed so the pan drains [S8]

Plumbing

Lay out from the plans See it on the job site

12 in
toilet rough-in, finished wall to flange center (product convention: check the toilet you are setting)
15 in
minimum, toilet center to side wall or obstruction (CPC 402.5)
24 in
minimum clear space in front of the toilet (CPC 402.5)
30 in
minimum toilet to toilet, center to center (CPC 402.5)
Drain → vent → supply
layout order that avoids rework (guide §5)

Solder a copper joint See it on the job site

1/4 turn
per lap on the tubing cutter (lesson plan)
0.002–0.010 in
joint gap capillary action needs (CDA)
450–464 °F
95/5 tin-antimony solder melts (Lucas-Milhaupt product page)
below 840 °F
soldering; above that it is brazing (guide §7)
70%
a joint filled less than this fails
0.2% lead
max in solder and flux on drinking water (H&S Code 116875)
30 min
watch the area after soldering (field practice, check)

Make a ProPEX joint See it on the job site

PEX-A only
cold expansion needs shape memory (lesson plan)
1/16 in
max from ring edge to tube end (Uponor instructions)
1/8 turn
rotate the head after each expansion (Uponor)
5 · 9
expansions for 1/2 in · 3/4 in, Milwaukee M12 (Uponor table, guide §7)
5 °F
make connections only above this (guide §7)

Drain slope under the floor See it on the job site

1/4 in per ft
minimum slope (CPC 708.1). 1/8 in only for 4 in and larger, with approval
16 ft × 1/4 = 4 in
drop = slope × run (math scene 1)
1.19°
digital level reading for 1/4 in per ft
4 ft
ABS/PVC horizontal support spacing (UPC Table 313.3 via study guide, check)
Cleanouts
upper end of each horizontal drain, every 100 ft, under-floor within 5 ft of access (guide §8)

Sanitary tee and vent See it on the job site

Sanitary tee
horizontal into vertical only (UPC 706.2)
Wye + 1/8 bend
vertical to horizontal and horizontal to horizontal (UPC 706.3, 706.4)
42 in
max trap arm for a 1-1/2 in trap (UPC Table, check CPC)
6 in
vent rise above the flood rim before going horizontal (UPC, check)
6 in
vent above the roof (UPC, check)
6 ft
max toilet flange to vent, developed length (UPC, check)

Building sewer in the trench See it on the job site

4 in
typical home lateral; the owner owns it to the District main (Montecito Sanitary District)
32 ft × 1/4 = 8 in
drop on this lateral
2 ft
spoil and tools back from the edge (8 CCR 1541)
4 ft · 5 ft
ladder required · protective system required (8 CCR 1541, 1541.1)
2 working days
call 811 before digging
2 ft
outside the wall, building drain becomes building sewer (guide §8)

Tie in to the old cast iron See it on the job site

60 in-lb
standard no-hub coupling bands, calibrated torque wrench (Fernco, guide §7)
80 in-lb
heavy-duty couplings (Fernco, guide §7)
4.3 psi
max test on no-hub couplings: gravity DWV only (Fernco, guide §7)
Upstroke
reciprocating saws cut as the blade pulls back toward the saw (trade practice)
Push stroke
hacksaw teeth point away from the handle (lesson plan)
4.38 · 4.215 in
4 in hubless cast iron OD (Tyler Pipe spec) vs PVC SDR 35 OD (ASTM D3034, check)

Water supply run See it on the job site

1 in
pipe this close to the framing face needs a nail plate (CPC 312.9, 2025)
18 ga
minimum plate, extending 1-1/2 in past the pipe (CPC 312.9)
32 in
PEX 1 in and smaller, horizontal support (UPC Table 313.3, check)
6 ft
copper 1-1/2 in and smaller, horizontal support (UPC Table 313.3, check)
80 psi
above this static pressure a regulator is required (CPC 608.2)

Water heater and gas See it on the job site

Upper + lower third
strap positions; lower strap at least 4 in above the controls (CPC 507.2)
6–24 in
T&P outlet above grade, pointing down, no valve, no trap (CPC 608.5)
3 in
minimum sediment-trap nipple (city CPC checklists)
6 ft
support for 1/2 in steel gas pipe (CPC Table 1210.3.5.1, code mirror)
20 ppm NOx
new gas water heaters (SB County APCD Rule 360)
Heat pump
Title 24 prescriptive path for new homes; a gas heater needs space reserved for a future heat pump (guide §11, check 2025 text)

Test and inspection See it on the job site

10 ft head · 15 min
DWV water test, or 5 psi air for 15 min, no air on ABS (CPC 712 per city checklists, check)
working pressure · 15 min
water supply test (CPC 609.4, city checklists)
10 psi · 15 min
gas test, gauge range no more than 2 × test (CPC 1213.3, 318.5)
0.10 psi
gas gauge resolution for tests of 10 psi or less
(805) 568-2000
County Building & Safety (Montecito is unincorporated)

Inspector walk: laundry and lav See it on the job site

No S-traps
prohibited, with bell, crown-vented and double traps (UPC Ch. 10, guide §8)
6 in
vent rise above the flood rim before horizontal (UPC, check CPC)
1 in · 18 ga
nail plate rule (CPC 312.9)
70%
a solder joint filled less than this fails (guide §7)
42 in
max trap arm, 1-1/2 in trap (UPC Table, check)

Electrical

Prove it dead See it on the job site

3 tests
hot–neutral, hot–ground, neutral–ground, all 0 V
Live · dead · live
prove the tester on a known source before and after
Pen tester
first alert only; it can miss shielded or low-voltage wiring and fails with a weak battery
GFCI
every corded tool on a construction site plugs into ground-fault protection (590.6, check edition)
Line side
the wires ahead of a main breaker stay live with the main off; never work there

Lay out receptacles: the 6 ft rule See it on the job site

6 ft
no point along the floor line more than 6 ft from a receptacle (210.52(A)(1))
12 ft
so receptacles are no more than 12 ft apart
2 ft
any wall space 2 ft or wider counts (210.52(A)(2))
18 in
a floor receptacle counts only within 18 in of the wall (210.52(A)(3))
12–18 in
typical box height to center; practice, not code (check the plan)

Set boxes: height, depth and fill See it on the job site

2.25 in³
per 12 AWG conductor (314.16(B))
4 × 2.25 = 9.00
four insulated 12 AWG conductors
+ 2.25
all equipment grounds together count once
+ 4.50
a device yoke counts twice the largest wire on it
15.75 of 18.0 in³
fits (add 2.25 if the box has internal clamps: 18.00, exactly full)
1/2 in
box front flush with the finished wall (314.20); never more than 1/4 in back on noncombustible finish

