AMN Construction
AMN Construction · Writing · Renovation

Can you live in your house during a remodel? Often, with a plan

Staying home saves rent and keeps an eye on the work. It also costs time, patience and sometimes money. The answer depends on which rooms are out, for how long, and who lives there. Here is how we help owners decide, before the contract.

Renovation

The short answer: often yes, with the work phased so a kitchen or bathroom always works, though it takes longer. Usually not if the only kitchen or bathroom is out for more than two weeks, if most of the house is opened at once, or while lead or asbestos is being removed.

Send your plans to Matt

The short rule

Often yes, with phasing, though it adds time. Usually not if the only kitchen or the only bathroom will be out for more than two weeks, or if the work touches most of the house at once.

What decides it

  • The rooms that go out of service: a second bathroom and a temporary kitchen make staying possible.
  • Dust: demolition, sanding and plaster make fine dust. Sealed plastic walls, a zipped door and air filtration keep most of it in the work area, not all of it.
  • Power and water shutoffs: a rewire or a repipe means days without one or the other.
  • Who lives there: infants, anyone with asthma, people working from home, and pets that do not like strangers.
  • Working hours: inside the City of Santa Barbara, construction noise is allowed from 7 a.m. to 8 p.m. every day on standard projects (City noise guide (opens in a new tab)). In Montecito the Montecito Association gives 7:00 a.m. to 4:30 p.m., Monday to Friday (Montecito Association (opens in a new tab)). A permit can set narrower hours, and we can agree on quieter ones.
  • Lead and asbestos: in an older house, nobody stays in the area while either is being removed.

How phasing works

We split the house into zones and finish one before the next is opened, so there is always a kitchen or a bathroom working. The schedule is longer, because trades come back for each zone instead of once. We agree working hours and the path crews use through the house, and we write both into the plan.

When moving out pays

Moving out lets every trade work the whole house at once, which shortens the job, and on a large remodel that can cover a good part of the rent. Furnished rentals on the South Coast are not cheap and not always available on short notice, so plan the move when the schedule is set, not when demolition starts.

Decide it before the contract

Whether you stay changes the schedule, the sequence and the price, so we settle it in preconstruction, with the phases drawn on the plan. Renovations and the seven phases.

General information for owners. Where lead paint or asbestos is present, removal follows the federal and County rules; see what is behind the walls of an older house.

Related: what is behind the walls, reading a construction schedule and kitchen remodels

Ask Matt about your project More writing

Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story

Inquiries

Tell us about the house. We will plan the phases with you.

Email purchasing@amnbuild.com with the address and who lives there. Matt reads it himself and writes back within two business days.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.

CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing

Updated November 2026