What you shop for is under half.
Cabinetry and stone: usually under half the cost. The rest nobody photographs. A moved gas line. A bigger panel for an induction range. Make-up air for a high-CFM hood. The dining-room wall doing structural work nobody drew.
| Division | Share |
|---|---|
| Demolition and structure | 16% |
| Mechanical, electrical, plumbing | 22% |
| Cabinetry and millwork | 26% |
| Stone, tile and finishes | 20% |
| Appliances (allowance) | 8% |
| Supervision and overhead | 8% |
The hood, solved on paper.
A professional-grade hood can depressurize a tight house, affecting the fireplace, water heater and front door. We solve it at design, not after the ceiling closes.
Under $120,000, call a specialist.
We don't take standalone kitchens below $120,000. A specialist will serve you better for less, and we'd rather say so than staff it thinly.
Kitchens we have built.

Mission area, Santa BarbaraThe pantry: butcher-block counter, sage-green open cabinets, a wine refrigerator

Palo AltoThe kitchen: dark green cabinets, veined stone backsplash, rounded island

Westside, Santa BarbaraThe kitchen under its skylight: black stone counters, pale blue-gray Shaker cabinets

CarpinteriaThe pantry wall: fridge built in, garden door open

Palo AltoThe outdoor kitchen under the trellis
What owners ask first.
What does a kitchen remodel cost in Santa Barbara?
How long will I be without a kitchen?
Do I need a permit for a kitchen remodel?
Can you work with my kitchen designer?
Send us the address. We'll tell you the truth about it.
Email it to purchasing@amnbuild.com. A written assessment, free, in two business days. Yours to keep, whether or not we build together.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.