Drill and pull NM-B cable See it on the job site

1-1/4 in
from the hole edge to the stud face, or a steel plate ≥1/16 in (300.4(A)(1))
3/4 in bit
centered in a 3-1/2 in stud leaves 1-3/8 in each side
40 %
largest bored hole in a bearing-wall stud: 1.4 in in a 2x4 (60 % in nonbearing walls) (CRC R602.6)
5 ×
minimum bend radius of NM-B, in cable diameters (334.24)
Dry only
NM-B is not allowed in wet or damp locations (334.12(B))

Staple the cable, make up the box See it on the job site

12 in
support within 12 in of each box, then every 4-1/2 ft (334.30)
8 in
single-gang nonmetallic box without clamps: secure within 8 in (314.17(C) Ex)
1/4 in
sheath extends into the box at least 1/4 in past the clamp or knockout
6 in / 3 in
free conductor in the box / out past the opening (300.14)
Snug
staple holds, never crushes; never staple a flat cable on its edge

Kitchen and bath circuits See it on the job site

24 in
no point along the counter wall more than 24 in from a receptacle (210.52(C)(1))
20 in
receptacle no more than 20 in above the counter (210.52(C)(3))
2 × 20 A
small-appliance circuits; no lighting or other rooms on them (210.11(C)(1))
3 ft
bath receptacle within 3 ft of the basin (210.52(D)); none within 3 ft of a tub or shower up to 8 ft (406.9(C))
20 A
bathroom receptacle circuit (210.11(C)(3))
44 in
box center here: 8 in above a 36 in counter (practice; check the backsplash plan)

Service, meter and panel See it on the job site

200 A
common modern service; one-family minimum 100 A (230.79(C))
36 × 30 in × 6.5 ft
working space deep × wide × high (110.26)
6 ft 7 in
highest breaker handle above grade or floor (240.24(A))
14/12/10 AWG
15 / 20 / 30 A breakers (240.4(D))
230.85
outdoor emergency disconnect, red label, white letters ≥ 1/2 in
230.67
Type 1 or 2 surge protective device at the service
4–6 ft
meter centerline above grade, typical; SCE sets it (check SCE ESR)

Grounding and bonding See it on the job site

8 ft · 5/8 in
minimum ground rod length in earth and diameter (250.52(A)(5))
6 ft
minimum spacing between rods (250.53(A)(3))
25 Ω
a single rod is enough only if it measures 25 ohms or less (250.53(A)(2))
6 AWG Cu
largest GEC needed to rods only (250.66(A)); 4 AWG Cu to a concrete-encased electrode (250.66(B))
30 in
if rock stops the rod, lay it in a trench at least 30 in deep (250.53(A)(4))
Once
neutral-to-ground bond only at the service (250.24, 250.28)

Big loads: size it from the nameplate See it on the job site

125 %
EV charging is a continuous load: circuit = 1.25 × charger current (625.40, 625.41, 210.19(A)(1))
48 A → 60 A
a 48 A charger needs a 60 A circuit; 40 A → 50 A; 32 A → 40 A
6 AWG
THHN in conduit, 75 °C column = 65 A; 6 AWG NM-B is 55 A, not enough for 60 A
Own circuit
each EV outlet gets an individual branch circuit with no other outlets
7,200 VA
service load: the greater of 7,200 VA or the nameplate (220.57)
25 ft
usable output cable length unless a cable management system is used (625.17(C))

Rough inspection: find the rejects See it on the job site

1-1/4 in
hole edge to stud face, or a steel plate ≥ 1/16 in (300.4(A)(1))
1/2 in
box front flush with 1/2 in drywall (314.20)
6 in / 3 in
free conductor in the box / out past the front (300.14)
In a box
splices only in boxes that stay accessible (300.15, 314.29)
8 in
staple within 8 in of a clampless single-gang plastic box (314.17(C) Ex)

Trim out and test See it on the job site

~1/2 in
typical strip length for a terminal screw; read your device (Leviton example sheet)
7–10.6 in-lb
terminal torque on one maker's example sheet; use the number on your device (110.14(D))
¾ turn
hook around the screw, clockwise
1 wire
per terminal unless the device is marked for more: pigtail instead (110.14(A))
4–6 mA
Class A GFCI trip level (UL 943)
Laundry
needs GFCI (210.8(A)) and AFCI (210.12): dual-function protection

Heating, cooling and ventilation

Load first: Manual J, then S See it on the job site

26,870 BTU/h
cooling total, rough Manual J-lite: walls 560, ceiling 630, glass 1,800 + sun 20,250, leaks 710, people + kitchen 2,120, latent 800
24,430 BTU/h
heating: walls 3,690, ceiling 4,170, glass 11,880, leaks 4,700 at 37 °F outside, 70 °F inside
37 °F / 80 °F
Santa Barbara Municipal Airport design temperatures, the station used for Montecito (math scene note)
90–115%
Manual S cooling window used here: 24,180–30,900 BTU/h (115% unconfirmed for the 2023 edition: check)
4.0–4.8 tons
what "500–600 ft² per ton" would have sold: 79–114% too big
§150.0(h)1
Title 24 requires a load calculation (ASHRAE, SMACNA or ACCA Manual J)

Set the condenser pad See it on the job site

Zone 0: 0–5 ft
Montecito Fire: no items likely to be ignited by embers next to the house (guide, local rules)
MCA 24.0 A
1.25 × 18 A RLA + 1.5 A fan (guide example nameplate)
MOCP 33 A → 30 A
1.75 × 18 + 1.5; round DOWN to the next standard breaker
Clearances
from this model's installation manual (check): coil intake, service side, top discharge
County permit
a whole-unit swap needs a County permit in Montecito; only a component swap is exempt

Line set: cut, braze, test, vacuum See it on the job site

3/4 in · 3/8 in
suction and liquid line OD for this 2.5-ton unit (check the manual's line-size table)
20–50 SCFH
purge flow before lighting
2–3 SCFH
braze flow; more cools the joint
1,190–1,475 °F
BCuP-5 (15% silver) melt range
160–604 psig
nitrogen test pressures across makers: use this unit's manual
460 psig, 15 min
Goodman/Daikin Comfort R-32 row in the guide's manufacturer table
≈0.9 psi per °F
temperature drift at 460 psig (0.3 psi per °F at 150 psig)
500 microns
common target; the decay pass line differs by maker (Trane 1,500 in 10 min; Lennox no rise above 500 in 20 min)

