AMN Construction
The rear of the Montecito Residence at dusk: white plaster walls under a dark roof, and a wide glass wall slid open from the lit kitchen onto stepped hardwood decking and the lawn
AMN Construction · Selected work · Montecito Residence

Custom home · MontecitoThe Montecito Residence.

Built from the ground up to one brief: make a large house feel like somewhere a family actually lives.

LocaleMontecito
ScopeCustom residence
DurationFour years
Completed2023
AuthorityCounty · Montecito BAR

The brief

Comfort and belonging were the owners' words. A house this size becomes a sequence of rooms nobody sits in unless someone works to prevent it. So the plan follows how the family moves through a day.

They wanted it open to the garden: at the back, the kitchen's glass wall slides away onto a stepped deck and the lawn.

The specification is chosen for the ocean nearby. Fixtures, fasteners and window assemblies that last indefinitely two miles inland start failing here within a few seasons.

Almost none of the work that makes a large house feel like a home is visible in the finished rooms.
Matt Newman, principal

The constraint

A new house in Montecito is a permitting project before it is a building one. The house went through County Planning and Development and the Montecito Board of Architectural Review, which normally meets every two to three weeks.

That review was the hardest part of the job, and the part a family most needs someone else to carry.

The build

From the first walk to a home.

  1. 2019The project beginsDesign, then review by County Planning and Development and the Montecito Board of Architectural Review.
  2. 2019 – 2023Built from the ground upFour years in all, review included.
  3. 2023Moving inThe owners led the final punch walk themselves.

Specification

Chosen for a house close to the ocean

Invisible on completion day, and nearly the whole story of how a house looks in year ten. We publish the list so an architect can see at once whether we understood the drawings.

ElementSpecified
Exterior wallsBoard-and-batten siding in a dark stain at the approach; smooth white plaster at the garden elevation
RoofDark shingle with deep, clean eaves
GlazingBlack-framed windows with horizontal divided lites; a wide sliding glass wall at the kitchen
Porch and deckTimber posts and exposed rafters at the porch; stepped hardwood decking to the garden
FlooringWide-plank oak
KitchenConcrete-finish waterfall island; oak drawer fronts in painted gray-green frames; handmade glazed tile; open oak shelving
LandscapeGravel path edged in fieldstone; drought-tolerant grasses

Outcome

The owners led the final punch walk themselves, as we prefer: the people who will live in a house write a better list than the people who built it.

Next project · Mission area, Santa Barbara

MissionSee the project

Where it is

The Montecito Residence, Montecito

About 4 miles east of downtown Santa Barbara. The pin marks the neighborhood, never the house.

Every project on the map

Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story

Inquiries

Something like this, on your parcel?

Email the address to purchasing@amnbuild.com. Matt reads it himself and writes back within two business days.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing