AMN Construction

San Roque.

The owners wanted a kitchen to really cook in, in a house that still felt like itself.

A kitchen range under a curved hand-finished plaster hood, with a full-height veined stone slab backsplash and ledge, cream Shaker cabinets, a black steel window, and walnut panel cabinetry with brass pulls
A hand-troweled plaster hood over a slab backsplash, beside walnut panels

The brief

A full remodel in San Roque: six months of construction, finished in 2026. The owners wanted a kitchen to really cook in, and a house that still felt like itself when it was done.

The kitchen is built around the range, under a hand-troweled plaster hood and a full-height marble slab, facing a wall of walnut.

The constraint

The hardest part: keeping the character of the house while everything in it was brought up to date.

Specification

What it is made of

ElementSpecified
Kitchen hoodHand-troweled plaster
BacksplashA full-height marble slab
CabinetryWalnut panel wall with long brass pulls; cream Shaker cabinets
ShowerGlazed green square tile to the ceiling, penny-round floor
BathTerracotta tile floor and a walnut vanity, under a skylight

Next project · Westside, Santa Barbara

WestsideSee the project

Where it is

San Roque, Santa Barbara

About 3 miles north of downtown Santa Barbara. The pin marks the neighborhood, never the house.

Every project on the map

Inquiries

Something like this, on your parcel?

Email the address to purchasing@amnbuild.com. A written assessment, free, in two business days. Yours to keep, whether or not we build together.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.
Email Matt