Furnace, coil and filter See it on the job site

40,000 BTU/h input
80% AFUE → 32,000 output: 131% of the 24,430 heating load (140% furnace limit, 2009 ACCA article: check)
1/4 in per ft
condensate slope (IMC minimum 1%)
3.3 ft²
filter face at 300 fpm for 1,000 CFM → 20 × 25 in (3.47 ft²)
MERV 13
EPA recommends it if the blower can take it: read static after the swap
Leak sensor
UL 60335-2-40 detection on ducted A2L splits; sensor low at the drain pan

Hang, seal and insulate the ducts See it on the job site

≤ 4 ft
between flex supports; straps ≥ 1.5 in wide
30%
compression can mean 4× the air resistance (ADC via HVAC School)
UL 181
mastic and foil tape; mesh over gaps over 1/4 in
R-8 / R-6
supply / return outside conditioned space (guide, IECC 2009: check current)
5% → 50 CFM25
Title 24 new duct system leakage at 1,000 CFM fan flow

Registers and balancing See it on the job site

400 CFM/ton
design airflow; 2.5 tons → 1,000 CFM
≥ 350 CFM/ton
Title 24 verified airflow for a new system (300 for altered)
9 registers
design 120, 110, 60, 160, 140, 130, 120, 60, 100 CFM (example Manual D)
Return path
closed bedrooms need a jump duct or transfer grille (guide, Installation)

Bath and kitchen fans go outside See it on the job site

CMC 504.1.1
exhaust ducts terminate outside, with backdraft dampers
CMC 502.2.1
3 ft from the property line and from building openings; separation from outdoor-air intakes
CRC R325.2
bath: 50 CFM intermittent or 20 CFM continuous
CMC 504.3
range hood: metal, smooth-inside duct; never into the attic or crawl space
Table 150.0-G
gas range, home over 1,500 ft²: 70% capture or 180 CFM
100 CFM
range hood intermittent minimum (CMC 405.4.1: check its scope)

Gas, vent and combustion air See it on the job site

10 in² each
40,000 BTU/h ÷ 4,000, vertical ducts (CMC 701.6.1); horizontal ducts need 1 in² per 2,000
within 12 in
of the top and of the bottom of the enclosure
50 ft³ per 1,000 BTU/h
the indoor-air option instead: 2,000 ft³ for this furnace
1/4 in per ft
vent connector rise toward the vent (math scene "Venting")
3.5 in wc
natural gas manifold, typical (guide); inlet 4.5–14.0 on one maker's plate
400 ppm
air-free CO limit; a healthy furnace reads under 50

Thermostat and 24-volt controls See it on the job site

24–28 VAC
R to C, the control power pair (guide: Electrical)
R · C · W · G · Y
24 V hot · common · heat · blower · compressor; O/B is the heat pump reversing valve
3 A
a typical 24 V board fuse: replace with the same amps, never bigger (guide fault table)
< 2 V
across closed contactor contacts; coil sees 24–28 VAC (guide fault table)
RLA 18 + fan 1.5
the example nameplate from station 2: amps are read against it
C wire
a smart thermostat needs the common; use a spare conductor or an adapter

Commission with data See it on the job site

≤ 0.5 in wc
TESP design target; trouble at 0.8 or higher
20.8 °F
split = 0.75 × 30,000 ÷ (1.08 × 1,000)
400 CFM/ton
design; Title 24 minimum 350
0.45 W/CFM
fan efficacy limit, gas furnace air handler (0.58 for others)
+9 oz
15 ft beyond the factory 15 ft × 0.6 oz/ft (example: this maker lists 0.53–0.64; use the manual)
37 °F rise
32,000 ÷ (1.08 × 800 CFM on heat): inside the plate range (check the plate)
< 50 ppm
healthy air-free CO; 400 ppm is the limit, not a target
Zone 6
an air conditioner here needs no HERS charge verification; a heat pump does (confirm the zone by parcel)

Inspector walk: the east attic See it on the job site

≤ 4 ft
between flex supports; straps ≥ 1.5 in wide
30% → 4×
compression vs air resistance (ADC via HVAC School)
UL 181
mastic and tape; cloth duct tape is not UL 181
5% → 50 CFM25
Title 24 leakage for an entirely new system at 1,000 CFM

Insulation and air sealing

Suit up: SDS, coverall, respirator See it on the job site

Fit test
Respirator users need a medical evaluation, then a fit test before first use and at least every year (Title 8 §5144).
N95 or better
for blowing fiberglass; respirator if fiber is above 1 per cc (one trade source)
Spray foam
supplied-air or PAPR, or full-face with organic-vapor cartridges plus N95 pre-filter. The SDS governs.
Coverall
off at the work edge, never worn home

Measure the wall, cut the batt See it on the job site

9 cavities
12 ft wall at 16 in o.c.: 144 ÷ 16 = 9 bays, 10 studs
14½ in
clear bay at 16 in o.c. (16 − 1½)
15 in
cut width for a 14½ in clear bay: clear + up to ½ in so it friction-fits (one trade article)
3½ in / 5½ in
actual depth of a 2x4 / 2x6 cavity

Find the leaks from the attic See it on the job site

24
sealing locations listed for residential in the Title 24 air-sealing fact sheet (2022 edition)
Six sides
every cavity must be enclosed on all six sides
Board or joists
never step between joists
Smoke + blower door
smoke and infrared find leaks; only a pressure test proves the result

Seal by gap size See it on the job site

≤ ¼ in
caulk
¼ – 2 in
one-part foam or mastic
2 – <3 in
two-part foam
≥ 3 in
rigid infill that will not sag
24 in
brace openings wider than 24 in, braces at most 24 in apart: 96 in ÷ 24 = 4 spans, 3 braces

Batts with no gaps or squeeze See it on the job site

R-15 / R-21
2x4 / 2x6 wall cavity, Title 24 2025 prescriptive (U-0.095 / U-0.069)
3½ in
2x4 cavity depth: use the batt made for it
2%
compression limit by volume (one trade article; check the product sheet)
Behind boxes
insulation goes between the sheathing and the back of every box (RA3.5)

Blow the attic to depth See it on the job site

10.2 in
settled depth for R-38 on one cellulose chart (check the bag card)
21.4 sq ft/bag
R-38 coverage on that chart: 1,120 sq ft ÷ 21.4 = 52.3 → 53 bags (check)
1 ruler / 250 sq ft
readable from the access (Title 24 RA3.5, 2013 text)
3 in
clearance from recessed lights, flues and chimneys (CIMA)
1 in
air space between insulation and roof sheathing at the vents (IRC R806.3 text; check the CRC section)
R-30 / R-38
attic, zones 2–7 / 1 and 8–16 (Title 24 2025). Montecito zone not confirmed.

