AMN Construction

Carpinteria.

A garage in Carpinteria, now a junior accessory dwelling unit.

A wall of white Shaker cabinets with a stainless refrigerator built in between them, a butcher-block counter, and a glass door open to a garden patio
The pantry wall: fridge built in, garden door open

The brief

Finished in 2026. Under a vaulted ceiling: an L-shaped kitchen in white Shaker cabinets and butcher-block, a bath with a walk-in shower in glazed gray subway tile, and a glass door to a garden patio.

Next project · Montecito

The Loureyro PropertySee the project

Where it is

Carpinteria

About 11 miles east of downtown Santa Barbara. The pin marks the neighborhood, never the house.

Every project on the map

Inquiries

Something like this, on your parcel?

Email the address to purchasing@amnbuild.com. A written assessment, free, in two business days. Yours to keep, whether or not we build together.

  1. Same dayMatt confirms he has it, and flags anything obvious that is missing.
  2. Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
  3. Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.
Email Matt