AMN Construction

Palo Alto.

Room for family, built from the ground up in Palo Alto: an accessory dwelling with a pool, custom throughout.

The back of a two-story house with vertical wood siding, a standing-seam metal hip roof and a wood trellis over a railed terrace, with stone steps down to a stone-paved pool deck and a rectangular pool
From the pool: a wood-clad upper floor, a trellis over the terrace

Next project · San Roque, Santa Barbara

San RoqueSee the project

Where it is

Palo Alto

About 250 miles north of downtown Santa Barbara. The pin marks the neighborhood, never the house.

Every project on the map

Inquiries

Something like this, on your parcel?

Email the address to purchasing@amnbuild.com. A written assessment, free, in two business days. Yours to keep, whether or not we build together.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.
Email Matt