Dense-pack a closed wall See it on the job site

5/8–2 in
hole size; within 2 ft of the plates, at most 5 ft apart vertically
3.25 psi
minimum line pressure (CIMA practice; check the machine and product)
15.2 sq ft/bag
dense-pack coverage on one chart: 1,000 ÷ 15.2 = 65.8 → 66 bags (check the bag card)
Net area
gross wall area minus windows and doors

Rim joist and crawlspace floor See it on the job site

R-19
minimum in a raised wood floor (Title 24 mandatory, 2022 summary)
Rim = wall R
rim joists insulated to the same R-value as the walls (RA3.5, 2013 text)
3¼ in
max spray foam on rim/sill without a thermal barrier, 0.5–2.0 pcf (IRC R316.5.11 text; the 2025 CRC may number it R303, check)
6 in
vapor retarder laps (IRC R408.3 text, for unvented crawlspaces; check)

Blower door: CFM50 and ACH50 See it on the job site

−50 Pa
test pressure, house depressurized
ACH50
= CFM50 × 60 ÷ volume (cu ft)
8,960 cu ft
this house: 1,120 sq ft × 8 ft ceilings
Example
test-in 2,100 CFM50 = 14.1 ACH50; test-out 690 CFM50 = 4.6 ACH50 (example numbers)
< 5 ACH50
performance-path credit, verified by blower door (2022 fact sheet; check 2025)

What the ECC rater checks (QII) See it on the job site

>700 sq ft
additions that need QII; all new single-family (one secondary source, check)
ECC
Energy Code Compliance rater, formerly HERS (CEC)
6 spots
random depth readings per surface type (RA3.5, 2013 text; check 2025)
Hatch
insulated lid and gasket (Title 24 2022 mandatory summary)

Inspector walk: the bedroom wall See it on the job site

Grade I
no gaps, voids, compression or doubled-over batts (RA3.5, 2013 text; check 2025)
8
costly failures in guide §14: compression, crammed wires/boxes, behind boxes, windows, soffits, top plates, braces/fasteners, open cavities
[P]
walk and photograph every bay before you call for the rater

Drywall and plaster

Seal the room, count the board See it on the job site

25 / 50 ug/m 3
respirable silica action level / PEL, 8-hour average (8 CCR 1532.3)
348 sq ft
net wall area, 14 x 10 x 8 room with 36 sq ft of openings
17 sheets
12 for walls + 5 for the ceiling, 4x8 = 32 sq ft each
10 %
waste allowance: a rule of thumb, no source found (unverified)
5/8 Type X
garage ceiling under a habitable room (CRC R702, Table R702.3.5)

Ceiling first See it on the job site

12 in
max screw spacing, 1/2 in ceiling, 16 in o.c., no adhesive (CRC Table R702.3.5)
Perpendicular
ceiling board runs across the joists; all edges and ends on framing
Stagger
end joints offset row to row (CRC R702.3; shown 4 ft)
3/8 in
single ply not allowed on ceilings with water-based texture or carrying insulation

Screw pattern and depth See it on the job site

5/8 in
minimum screw penetration into wood framing (CRC R702.3.5.1, ASTM C1002 Type W or S)
12 in
max spacing on this ceiling; walls on 16 in o.c. allow 16 in
3/8 in
minimum from edges and ends (USG installation guide)
1-1/8 in
shortest screw for 1/2 in board into wood (1/2 + 5/8)

Walls: staggered seams See it on the job site

16 in
max screw spacing, 1/2 in wall, 16 in o.c. (CRC Table R702.3.5)
12 in
max on 24 in o.c. walls, no adhesive
24 in
screw spacing allowed on 24 in o.c. walls with adhesive to ASTM C557
3/8 in
minimum from edges and ends (USG)

Score, snap, back-cut See it on the job site

Face first
score the face paper, snap, then cut the back paper (guide §6, crew practice)
48 in
common drywall T-square blade (Empire 418-48 is 48 in): spans a 4 ft sheet in one pass
62 in
the piece cut here, measured from the factory end
Rasp
knock off ragged paper so the cut edge fits tight (guide §6, crew practice)
Small first
cut a little long and trim: you cannot add board back (guide §6)

Outlet cutout See it on the job site

1/8 in
max gap around a box in drywall or plaster (NEC 314.21, 2023 NEC per EC&M; 2025 CEC: check)
1/4 in
max set-back of the box edge from a noncombustible finished surface (NEC 314.20, check)
1/16 in
gap left here: inside the limit

Corner bead, tape and three coats See it on the job site

6 / 10 / 12 in
knife for tape, fill and finish coats (guide §7, crew practice)
~2 in
each coat feathers past the last (USG all-purpose compound sheet)
1/32 in
mud left under paper tape (USG)
9 in
max between fasteners on metal corner bead (one maker's instructions)
55°F
minimum room temperature while finishing (USG)

Sand and check with a raking light See it on the job site

Level 4
two coats on flat joints, one on angles, three on fasteners; smooth walls, flat paint (GA-214-2021)
Level 5
Level 4 plus a skim coat over everything; gloss, dark paint or critical light
HEPA
NIOSH measured the lowest exposure with a power sander on a HEPA vacuum
No dry sweeping
dry sweeping and compressed-air cleanup restricted (8 CCR 1532.3)

Garage ceiling: 5/8 in Type X See it on the job site

5/8 in Type X
garage ceiling under habitable rooms (CRC Table R702.3.5)
24 in o.c.
joist spacing, board perpendicular
6 in
max screw spacing in the CRC row (contested; the listing wins)
1-1/4 in
shortest screw: 5/8 board + 5/8 in into wood
Level 2
typical finish level for garages (GA-214)

Veneer plaster on blue board See it on the job site

1/16–3/32 in
one-coat veneer finish thickness (USG veneer finish instructions)
3/16 in
max veneer plaster in one coat (CRC R702, guide §13)
3 coats
traditional gypsum plaster on metal lath; 2 coats on other bases
5/8 in
min plaster thickness on expanded metal lath; 1/2 in on gypsum lath
C-35
CSLB lathing and plastering license

