Chapter 1 of 7
The words architects use.
Architects describe relationships: part to whole, solid to void, light to shadow. Learn a handful of words and you can read any house.
Massing
Massing is how a building’s volumes are arranged. Good massing breaks a big program into smaller, legible pieces so the house sits down in its landscape.
WhyA house that is one big box reads larger than it is. The same rooms broken into wings and a lower roof feel at home on the lot.
Solid to void and fenestration
The ratio of wall to opening, and the pattern of the openings. Spanish Colonial is mostly wall with few, deep-set windows; modern houses are mostly glass. Either works only when it is deliberate.
Hierarchy and the datum
Some elements matter more: the entry, the main stair, the living room. A datum is a line everything aligns to, a sill height or a cornice; you break it only on purpose.
WhyWhen windows line up with each other and with the door head, a facade looks calm without anyone knowing why.
Threshold and procession
Arrival is designed: gate, drive, forecourt, door, entry, then the view of the garden or the ocean. A threshold, a deep jamb, a step, a change of floor, is where a house slows you down.
Chapter 2 of 7
The column: a kit every trim piece borrows.
A classical column is a stack of named parts with fixed proportions. Doors, mantels and paneled walls borrow the same stack, so learn it once.
Pedestal, column, entablature
From the ground: a pedestal, the column itself (base, shaft, capital), and the entablature it carries (architrave, frieze, cornice).
WhyA mantel is two legs, a beam and a shelf. A door surround is the same thing in flat boards. Once you see the stack, you see it everywhere.
Base, middle, top
A paneled wall is divided the same way: a heavy base (the baseboard and wainscot), a plain middle, and a decorated top (the crown). The ratios come from the column.
The cornice sheds water
The cornice projects so rain drips clear of the wall below. Crown molding inside is the same profile, kept for its shadow line long after it stopped shedding water.
Proportion
Classical orders fix the column’s height as a multiple of its diameter. When a column is too thin for its beam, or a beam sits on no column at all, the eye knows it is wrong.
Santa Barbara: Columns that carry no entablature are a hallmark of 1990s spec "Mediterranean" houses, the cautionary tale of the Montecito Standard.
Chapter 3 of 7
The styles you will be asked to build.
Every style is a set of rules about walls, roofs and openings. Know the tells, the best local example, and the mistake people make when they fake it.
Spanish Colonial Revival
White plaster, low clay-tile roofs, deep-set windows, iron, tile and courtyards, 1915 to 1930. George Washington Smith’s Andalusian farmhouses are its purest local form.
WhyThe trap is thin walls and too much ornament. The style is restraint.
Monterey Colonial and Arts and Crafts
Monterey Colonial: two stories with a long second-floor balcony under the main roof. Arts and Crafts: exposed structure and joinery, wide eaves, built-ins; Greene and Greene set the bar for California woodwork.
Ranch and modern
Cliff May’s California Ranch: one story, low roofs, every room opening to the garden. Mid-century modern: post and beam, glass walls; Neutra’s Tremaine House (1947 to 1948) is the local landmark.
Italian villa
Symmetry, loggias, terraces and formal gardens on an axis, in stone or plaster. The trap is the beige-on-beige "Tuscan" spec house.
Chapter 4 of 7
A Spanish Colonial Revival house, piece by piece.
The same reading on the building every course ends on: a modern ADU in the Santa Barbara foothills. Each piece has a reason, and a trade that builds it. The styles of the South Coast, Spanish Colonial Revival first, are compared side by side in chapter 3.
The walls
Two materials, each where it works best: three-coat cement plaster on the north walls, facing the slope, and vertical Thermory Kodiak spruce on the south, east and west, facing the patio.
WhyTwo materials read as two decisions. The corner where they meet has to be a clean stop and a sealed joint, or the decision looks like an accident.
The roof
Three 7:12 gables, one for each floor level, in Verea flat clay tile, slate color, smooth. The plan steps down the hill, so the roof reads as three small houses instead of one long one.
Openings
Bronze anodized Western Windows: casements and fixed glass on the gables, wide sliders on the south to the patio. The steel canopy over the patio is painted to match the frames.
Base and garden
A board-formed concrete plinth where the building meets the slope, a covered patio, and planting kept back from the walls in the fire zone.
Chapter 5 of 7
The Montecito canon, 1786 to today.
Montecito’s reputation was made by a handful of architects and garden designers between 1900 and 1930, then fixed in place by an earthquake.
1786: the Mission
Mission Santa Barbara was founded in 1786; the present church was finished in 1820. It is the region’s first lesson in thick walls, plaster, tile and restraint.
1906: El Fureidis
Bertram Goodhue’s villa for J. Waldron Gillespie brought Persian and Italian garden ideas and set the ambition of the estate era.
1909: Wright in Montecito
Frank Lloyd Wright’s Stewart House on Hot Springs Road, his only Prairie house in California.
1916: George Washington Smith
Smith’s own house, El Hogar, brought the Andalusian farmhouse idiom: simple white masses, few openings in deep reveals. Lutah Maria Riggs joined him in 1921 and became his partner in 1924.
1925: the earthquake
After 29 June 1925, downtown Santa Barbara was rebuilt in one Spanish idiom, guided by a new Architectural Board of Review and a free Community Drafting Room.
1929: the Courthouse
The Santa Barbara County Courthouse by William Mooser Co. is the high-water mark of the style and a National Historic Landmark.
1947: the modern landmark
Richard Neutra’s Tremaine House showed that the South Coast could hold modernism too, with Lockwood de Forest on the site plan.
