The free parcel reading: what you get back, line by line
Send an address or a parcel number and, within two business days, Matt sends back a written reading of what the ground allows. Owners ask what that actually is before they send. Here is the outline, and a sample written for an imagined Montecito lot.
The short answer: send an address or parcel number and, within two business days and at no charge, you get a written reading: who reviews a house there, the coastal and fire questions, the site facts to confirm, where in our published cost range the project is likely to land, the typical time, and what to commission first.
What you send
An address or an Assessor's parcel number, and a sentence on what you have in mind: a new house of about this size, a remodel, an ADU. Drawings, a survey or a listing help if you have them, but none is needed.
A sample reading
| Line | What the reading says |
|---|---|
| Who decides | County of Santa Barbara, Montecito Community Plan area. Exterior design goes to the Montecito Board of Architectural Review in three stages: conceptual, preliminary, final. |
| Coast | Outside the Coastal Zone, so no coastal permit. Confirm on the County map. |
| Fire | Mapped high fire hazard area: wildland building standards apply, and Montecito Fire reviews access, water and landscape. |
| Site facts to confirm | A creek along the east line (setback and drainage), a slope that will need a soils report, sewer or septic, and whether the water meter can serve a new house. |
| Order of cost | Our published 2026 range for a custom residence is $600 to $1,800 a square foot before land and fees. For this house and site, the reading names where in that range it is likely to land, and why. |
| Time | Typically 17 to 34 months from first conversation to move-in; review is the longest stretch, and a dig planned for spring or summer avoids the November-to-April erosion-control season. |
| Next step | What to commission first (survey, soils, architect) and in what order. |
What it is not
It is not a survey, a title report, a soils report or legal advice, and it is not a bid. It tells you what to check and in what order, with every rule confirmed against the County or City before anyone relies on it. What to check before you buy.
What happens after
Nothing, unless you ask. There is no follow-up sequence and no call from anyone else. If a design follows, we build the house as a 3D model from the full plan set and check it against every sheet before a price is fixed. Build it first.
Related: buying a lot, the Montecito BAR and who permits, town by town
Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Send us the address. The reading is free.
Email purchasing@amnbuild.com with the address or parcel number. Matt reads it himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated November 2026