Two walls in one
The footing and grouted block core carry the load and resist earthquakes and soil pressure. The stone is set against the core in a mortar bed.
The golden sandstone walls along Montecito lanes and the Riviera were laid by hand, many by Italian masons, from boulders the creeks brought down. This course takes masonry apart: stone, block and brick, the mortar between them, how block is made, and a hundred years of how the South Coast built in stone.
The 3D scenes need WebGL, which this browser has turned off. Every word of the course is still here on the left.
A modern stone wall on the South Coast is usually two walls in one: a reinforced block core that does the structural work, and a stone face that does the beauty.
The footing and grouted block core carry the load and resist earthquakes and soil pressure. The stone is set against the core in a mortar bed.
Concrete block has hollow cores. Rebar runs up through them and fine concrete (grout) fills them, turning a stack of blocks into a reinforced wall.
WhyUnreinforced masonry is very strong in compression and has almost no strength sideways. Steel and grout fix that.
Each stone is chosen, split and trimmed to fit its neighbors, then set in mortar with the joints raked back so the stone, not the mortar, reads.
Santa Barbara: Local sandstone is often called Santa Barbara or Montecito stone. It comes from boulders rather than a quarried bed, and splits by hand to show its golden color.
Each masonry unit has a job it does best.
Rubble walls use stone close to its natural shape. Ashlar is stone dressed into rectangular blocks. Both are cut from local sandstone boulders.
Standard block is nominally 8 by 8 by 16 inches, hollow so it can take steel and grout. Most retaining walls and many garden walls start as block.
Fired clay brick lines chimneys, paths and garden walls. Adobe, sun-dried mud brick, is what the Mission-era buildings were made of.
WhyFired brick is hard and weather-resistant. Adobe must be kept dry under wide eaves and plaster.
Mortar is cement, lime, sand and water. Its type (M, S, N or O, strongest to softest) is chosen for the job; soft lime mortars are used to repair old stone and brick.
WhyMortar should be weaker than the stone. If it is harder, the stone cracks instead of the joint.
Stone is found and split. Block is made in a press. Both end on a pallet at the job.
Sandstone is gathered as boulders, split and sawn, and trimmed by hand. Concrete block is made by machine: a stiff, dry concrete mix is pressed and vibrated into steel molds, then cured.
Masons read the grain, then split boulders with feathers and wedges or a saw, and dress the face with a hammer and chisel.
Santa Barbara: Fine Homebuilding profiled Santa Barbara mason Benny Soto, who started out carrying stone for Italian masons and dressed local sandstone with traditional hand tools for sixty years.
A block machine vibrates a nearly dry mix into molds and strips them instantly, so the green blocks stand on their own while they cure in a warm, humid kiln.
Masonry fails slowly and expensively. Most failures trace back to the footing, missing steel or trapped water.
Behind a retaining wall go waterproofing, drain rock wrapped in fabric, and a perforated pipe that carries water to daylight, plus weep holes where required.
WhyWet soil pushes much harder than dry soil. Most retaining-wall failures are drainage failures.
Retaining walls over 4 feet measured from the bottom of the footing, or holding back a sloped or loaded backfill, generally need engineering and a permit.
Stone or brick veneer on a wood-framed house is attached with corrosion-resistant ties and an air space, or applied over lath and a water-resistive barrier for thin adhered stone.
WhyWater always gets behind veneer. The gap and the barrier give it a way out.
The story starts before the hundred years: the Mission was built of local stone and adobe, and the techniques never left.
Chumash laborers cut stone from the Mission Creek area for the Mission, its aqueduct and the dam that still stands on Mission Creek, and built in sun-dried adobe block, often on a stone base and finished with lime plaster.
From the 1890s, British and then Italian masons built the sandstone walls, bridges and gateposts of the Riviera and Montecito. Riviera developers hired crews that worked on the hillside walls for years.
The 29 June 1925 earthquake brought down chimneys across the city and much of downtown State Street. Unreinforced brick was the weak link.
Reinforced concrete block became the standard for retaining and garden walls: cheaper, faster and engineered.
Engineered block or concrete cores faced with local sandstone, plus repair work in lime mortar on the old walls that give the South Coast its look.
Every course ends on one building: a 710-square-foot ADU on Canon Drive in the Santa Barbara foothills, modelled from its permit set before pricing. Three gables, three floor levels, a steel canopy, and a list of questions the drawings left open. Here is a building with almost no masonry, and why that matters.
This ADU has no stone veneer or block walls. Where an older house would show a stone base, it shows a board-formed concrete plinth. A mason reading this set still prices the site walls and steps, and nothing on the building itself.
The site steps and pads around the patios are poured concrete with 6-inch risers. Their outlines on the plans are approximate, so the bid carries them as an allowance until the site plan is dimensioned.
In the high fire area, the first 5 feet around the walls should stay noncombustible: concrete, gravel, stone. That is where masonry and hardscape do fire work as well as garden work.
Stone walls, chimneys and patios are where many South Coast renovations start.
A masonry fireplace is a firebox lined with firebrick, a damper and smoke shelf above it, a smoke chamber that narrows into the flue, and a clay liner running up inside the chimney to a cap. The hearth extends out in front, and wood like the mantel stays a set distance from the opening.
WhyMost chimney fires and many smoke problems trace to a cracked liner or a damper left open. A camera inspection of the flue comes before any remodel that uses the fireplace.
A leaning or bulging stone wall usually has a drainage or footing problem. Repointing with a lime mortar that matches the original keeps an old wall breathing. On the Cannon Drive ADU the only masonry is the board-formed concrete plinth at the base of the walls.
When mortar crumbles, joints are raked out about three-quarters of an inch and refilled in layers with a mortar matched to the original. On old masonry that usually means a lime mortar softer than the brick, tooled to match the old joint.
WhyHard portland cement mortar in old brick traps water and forces the brick to crack and spall instead of the joint. Softer mortar is meant to be the part that wears.
Unreinforced brick chimneys are among the first things to fail in an earthquake. Many are braced, rebuilt with steel, or replaced above the roof with a lightweight flue. The Cannon Drive ADU has no chimney or flue: it heats and cools with a heat pump.
An old masonry fireplace that is unsafe or unused can keep its face and hearth and get an insert: a sealed gas or electric unit set into the firebox, with a stainless liner run up the old flue for venting. The fireplace keeps its look and stops pulling warm air out of the house.
WhyMany South Coast jurisdictions and air rules limit new wood-burning fireplaces. A gas or electric insert in the original surround is often the way to keep the room's focal point.
An unreinforced brick chimney is heavy at the top and cracks at the roofline in an earthquake. One fix braces it with steel to the roof framing. Another takes it down to the roofline and rebuilds the top as a light framed chase, finished in stucco or veneer to match, around a listed metal flue.
WhyMany South Coast chimneys fell in 1925 and again in later quakes. The rebuilt top looks the same from the street at a fraction of the weight.
Taller retaining walls need engineering. Visible walls and gates in Montecito and parts of Santa Barbara go through design review, which favors local stone. On the Cannon Drive ADU the only masonry is the board-formed concrete plinth at the base of the walls.
The carved stone around a Spanish Colonial Revival door, the twisted columns and the window grilles of cut stone are either quarried limestone, carved by hand, or cast stone: a dense concrete made in molds to look like it. Each piece is set in mortar and tied back to the structure with stainless pins and anchors, never plain steel, which rusts and splits the stone.
WhyA cracked surround on an old house is usually rusted steel inside it. Repairs use stainless or bronze pins.
Santa Barbara: The Santa Barbara County Courthouse and many Montecito estates carry this kind of work; repairs are matched in color and texture to the original.
An outdoor fireplace is built like an indoor one: a reinforced footing, a firebox lined in firebrick, a smoke chamber and a flue tall enough to draw, with a spark arrestor on top and a non-combustible hearth in front. Many owners now choose gas, and in high fire hazard areas the fire district may limit or prohibit wood-burning outdoor fires, so the fuel is settled with the district before the masonry is designed.
WhyThe chimney height decides whether the smoke goes up or into the loggia. It is set by the flue size and what is nearby, not by looks.
Santa Barbara: Much of Montecito and the Santa Barbara foothills is in a very high fire hazard severity zone. Ask the fire district first.
The white powder that appears on brick, block, stone and plaster is efflorescence: soluble salts carried out by water and left behind when it evaporates. It is a sign of water, not a material fault. Brush it off dry and watch: if it comes back, find the water, usually a missing or cracked cap, a gutter that spills on the wall, sprinklers hitting it or soil piled against it. Acid washing only treats the symptom and can etch the face.
WhyOwners see a stain; a good mason sees a leak. Fix the water and the bloom stops.
Stone is strong in compression and weak in bending, so an opening in a stone wall needs a way to turn the load above it into compression. A true arch does that: each wedge-shaped voussoir pushes on the next, the keystone locks them, and the arch pushes outward at its feet, which is why it needs heavy jambs or a wall beside it to push against. In a modern veneer wall the stone above an opening usually sits on a steel angle lintel that carries it to the framing, and the arch is often a facing over that.