Inspector walk: board check before tape See it on the job site

All ends on framing
every butt end lands on a stud or joist (CRC R702.3)
16 in
max screw spacing, 1/2 in wall on 16 in o.c. studs (CRC Table R702.3.5)
Paper whole
dimple, do not break the face paper (USG installation guide)
1/8 in
max gap at a box (NEC 314.21, check)

Tile and waterproofing

Wet-cut station: silica first See it on the job site

50 µg/m³
Cal/OSHA silica limit (PEL), 8 h average; action level 25 (guide §1)
Water to the blade
Stationary masonry saw, Table 1: integrated water that feeds the blade continuously; then no respirator is listed (federal OSHA 1926.1153; Cal/OSHA 1532.3 is the CA rule, check it)
Continuous rim
blade type for glazed ceramic and porcelain (guide §9)
Top toward you
blade rotation on a wet saw: teeth enter the tile from the top
11 7/16 in
border cut for this floor (station 3 layout); blade on the waste side
GFCI
on every tool near water (guide §1, crew practice)

Snap cutter, grinder and core bit See it on the job site

Score once
one pass on a snap cutter; a second pass chips the glaze (crew practice)
Snap cutter
straight cuts on ceramic; wet saw for porcelain and miters (guide §9)
Continuous rim
blade for glazed ceramic and porcelain, also on the grinder (guide §9)
Wet and slow
core bits and hole saws need water and a slow start (guide §9, practice)
P100
sealed respirator for any dry, dusty cut; shroud + HEPA vac or water (guide §1; check Cal/OSHA 1532.3 Table 1)
9 in
top-course piece here: 94 in of wall less 7 courses at 12 1/8 in (check on site)

Floor check and layout See it on the job site

L/360
joist deflection for ceramic and porcelain; L/720 for natural stone (TCNA Handbook, via Boise Cascade tech note)
1/8 in in 10 ft
flatness when any tile edge is 15 in or more; also 1/16 in in 24 in (ANSI A108.02, via CTEF)
1/4 in in 10 ft
flatness for smaller tile; 1/16 in in 12 in
18-24-30 in
a 3-4-5 triangle: diagonal proves square (guide §3)
11 7/16 in
border each side: (120 − 4 × 24 1/8) ÷ 2 = 11 3/4 in, minus 1/16 half joint and 1/4 in gap

Drain, pre-slope and curb See it on the job site

1/4 in per ft
liner pitch to the weep holes (CPC 408.8, code mirror)
1/8 to 1/2 in per ft
finished receptor floor slope range (CPC 408.6, code mirror)
0.75 in
rise over a 36 in run at 1/4 in per ft (math: pan-slope-rise)
2 to 9 in
dam (curb) top above the drain top (CPC 408.6)
3 3/8 in
this shower: finished curb 5 3/8 in, finished drain 2 in above subfloor

Liner: 3 in over the dam See it on the job site

3 in
minimum liner height above the top of the finished dam (CPC 408.8)
1 in
no nails or holes in the liner below this height above the finished dam (CPC 408.8, code mirror)
4 in
corner folds and reinforcement reach 4 in each way (CPC 408.8)
D4551 / D4068
PVC / CPE liner standards; also lead, copper, 3-ply felt (guide §5)
20–30 mil
total for a liquid membrane system, if used instead (guide §6, one maker)

Flood test See it on the job site

2 in, 15 min
code-mirror minimum flood test (CPC 408.8.5)
24 h
typical for Schluter's shower system; use the longest of code, maker and inspector (guide §7)
2 in
temporary barrier when there is no threshold (curbless)
2.0 in
water depth at the drain here; 1.25 in at the walls

Backer board and mortar bed See it on the job site

1/4 in
gap at the base (guide §4, Fine Homebuilding)
1/8 in
gap between panels
8 in
max screw spacing; 3/8 in from edges, 2 in from corners; 1-1/4 in screws
Score + snap
cut cement board with a carbide scoring knife (crew practice); power cuts make silica dust (guide §1)
ASTM C1288 / C1325
fiber-cement and cement backer on the CRC list; no water-resistant gypsum where water hits (guide §4)
1.5 in
shower mortar bed thickness, ANSI A108.1A per CTaSC (check: one reply on the same page cites 1–1.75 in)

Thin-set and large-format setting See it on the job site

95 %
mortar contact in wet areas and exterior; 80 % in dry areas (guide §8, Custom; TileLetter)
12 x 24
an edge of 15 in or more: the flatness limit tightens to 1/8 in in 10 ft (station 3)
70 F / 50 % RH
reference cure conditions on maker sheets (guide §8)
24 h
minimum wait before grouting (guide §11)
1/8 in
joint on this floor; the tile maker sets the minimum (check)

Grout, haze and sealer See it on the job site

24 h
minimum after setting before grout (guide §11, Custom)
45°
float angle across the joints (crew practice)
24–72 h
cement-grout sealer timing (Mapei FAQ [S16])
2 buckets
rinse and clean water for the sponge (crew practice)

Movement joints and sealant See it on the job site

~25 ft
interior field joint spacing; 12 ft in sun or moisture; 8–12 ft exterior (Mapei; TCNA EJ171 not read, check)
0
field joints for this 10 ft room: ceil(10/25) − 1 (math: movement-joints)
about 33 ft
sealant here: two corners of 7.8 ft, the 6 ft curb, 4 ft at the partition, 8 ft at the east wall (math: perimeter-joint)
Through
existing slab joints carry through the tile (guide §12)

Inspector walk: the finished bath See it on the job site

1/8–1/2 in per ft
shower floor slope; standing water means a flat spot (CPC 408.6, code mirror)
Sealant
at every change of plane, not grout (guide §12)
80 / 95 %
mortar contact dry / wet; a cracked, hollow tile usually means low coverage (guide §8, §14)
1/16 in in 24 in
flatness for 12 x 24 tile; lippage tolerance itself not found (check TCNA / ANSI A108.02)

Cabinetry and millwork

Read the cut list and story pole See it on the job site

34-1/2 in
standard base cabinet box height; 24 in deep; widths in 3 in steps (guide §3, S12, secondary)
54 in
wall cabinet bottom, about 18 in above the counter (guide §3, S12)
84 in
top of a 30 in wall cabinet hung at 54 in (one maker's install guide)
1/8 in per 8 ft
plumb tolerance, so 1/16 in over 4 ft (AWI 0620 §3.1, guide §3)
25.4 mm = 1 in
32 mm ≈ 1-1/4 in · 35 mm ≈ 1-3/8 in · 37 mm ≈ 1-15/32 in

Break down sheet goods See it on the job site

0.05 ppm
CALGreen 4.504.5 limit for hardwood plywood (particleboard 0.09, MDF 0.11): verify against the adopted 2025 text
32 sq ft
one 4 × 8 sheet. Sheets = area ÷ (32 × (1 − waste)), rounded up
7 sheets
180 sq ft at 15 % waste (guide §18; the 15 % default is crew practice)
Guard + spreader
Cal/OSHA Title 8 §4300 (hand-fed rip saws): hood over the blade, spreader, anti-kickback, push sticks at the saw
23-1/4 in
sample rip for a frameless base side (check your cut list)

Edge band and seal the core See it on the job site

180–200 °C
process temperature on one EVA edgebanding glue sheet (Kleiberit 773.3 TDS). Use your glue's sheet (check)
18 °C (64 °F)
minimum room temperature on that sheet; panels and band acclimated to the room
10–30 m/min
machine speed on that sheet, by edge width
Seal cut cores
exposed core swells with moisture: seal before install (AWI 0620 §3.1, guide §5 and §10)

Bore hinge cups and 32 mm rows See it on the job site

35 × 13 mm
hinge cup diameter and depth; plate pilots 3 mm, #6 × 5/8 in screws (Blum, guide §11)
22.5 mm
cup centerpoint for 16 mm overlay; 24.5 mm for 18 mm (guide §11)
37 mm / 32 mm
hinge plate centerline 37 mm back; plate holes 16 mm above and below (32 mm apart) (Blum, guide §11)
5 mm · 32 mm · 37 mm
shelf-pin holes: diameter, spacing, first row from the front edge; 12–14 mm deep (32 mm system, secondary source)
2 or 3 hinges
4–6 kg door: 2; 6–12 kg: 3 (doors ≤ 600 mm wide, Blum)

Assemble the box and check square See it on the job site

42-7/16 in
diagonal of a 30 × 30 in box face (√(30² + 30²) = 42.43 in)
1-1/4 in
pocket screw for 3/4 in stock (Kreg, guide §4)
equal diagonals
= square. A 1/4 in difference is about 0.18 in of rack across 30 in
1/16 in
a common shop limit for diagonal difference (crew practice, check)

Field check, blocking and layout lines See it on the job site

34-1/2 in
base top line, measured up from the floor high point (one maker's install guide; guide §3)
1/8 in per 8 ft
plumb tolerance (AWI 0620 §3.1). Out-of-tolerance walls are not the installer's to fix without written direction
16 in o.c.
typical stud spacing (check the framing)
smallest reading
under a level line = high point of the floor

Set base cabinets at the high point See it on the job site

1/16 in over 4 ft
level and plumb per box (AWI 1/8 in per 8 ft, guide §8)
#8 × 3 in
pan head screws, at least 1 in into the stud, in one maker's guide. Use the screw your cabinet line specifies (check)
in pairs
shims at each fastener, opposed, so the box is not twisted (crew practice)
3/16 · 1/4 in
how low boxes 1 and 3 sit from the station 6 readings

Hang a wall cabinet, scribe the filler See it on the job site

54 in
ledger top / wall cabinet bottom (guide §9, S12)
2 + 2 screws
two through the top rail and two through the bottom rail per wall cabinet, in one maker's guide (check your line)
1/4 in spread
gaps 3-3/8, 3-1/2, 3-5/8 in: 3-5/8 − 3-3/8 = 1/4 in
last 1/16 in
with a block plane (guide §10)
written direction
if the wall is far out of tolerance, before you scribe (AWI, guide §10)

Hang doors, fit drawers, set reveals See it on the job site

opening − 42 mm
TANDEM inside drawer width (1-21/32 in). 15 in opening → 13-11/32 in (guide §12, Blum)
16-1/2 → 14-27/32 in
this 18 in drawer base: 18 − 2 × 3/4 = 16-1/2 in opening
±2 mm / +3 −2 mm
hinge side and depth adjustment (Blum, guide §11; height range printed inconsistently: check the model)
1/8 in
door-to-door reveal drawn here: a common target, not from a standard (check your spec)
21 in slides
fit 24 in deep base cabinets (guide §12)

Miter and pin base trim See it on the job site

23 gauge
pin nailer: holds trim without visible holes; use glue for strength (guide §14, crew practice)
45° + 45°
= a 90° corner. Corner not square? Cut half the angle finder reading on each piece (guide §14)
test on scrap
check the miter on scrap and sneak up on length (guide §14)
≥ 6 in
no-hands zone at a miter saw: use the distance the saw maker marks (check). Cal/OSHA T8 §4307.1 covers miter saws (section text not read)
3-1/2 × 1/2 in
base size drawn here; profile sizes were not researched (check)

Inspector walk: punch the finished run See it on the job site

1/16 in over 4 ft
level and plumb per box; 1/8 in per 8 ft over a run (AWI 0620 §3.1, guide §16)
no drywall screws
approved cabinet screws into studs or blocking only (AWI, guide §8)
seal cut cores
every site-cut edge on factory-finished boxes (AWI, guide §10)
adjust last
hinges after slides; side ±2 mm, depth +3/−2 mm (Blum, guide §11)

Finish carpentry

Acclimate the trim, read the house See it on the job site

8–12% MC
interior trim in a conditioned coastal house, at 45–65% RH (Woodwork Institute, guide §4)
72 h
minimum acclimation with the HVAC running (Woodwork Institute)
~2 points
trim vs the house reading, steady over 2–3 readings (shop practice)
6–8%
kiln-dried trim on delivery: drier than a coastal house
2 ft from the end
read at mid-width (guide §4)
50% RH → 9.2% · 60% → 11.0%
equilibrium moisture at 70°F (Wood Handbook, guide §4)

Cut station: test the saw, set the dial See it on the job site

(180 − corner) ÷ 2
dial for any corner: 88° → 46°, 91.5° → 44.25°, 92° → 44° (guide §6)
2×
the flip-test wedge shows twice the saw error (guide §7)
6 in
clamp work that puts a hand within 6 in of the blade (saw maker's manual)
80 teeth
12 in trim blade, low or negative hook (guide §7)
1/16 in
cut long, test, trim in 1/32 in steps (guide §7)
monthly
re-check a job-site saw, and after any bump (guide §7)

