Accessibility statement.
The site should work for everyone, on any device, with any assistive technology.
Our commitment
We aim for amnbuild.com to conform to the Web Content Accessibility Guidelines 2.1 at Level AA.
What has been done
- Semantic structure and a logical heading order on every page
- A skip link to main content on every page
- Visible keyboard focus, and full keyboard navigation
- Labeled controls on the cost sheet, with its findings announced as they change
- Reduced-motion support, which unpins the scrolling sequence entirely
- Increased-contrast support, and a layout that holds at 200% zoom
- Descriptive alternative text on informative images
Known limitations
The drawn maps are pictures; every place they show is also listed in text on the same page. The site uses no third-party widgets, chat tools or embedded forms. If anything gets in your way, tell us and we will fix it.
Report a barrier
Write to purchasing@amnbuild.com or call 805 886 0988. Tell us the page and what happened. We respond within two business days, and will provide the information in another format if needed.