The punch list and the first year. How a job should end
A job is judged twice: on the day you get the keys, and a year later. Here is how we run both, and what to watch for in a house that is still settling in.
The short answer: you lead the final walk with your own list, in daylight and again at night. At closing you keep the warranties, manuals and as-built drawings. Small cracks and sticking doors in the first year are normal settling; keep a list. We come back at twelve months whether you called or not, and our workmanship is covered for two years from final signature.
The punch walk is yours to lead
After the final inspection, you walk the house with your list, not ours. The person who will live there writes the better list. A few habits help:
- Walk twice: once in daylight, once at night with every light on. Paint and plaster show their flaws in low, raking light.
- Use everything: open every door, drawer and window; run every tap, shower and appliance; flush every toilet; try every switch.
- Write it down in one place, room by room, with a photograph of each item.
What you keep at closing
Warranties, manuals and as-built drawings: the record of what is behind the walls, so the next person who opens one is not guessing. The finished list is signed off item by item, and the final signature starts the warranty. How each phase ends.
A new house moves in its first year
Wood dries through the first heating season, and a house settles. Small things are normal: a hairline crack at a drywall corner, a door that starts to rub, a caulk line that opens, a cabinet door that needs a quarter turn. None of them is a sign that something is wrong. Keep a running list rather than calling about each one.
We come back at twelve months
At month twelve we come back whether you called or not, walk the house with you and work through the list. Anything urgent, such as water where it should not be, is a call that day, not a list item.
Two years, in writing
Our workmanship is covered for two years from final signature, in writing. Appliances, roofing, windows and equipment also carry their makers' own warranties, which come to you in the closing binder. What we put in writing.
Related: how a job runs, phase by phase, what we put in writing and when finish carpentry happens
Built by Matt Newman. Licensed since 2002. Salt Lake City, Los Angeles, twenty years on this coast, and on every AMN site himself. One name on the contract. His story
Planning a house? Start with how it ends.
Email purchasing@amnbuild.com with the address and what you have in mind. Matt reads it himself and writes back within two business days.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written answer: what we see in your plans or your parcel, an order of cost, and the next step.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The reading is yours to keep.
CSLB 802739 · Class B General Building · Licensed and insured · Two-year workmanship warranty, in writing
Updated November 2026