Baseboard: cope, miter, scarf See it on the job site

2 nails per stud
one above and one below the midline, angled (guide §8)
5–15°
back-bevel on a cope (shop practice)
1/16 in long
long pieces spring in tight (guide §8)
30–45°
scarf on a stud, glued and nailed (shop practice, guide §7)
15/16 ga, 2–2-1/2 in
into studs; at least 1 in into framing (guide §8)
2 ft
stagger joints between layers (guide §8)

Window: stool, apron, casing See it on the job site

3/16 in
casing reveal; 3/16–1/4 in is typical, a convention, not code (guide §8)
1/2–1 in
stool horn past the casing (guide §8, shop practice)
12–16 in
nail pairs on casing (guide §8)
45°
head miters on a square opening, long points out (guide §8)
1/32 in
six-point reveal target (lesson drill)
2 in
finish nails into the framing; brads into the jamb (guide §8)

Hang a prehung door See it on the job site

34 × 82-1/2 in
rough opening for 2′8″ × 6′8″: width + 2 in, height + 2-1/2 in (This Old House, guide §9)
1/8 in
even gap at head, hinge and latch; 3/32 in per Fine Homebuilding
1/16 in
plumb over the height (lesson drill)
2-1/2–3 in
one long screw in the top hinge, into framing
4-9/16 in
common jamb width; a thicker wall needs an extension (guide §5, §9)
3 cycles
swing test before you case it

Crown: upside down and backwards See it on the job site

38° spring
drop 4-1/8 in, projection 3-1/4 in on this crown (measure yours)
45° / 0°
nested miter and bevel on a 90° corner (guide §6)
31.6° / 33.9°
miter / bevel if cut flat, 38° spring, 90° corner (guide §6)
1/4 in
blocking short of the crown back (Fine Homebuilding, guide §8)
16–24 in
nailing on the backer (guide §8)
18+ TPI
coping blade for crown (guide §7)

Wainscot: story pole and equal panels See it on the job site

(L − n × w) ÷ panels
118 − 5 × 3.5 = 100.5; ÷ 4 = 25-1/8 in (guide §6)
1/3 of the wall
36 in on a 9 ft wall; 32–36 in on 8 ft (guide §8)
3-1/2 in
stile width on this wall
1/8 in short
cut rails short of the wall length to fit (guide §8)
equal
keep panels equal on a wall (guide §6)

Table saw: rip the scribe stile See it on the job site

fence or gauge
fence for rips, miter gauge for crosscuts, never both together (guide §2)
riving knife + guard
on whenever the cut allows (guide §2)
beside the blade
stand out of the kickback line; push sticks; outfeed support (guide §2)
24–30 teeth
thin-kerf rip blade with the riving knife (guide §3)
~0.003 in
fence parallel to the miter slot, a common shop target (guide §3)
~1/4 in
teeth above the stock (shop practice; check your saw's manual)
~30,000 / yr
table-saw blade-contact injuries treated; about 4,000 amputations (guide §2)

Built-in: level, scribe, shelves, doors See it on the job site

≥ 1/4 in
scribe allowance beyond the worst gap: 3/4 in wall → 1 in stile (guide §6)
3/4–1 in
oversize scribe board at wall ends (guide §11)
32 in / 36 in
3/4 ply shelf span bare / with solid nosing (guide §11)
32 mm
hole spacing on the system grid (guide §11)
35 mm × 13 mm
cup hinge bore (guide §11)
1/4 in
shelf sag most people call unacceptable (guide §11)

Caulk, fill and sand for paint See it on the job site

1/16 in
nail set below the surface (lesson drill)
150–180 grit
paint-grade sanding (lesson module)
1/8 in or less
tooled caulk bead (lesson check)
> 1/4 in
scribe, shim or fill instead of caulk (guide §12)
paintable acrylic latex
trim joints; never 100% silicone on paint-grade (guide §12)
3 ft
raking-light inspection distance (lesson drill)

Floors and paint

Fit and check your respirator See it on the job site

P100
N100, R100 or P100 filters for lead (guide §1 [S4])
10 s
negative-pressure check: inhale, facepiece collapses slightly, hold your breath 10 seconds (OSHA 1910.134 App. B-1)
Every time
seal check each time you put it on; fit testing is part of the respirator program (guide §1)
No beard
facial hair breaks the seal (guide §1)
10 µg/m³
Cal/OSHA lead PEL, 8-hour average; action level 2 µg/m³ (guide §4 [S4])

Contain the work area See it on the job site

6 ft
floor sheeting past the work area inside (10 ft outside) — EPA RRP
6 sq ft
per room inside: at or under this is minor repair under 40 CFR 745.83; jobs in one room within 30 days add up
2 ft
clean at least this far past the work area, high to low
3 years
keep the RRP records
P100
respirator filters for scraping and sanding; seal check every time

Take off the floor See it on the job site

252 sq ft
18 × 14 ft floor
278 sq ft
with 10% waste, rounded up (FL-01)
13 cartons
at 22 sq ft each; cartons are sold whole (FL-02)
5–15%
waste is crew practice, not a published rule (unverified)
One lot
keep one production lot together so the color matches

Moisture and acclimation See it on the job site

60–80 °F · 30–50% RH
room climate, HVAC on at least 5 days first (or the maker's range)
6 readings
20 per 1,000 sq ft, at least 3 per room (FL-07)
4 pts / 2 pts
max moisture gap, subfloor vs strip / plank (FL-03)
6–9%
typical flooring MC; the equilibrium MC is the real target
3/4–1 in
stickers between layers when you cross-stack
13% or lower
wood subfloor MC (trade press quoting NWFA)

Patch, sand and prime See it on the job site

Lead test first
on pre-1978 paint, or treat it as lead and follow RRP
Thin coats
fill in layers, sand between (crew practice)
Prime patches
stops flashing; stain-blocking primer over water stains
HEPA only
RRP: power sanding only with a shroud and HEPA vacuum; no open flame
100 g/L
VOC limit for primers, sealers, undercoaters (Rule 323.1)

Cut in and roll See it on the job site

365 sq ft
net walls of the 12 × 14 × 8 ft example room (PT-01)
3 gal
2 coats at 350 sq ft/gal; 350 is a rule of thumb, the can label governs (PT-02)
1/3
of the bristles loaded when cutting in (crew practice)
Dry = wet × solids
4 wet mils at 40% volume solids = 1.6 dry mils (PT-04)
1–2 h
recoat on one matte label [S32]; read your can
50 g/L
VOC limit for flat paint in the county (Rule 323.1)

