AMN Construction
AMN Construction · Writing · Renovation

Seismic retrofit for an older house: bolt it, brace it, and do it while the walls are open

Many South Coast houses built before about 1980 sit on raised foundations, held there mostly by their own weight. In a strong earthquake a house like that can slide off. The fix is usually simple and not expensive, and a remodel is the best time to do it.

Renovation

The short answer: a house on a raised foundation with no bolts tying it to the concrete, and cripple walls without plywood, should be bolted and braced. A typical retrofit runs $3,000 to $7,000 per the state program, which offers grants of up to $3,000 in listed ZIP Codes, and a remodel is the cheapest time to do it.

Send your plans to Matt

Which houses need it

Houses on a raised foundation, with a crawl space under the floor, and especially those with short "cripple" walls between the foundation and the first floor. If you can see wood framing standing on the concrete in the crawl space and no steel bolts or plates tying the two together, the house is a candidate.

What the work is

Bolting ties the wooden sill to the concrete foundation. Bracing adds plywood to the cripple walls so they cannot fold over. It is done from the crawl space, usually in days, without touching the rooms above. The state program puts a typical brace-and-bolt retrofit at $3,000 to $7,000.

The state grant

The California Earthquake Brace + Bolt program offers grants of up to $3,000 toward the work, for houses on a raised foundation in its listed ZIP Codes; ZIP Codes in and around Santa Barbara were added in 2024. Registration opens for set periods, and the work must be done by a contractor who meets its rules. Check your ZIP Code on the program's site.

When it is more than bolts

Tall cripple walls, a house on a slope, an addition on top, a masonry chimney or a foundation that is cracked or unreinforced all call for an engineer's design rather than the standard plan. So does a remodel large enough that the building department asks for a structural upgrade. That is engineering, and it belongs in the drawings, not on a change order.

Do it with the remodel

When floors and walls are already open, bolting and bracing costs less and disturbs nothing new. We check the crawl space during feasibility and price the retrofit with the rest. What else is usually behind the walls.

Related: what is behind the walls, remodel or rebuild and renovations

Ask Matt about your project More writing

Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story

Inquiries

Send us the address. We will look under the floor.

Email purchasing@amnbuild.com with the address and the year the house was built, if you know it. Matt reads it himself and writes back within two business days.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing

Updated November 2026