Chapter 6 of 7
The same trade, on a real ADU.
Every course ends on one building: a 710-square-foot ADU on Canon Drive in the Santa Barbara foothills, modelled from its permit set before pricing. Three gables, three floor levels, a steel canopy, and a list of questions the drawings left open. Here is how an architect's set reads when a builder takes it apart.
Three gables, three floors
The plan steps down the hill in three blocks: living and kitchen at 295'-6", bedroom and hall 18 inches higher, the primary suite a foot above that. Each block gets its own 7:12 gable, so the roof reads as three small houses instead of one long one.
WhyStepping the floors with the slope keeps each block close to the ground it sits on.
Plaster north, wood south
The north walls, facing the slope, are three-coat cement plaster. The south, east and west walls, facing the patio, are vertical Thermory Kodiak spruce, a heat-treated wood, with bronze anodized aluminum windows by Western Windows. Two materials, each where it does its best work.
What the set did not include
The set came without the dimension plan, the structural sheets, the electrical plan, the roof plan and the energy report. Every dimension in this model was scaled from the floor plan at 1/4 inch to the foot, accurate to about 3 inches, and marked that way. Submittal 3, the full set of 35 sheets, then brought every one of them.
WhyA set with missing sheets can still be priced, but only if every assumption is written down where the next person will see it.
Check the model against the sheets
We checked the model against all nine sheets: 29 checks, 16 matched, 6 were within a few inches, and 7 were wrong in the first model and were fixed. The ridges, for example, sat about 5 inches high until the rafters were changed to match the sections.
Name the style, then the rules
Once the style is named, most decisions answer themselves: window type and depth, roof pitch and tile, trim or no trim, iron or wood.
Design review reads the same way
Montecito’s Board of Architectural Review and Santa Barbara’s design boards judge bulk, scale, neighborhood compatibility, materials and color. Speaking their language shortens the process. On the Cannon Drive ADU the only masonry is the board-formed concrete plinth at the base of the walls.
Additions should look like they belong
An addition matches the original’s wall depth, roof pitch, tile and openings, or deliberately steps back from it.
The deep window
A Spanish Colonial Revival window reads as old because of its depth. The wall is thick, the steel casement sits close to the outside face, the jambs splay open toward the room to spread light, and the deep sill is often tiled and sloped. On a new house the look comes from furring the wall out and framing the splay.
WhyA modern window set flush in a thin wall looks wrong on a Spanish house however good the window is. The depth is the detail.
The materials board
Design review boards judge real samples, not just drawings. A materials board shows the stucco finish and color, the roof tile blend, window frame color, wood for doors and beams, the iron finish and the paving, as they will be built. The approved board becomes the standard the job is held to.
WhySwapping an approved material later can mean going back to the board. Lock the samples before construction drawings are final.
How a Montecito estate is planned
Many Spanish and Mediterranean estates are planned around a courtyard: the house wraps an outdoor room on three sides, a loggia gives shaded open-air rooms along it, a fountain sits on the main axis, and a gated wall separates the motor court, where cars arrive, from the garden. Moving through gate, courtyard and loggia is the threshold and procession idea at the scale of a whole property.
WhyAdditions to these houses work when they keep the courtyard and the axis. One that fills the courtyard or blocks the axis usually fails design review.
Interiors: light in layers
Interior design on a remodel is settled in schedules: finishes, fixtures and lighting chosen and written down before work starts. Lighting is planned in layers: ambient light that fills the room, task light where hands work, and accent light on art, beams or plaster texture, each on its own dimmer.
WhyEvery fixture location is a wire and a box at framing. A lighting plan done before rough electrical avoids patching ceilings later, which on plaster and beamed ceilings is expensive.
Loggias and arcades
The loggia, a roofed room open to the garden through a row of arches, is the signature space of a Montecito house. Its arches spring from one height, the piers are thick enough to read as solid masonry, the openings are taller than they are wide, and the roof is usually a tile shed on exposed rafters. Proportion does the work: thin posts or squat arches read as a patio cover, not a loggia.
WhyDesign review looks for exactly these proportions. Build a quick model of one bay before the framing is cut.
Compression and release
Plans show where rooms are; the section shows how they feel. The great South Coast houses use height deliberately: a low, sometimes dark entry, then a room that opens up to twelve or fourteen feet under beams, so the big room feels bigger than its size. Ceiling heights also drive cost, the height of windows and doors, the scale of trim and whether a stair fits, so they are settled with the plans, not after.
WhyCeiling height changes the trim, the window heads and the drywall in every room. Read the sections before pricing the finishes.
The courtyard house
The Andalusian and Spanish Colonial tradition the South Coast borrowed from is a house turned inward: rooms wrapped around a courtyard, often with a loggia on one side for shade, and a fountain or a tree at the center. The street side stays quiet; the life of the house faces the court. In this climate the court is a room used most of the year, and every door, window and floor level around it is designed to make inside and outside one space.
WhyIn a courtyard house, door thresholds, drains and floor heights around the court are one design. Get them together early.
Gable, hip and shed
Most South Coast roofs are made of three forms. A gable has two slopes meeting at a ridge, with a triangle of wall at each end; it is the Spanish Colonial and Craftsman default. A hip slopes on all four sides, with no gable walls, and reads lower and calmer; it suits Monterey and Italianate houses and resists wind better. A shed is a single slope, for wings, porches and lean-to rooms. Mixing them carelessly is what makes an addition look added on.
WhyThe roof form decides the framing, the flashing and the gutters. Match the existing form on an addition unless the architect says otherwise.