Mask and spray the doors See it on the job site

12 in
gun to surface, at right angles (Graco FTx gun manual)
3,600 psi
max working pressure of that gun. Airless can inject paint through skin: a cut-looking wound is a medical emergency
Relieve pressure
whenever you stop spraying, check or service, or install or clean the tip
Guards on
always spray with the tip guard and trigger guard in place
Back-roll
sprayed walls get back-rolled for even texture (crew practice)

Nail down the strip floor See it on the job site

3/4 in
perimeter expansion space, general rule (NWFA); the maker sheet governs
6–8 in
blind-nail spacing for solid strip (NWFA); some makers say 8–10 in
1 1/2–2 in
cleat length through the tongue (NWFA)
45°
cleat angle through the top of the tongue on a flooring nailer (typical; check the nailer manual)
6 in
minimum end-joint stagger for strip (NWFA); 8–10 in for 3–5 in plank
Row 1
top-nailed and blind-nailed
Mix cartons
lay from several cartons for even color (crew practice)

Float LVP on the slab See it on the job site

ASTM F2170
in-situ RH: probe at 40% of slab depth (one side drying), 24 h to settle
3 tests
for the first 1,000 sq ft, plus 1 per extra 1,000 sq ft
48 h
room at service conditions before testing
Maker limit
slab RH limits are product-specific (75% to 99% across the guide's sources)
1/8 in
perimeter gap on one loose-lay plank sheet [S22]; use your sheet

Sand and finish the oak floor See it on the job site

36–40 → 60 → 80
typical drum grit sequence; never skip [S11]
Edger = last drum grit
so the border matches the field
2–3 h
between waterborne coats on one maker's sheet (EU data sheet); read yours
Over 24 h
between coats: that maker requires sanding before the next coat
275 g/L
VOC limit for wood coatings; floor coatings 100 g/L (Rule 323.1)
Oily rags
oil-based finish rags can self-heat: dispose of them per the label (check)

Inspector walk: the punch list See it on the job site

Raking light
light low and across the surface for the punch walk (guide §14, crew practice)
Edger = drum's last grit
or the border shows through the finish (guide §10 [S11])
Lift the drum
never let it sit down on the floor while it spins (guide §10, crew practice)
Vacuum every grit
and before every coat (guide §10 [S11])
Prime every patch
or it flashes (guide §11)
8 failures
the guide lists the eight expensive ones in §14

Construction project management

Mobilize the site See it on the job site

1 per 20
toilets: one per 20 employees of each sex, or fraction; kept clean with paper (8 CCR 1526)
65%
minimum C&D waste recycled or salvaged (CALGreen 2025, 4.408.1)
180 days
City permits: start within 180 days and pass an inspection at least every 180 days. County rules (check)
Day 1
first toolbox talk on mobilization day (guide 9)

Morning tailgate meeting See it on the job site

10 working days
tailgate or safety meeting at least this often (8 CCR 1509)
80°F
shade must be available for everyone on break (8 CCR 3395)
1 qt / hr
water per worker, free and cool (8 CCR 3395)
95°F
high-heat procedures: pre-shift meeting, observation, reminders (8 CCR 3395)
7.5 ft
fall protection required above this height at edges (8 CCR 1670)

Daily log and photos See it on the job site

Under 10 min
the Day 1 drill: one real day's log with 3 photos (lesson plan)
Every day
same format: date, weather, crew, hours, work, deliveries, inspections, visitors, delays, instructions, safety, photos (guide 7)
Temp
record it; heat rules depend on it (guide 9)

Price to margin, not markup See it on the job site

$12,500
$10,000 cost at a 20% margin (lesson plan Day 1; guide 3)
16.7%
the margin you actually keep on "cost plus 20%"
25%
the markup that keeps a 20% margin: margin ÷ (1 − margin)
26.5%
15% overhead then 10% profit, stacked (guide 3)

Read the schedule board See it on the job site

34 days
the guide's 12-task example, critical path A-B-E-G-H-I-K-L
Float
LS − ES; zero float means critical
1 day
plumbing float: a 2 day slip would push the finish 1 day
15 / 20 = 75%
percent plan complete, no partial credit
1 day + 1–2 days lag
each inspection as its own activity (guide 10)

Take a delivery against the PO See it on the job site

Order date
= date needed on site − lead time − 1 to 2 week cushion (guide 6)
4–8 weeks
standard vinyl windows lead time, Arizona source only; get yours in writing (guide 6)
Before you sign
note shortages and damage on the ticket (common practice, check your supplier terms)

RFI and change order See it on the job site

$3,771.81
guide example: $3,002 direct + $115.20 ripple + $311.72 overhead + $342.89 profit
Before work
California home improvement: change orders written and signed by both sides (guide 7, 8)
7 days
a common RFI answer habit, not a rule: set it in the contract (guide 7)
5–10%
common markup on a sub's change order, with their backup (guide 4)

Rough inspection walk See it on the job site

Before cover
inspectors must approve work before it is covered (guide 10)
1 day + 1–2 lag
schedule each inspection as its own activity (guide 10)
5 roughs
framing, mechanical, electrical, plumbing, insulation (guide 12, 16)
County
Montecito is unincorporated: County of Santa Barbara inspects. Request method and hours: check

Cost report, billing and lien waivers See it on the job site

$412,000
revised contract = original + approved change orders
66.67%
percent complete = cost to date ÷ estimated total cost
$25,333
overbilled = billed − earned (guide 4 example)
16.3%
projected gross profit $67,000 on $412,000
7 days
pay subs after you are paid; 2% per month penalty (B&P 7108.5, guide 8)

Punch list and closeout See it on the job site

3 · 6 · 9 · 12
months: warranty check-in calls (guide 12)
15 days
owner records the notice of completion within 15 days of completion (guide 12)
45 days
retention owed to the prime is due within 45 days after completion (guide 12)
2 weeks
post-job review: budget vs actual, sub scores, three lessons

Superintendent's site walk See it on the job site

7.5 ft
fall protection at open edges (8 CCR 1670, guide 9)
42–45 in
guardrail top rail; midrail halfway (8 CCR 1620)
2 ft
materials, equipment and spoil kept back from an excavation edge (8 CCR 1541(j)(2))
4 ft · 25 ft
trench depth that needs a ladder or ramp, within 25 ft of travel (8 CCR 1541(c)(2))
Before you sign
count the drop against the PO and note shortages on the ticket (check supplier terms)