Custom residences. Decided in the right order.
You want to build exactly the house, once.
- Range
- $1.5M–$5M
- Construction
- 10–18 months
- Warranty
- Two years, workmanship
Here entitlement, not the build, sets the schedule: grading, fire access, view corridors, coastal jurisdiction, and in several communities an architectural board with its own calendar. We identify all of it before design begins.

Sequence, not speed.
The order of decisions drives the schedule. Siting, massing, grading and access go to hearing, so they are settled first. Interiors carry lead times, not approval risk, and are resolved while entitlement runs.
A finished interior specification is worth very little if a board changes the massing.
Finishes are about a fifth.
Roughly a seventh of the cost is in the ground before anything shows, considerably more on sloped or coastal parcels. Structure and envelope, typically over forty percent. Interior finishes, the part everyone photographs, usually a fifth. Know it before selections: it shows where a budget can flex.
Your architect's set, priced as drawn.
We are not design-build. We price the set you drew, flag what won't build before plan check, and return it improved, not rewritten. The client relationship belongs to the architect who earned it.
- Sloped, constrained, and coastal-zone parcels
- Entitlement strategy settled before design development
- Architect and engineer coordination from the first week
- Allowance schedules you can plan against
- Fixed contract sum before construction begins
- Two-year workmanship warranty from final signature
Where the sun lands, through the year.
At Santa Barbara’s latitude the noon sun stands about 79° high at the June solstice and about 32° at the December solstice. Move the date, hour and eave, and watch where light falls in a south-facing room.
- Sun height
- Direction
- Into the room
Sun position computed with the NOAA solar equations for 34.42° N, 119.70° W, in Pacific time. A 9-ft room with its glass 2½ to 8 ft above the floor, drawn to scale.
Send us the address. We'll tell you the truth about it.
Email it to purchasing@amnbuild.com. A written assessment, free, in two business days. Yours to keep, whether or not we build together.
- Same dayMatt confirms he has it, and flags anything obvious that is missing.
- Within two business daysA written reading of your parcel: jurisdiction, review bodies, constraints, an order of cost and the permit path.
- Then nothing, unless you askNo follow-up sequence, no call from anyone else. The assessment is yours to keep, and to take anywhere.
