Tom's Geometrical Tables
Tables and wall panels pieced together from wood cut into geometric shapes, made to order for your room.
- 50 years at the bench
- Built in Carpinteria
- CSLB 802739
- 5.0 on Google, 4 reviews


Piece by piece
It starts with one diamond.
Every pattern begins as a single cut piece of wood.
Three make a cube.
Light, medium and dark grain turn three flat diamonds into a block that seems to stand up off the table.
The cubes fill the top.
Piece after piece, the blocks tumble across the whole surface.
A border closes it in.
A mitered frame holds the pattern and gives the table its edge.
Then it's a table.
The drawing tells the story. The photo is the real thing, from Tom's shop.
Tables Tom has made
Every one was made to order. Yours can follow one of these or start from your own idea.
In the houses they were made for


In the shop








Who builds your table
“I build tables the way I build everything else, to fit your room and the people who sit around them.”
Tom has built custom cabinets and done finish carpentry for fifty years: in Oregon, in Hawaii, and across Los Angeles County, in Malibu, Pacific Palisades and Westlake Village. In 1992 he fitted the painted synagogue ceiling at the Martyrs Memorial and Museum of the Holocaust in Los Angeles.
Now he works from a small shop in Carpinteria with his son Nic. When you call the number on this page, Tom answers.
Great experience. Hired their finish carpentry crew for cabinet installs, shelving, etc. Excellent work, knew their stuff, plan on using them for more projects on my home build.
How an order works
Send a photo and a rough size
Text Tom a photo of the room, or call. Say what the table is for and about how big.
Talk it through
Pattern, woods, size and the base. Tom tells you what drives the price before anything is cut.
Built in the Carpinteria shop
Cut, laid out, glued and finished, one piece at a time.
Finished and delivered
Finished in the shop, then brought to your house. The oak pedestal tables went out as a set, already finished.
How the price is set
Every table is priced from the materials and the hours it takes, so the honest number comes after a short conversation. Four things move it most:
- Size. More top, more wood and more pieces.
- The pattern. Smaller pieces mean more cuts and more fitting.
- The woods. Some species cost more than others.
- The base. Legs, a pedestal or a base you already have.
Plan your table
Tap a few choices to see a sketch and get one message to send Tom. No form, no prices, and your choices stay in your own browser.
Questions people ask Tom
Can I choose the woods?
Yes. The tables here use maple, cherry and oak; the chevron dining table is maple. Tell Tom the look you want, or send a photo of the room, and he will suggest woods that suit it.
Do you make the legs or the base?
Yes. The chevron table stands on square legs and an apron built in the shop, and the oak tables sit on painted pedestals. Tell Tom what you have in mind, including a base you already own.
How long does a table take?
It depends on the size and the pattern, since smaller pieces mean more cutting and fitting. Tom will tell you when you talk it through, before anything is cut.
How much does a table cost?
Each table is priced from the materials and the hours it takes. Size, the pattern, the woods and the base move it most. Send a photo and a rough size and Tom will tell you what drives yours.
Can I bring my own pattern?
Yes. Send a sketch, a photo of a pattern you like, or a picture of the room. Tom builds to order, so a new pattern is the normal case, not the exception.
How do I look after a wood table?
Use coasters and mats under hot dishes, wipe up water and spills soon with a soft damp cloth, and dry the top. Keep it out of strong direct sun and away from heaters and vents, which can fade and dry the wood.
Made to order in Carpinteria.
818 201 4348Call or text Tom. A photo of the room and a rough size are all he needs to start.