WhyAn arch with nothing beside it to push against will spread and crack. Ask the engineer what the jambs are doing.
Santa Barbara: Hand-laid sandstone arches are a Santa Barbara signature, from the Mission to estate gates in Montecito.
Adobe is unfired earth block, laid in mud mortar and protected by a plaster coat and a good roof. It survives for centuries if it stays dry at the top and bottom and can breathe. The classic mistake of the last century was to patch adobe with hard cement plaster and cement mortar: they trap moisture, the earth behind them turns soft, and whole sections fall away. Repairs use mud mortar, matching block and lime plaster, and the fixes that matter most are a sound roof, good drainage and a dry footing.
WhyOn an adobe, the wrong patch does more damage than the crack it covers. Match the material, then fix the water.
Santa Barbara: Casa de la Guerra, the Presidio buildings and a handful of private adobes in Santa Barbara and Montecito are cared for this way.
Mortar smears and haze are cleaned off new work, but the wrong cleaner does lasting damage. Strong acid etches limestone and marble, burns colored mortar and can stain light brick. The mason waits until the mortar has cured enough, picks a cleaner made for that material, tests it on a hidden patch, wets the wall before applying it so it stays on the surface, scrubs with a soft brush and rinses at low pressure. A pressure washer can cut open fresh joints.
WhyMost stains on new stone come from the cleaning, not the building. Test first.
Brick and stone veneer are not waterproof; rain soaks in and runs down the back of the veneer. The wall is built to let it out: an air space and a water-resistive barrier behind the veneer, flashing at the base and over openings, and weep holes in the bottom course, no more than 33 inches apart under the residential code, kept clear of mortar droppings. Veneer with no way out holds water against the framing.
WhyMortar droppings that fill the air space block the weeps from behind. Keep the cavity clean as the wall goes up.
Stone is part of what design review protects on the South Coast. We build new walls on engineered cores and repair old ones in the original manner.
Masonry is new to the school. The crew job sites for foundations and site work cover the footing and drainage every wall starts with.
In California, a license is needed for any job of $1,000 or more in labor and materials, any job that needs a permit, or any job where the worker hires help. Look up the contractor’s license number at cslb.ca.gov and check it is active and carries the right class:
The install chapter as a list to walk before you call the work done. Ticks stay in this browser only. Prints on one page.
Masonry and stone · Job: ________________ · Date: __________ · Checked by: ________________
The same drill our crew uses: give the answer in two sentences before you open each one. If you can only name the thing, read that chapter again.
Unreinforced masonry is very strong in compression and has almost no strength sideways. Steel and grout fix that.
From chapter: Inside a wall
Mortar should be weaker than the stone. If it is harder, the stone cracks instead of the joint.
From chapter: Kinds of masonry
Most chimney fires and many smoke problems trace to a cracked liner or a damper left open. A camera inspection of the flue comes before any remodel that uses the fireplace.
From chapter: Your house
Many South Coast chimneys fell in 1925 and again in later quakes. The rebuilt top looks the same from the street at a fraction of the weight.
From chapter: Your house
The chimney height decides whether the smoke goes up or into the loggia. It is set by the flue size and what is nearby, not by looks.
From chapter: Your house
On an adobe, the wrong patch does more damage than the crack it covers. Match the material, then fix the water.
From chapter: Your house
18 terms in plain English, with the Spanish our crew uses. All 249 words across the school are on one page.
A golden, buff sandstone found as boulders in South Coast creeks and canyons, also called Montecito stone. It splits by hand and has been used for walls, bridges and buildings since the Mission was built.
Generally, retaining walls more than 4 feet tall measured from the bottom of the footing, or holding back a slope or a load such as a driveway, need a permit and engineering. Check with the City or the County for your parcel.
Usually because water builds up behind it or the footing was shallow. Fixes range from new drainage to rebuilding on a proper footing.
Yes. Old walls are repaired with matching stone and a lime mortar softer than the stone, so the wall can move and dry the way it was built to.
Ask the fire district first. Much of Montecito and the Santa Barbara foothills is in a very high fire hazard severity zone, where the district may limit or prohibit wood-burning outdoor fires. Many owners choose gas. Either way the fireplace needs a reinforced footing, a firebrick firebox, a properly sized flue and a spark arrestor.
Rules change with each code cycle, and the plans, the inspector, the adopted code and the maker’s instructions overrule any course. Code references are to the 2025 California Building Standards Code (Title 24), in force since 1 January 2026; check the local amendments of the city or county. This page was checked against these on 18 November 2026: